Header Area
Contact
Welcome to Renewables Map.

Loading

List of major Renewable Energy Schemes in the UK going live in 1997
Other Projects: Wind Farms | Hydro Schemes | Biomass | Waste | CHP | Wave & Tidal | Solar |    

Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 44.201.96.43
Active and Currently Generating
Building or Planning Approved
Proposed
  Refused or Cancelled (new listing)   NO
session(showworking) = librarian =
Status
Tech
  Projects currently Generating
 1
  Rheidol Wind Farm Wind 2.4 Wales SY23 3AB Cardiganshire 0 / 1997 17/11/2016  
 1
  Mynydd Gorddu Wind Farm Wind 10.2 Wales SY24 5DP Dyfed 0 / 1997 21/02/2016  
 1
  Llyn Brianne Hydro 4.35 Wales SA20 0PG Dyfed 1 / 1997 05/01/2017  
 1
  Cynwyd Hydro 0.13 Wales LL21 OLH Denbighshire 1 / 1997 05/01/2017  
 1
  Gweedore Wind Farm Wind 4.8 s.ireland Co. Donegal 1 / 1997 18/09/2017  
 1
  Sion Hydro 0.78 N.Ireland BT82 9HE Co. Antrim 1 / 1997 01/12/2017  
 1
  Cwmorthin Hydro 0.41 Wales LL41 3LQ Gwynedd 1 / 1997 05/01/2017  
 1
  Stangate Waste 4.5 England TN15 8PB Kent 2 / 1997 11/11/2016  
 1
  Corry Mt. Wind Farm Wind 4.8 s.ireland Co. Leitrim 3 / 1997 03/03/2019  
 1
  Elan Valley Hydro 2.95 Wales LD6 5HL Powys 5 / 1997 05/01/2017  
 1
  Caban Coch Hydro 1.1 Wales LD6 5HL Powys 5 / 1997 22/05/2017  
 1
  NETLEY Waste 0.9 England SO31 8GD Hampshire 6 / 1997 08/11/2016  
 1
  Barnesmore Wind Farm Wind 15 s.ireland Co. Donegal 7 / 1997 17/09/2017  
 1
  Drumlough Wind Farm Wind 5.3 s.ireland Co. Donegal 8 / 1997 19/09/2017  
 1
  Llanbabo Wind Farm Wind 20.4 Wales LL68 0TB Anglesey 10 / 1997 24/11/2016  
 1
  BRIXWORTH Waste 0.575 England NN1 2HZ Northamptonshire 11 / 1997 06/07/2015  
 1
  HAREWOOD WHIN Waste 2.376 England YO2 3BR Yorkshire 12 / 1997 06/10/2016  
 1
  Kilronan Wind Farm Wind 5 s.ireland Co. Roscommon 12 / 1997 15/09/2017  
 1
  Cark Wind Farm Wind 15 s.ireland Co. Donegal 12 / 1997 18/09/2017  
 6
  Harlock Hill Wind Farm Wind 2.5 England LA12 7SA Cumbria 1 / 1997 17/07/2017  
 9
  Meall an Tuirc Delete 17 Scotland IV16 9XW Highland 1 / 1997 09/12/2016  
 9
  Bendealt Delete 9 Scotland IV16 9XW Highland 1 / 1997 09/12/2016  
Status
  Site Name
Tech Capacity Region Postcode County Applied Approved   Go Live Updated

Back to map


Our aim is to continually improve this resource. If you can provide additional information such as relevant links, perhaps the status of the project, please use the form below.

Comments and Additional information
about:

Please regard the following as optional:
Your name and any other contact information:

Contact email address

Before submitting, please enter this code.access code
All letters to be entered as lower case:
Sadly, this is necessary to reduce the volume of inappropriate emails that we receive.

Recent News:

Wind farm work for Scottish and English sites
180 blades for offshore turbines are to be manufactured in Hull for a wind farm project in Scotland's Moray Firth The turbines will later be pre-assembled at the Highland port of Nigg before installation at the Moray West site
Source: bbc, Date and Time of entry: 24 June 2022 00:00

Siemens Gamesa bags firm turbine order for 882-MW Moray West
June 23 (Renewables Now) - Siemens Gamesa Renewable Energy SA (BME:SGRE) has secured a firm order to supply 882 MW of turbines for the Moray West offshore wind project off Scotland, the company said.
Date and Time of entry: 24 June 2022 00:00

RenewableUK says global offshore wind grows to 846 GW
The figure includes projects at any stages of development, from operational to planned, as well as 135 GW of overlapping proposed projects, mainly in Brazil, Taiwan and Sweden.
Source: renewablesnow, Date and Time of entry: 24 June 2022 00:00

Record Wind in Scotland Means Grid Tells Some Turbines to Stop
Wind farms across the UK are producing more electricity than the grid is able to cope with, forcing the network operator to ask some turbines in Scotland to shut down
Source: bloomberg, Date and Time of entry: 01 June 2022 00:00

Proposed Watten wind farm raises objection from pressure group
The proposed Watten wind farm by EDF Renewables would have up to eight turbines with a total generating capacity of up to 52 MW. The site would be located approximately 3km to the southwest of Watten, on land owned by local families.
Source: jhnogroatj, Date and Time of entry: 01 June 2022 00:00



Can you help?  

The aim is to continually improve this resource. If you can provide additional information such as relevant links, perhaps the status of the project, please use the form below.
Any additional information or corrections always gratefully accepted.
Site:
Comment:

Optional name/email and any other contact information, I like to say thanks:

Before submitting, please enter this code
.access code

All letters to be entered as lower case:
Sadly, this is necessary to reduce the volume of inappropriate emails that we receive.