Header Area

 

Loading

List of major Solar Energy Schemes in the UK.
Other Projects: Wind Farms | Hydro Schemes | Biomass | Waste | CHP | Wave & Tidal | Solar |    

Not Logged on, Max pages: 5( 1 Seen )
Active and Currently Generating
Building or Planning Approved
Proposed
  Refused or Cancelled (new listing)   NO
session(showworking) = librarian = U
Status
  Projects currently Generating
 1
  Salhouse Solar Farm 0 England NR13 6HD Norfolk 10/8/2013 2/5/2014 7/29/2015 10 / 2015 9/2/2016  
 1
  Foxburrow Solar Farm 0 England P12 4GA Suffolk 8/22/2013 11/27/2013 7/1/2014 10 / 2014 8/30/2016  
 1
  Rudge Hill Solar Farm 0 England DT10 2AB Dorset 3/20/2012 2/20/2013 9/3/2013 10 / 2013 7/28/2016  
 1
  Wrotham Solar Farm 0 England TN15 7SE Kent 7/23/2015 11/30/2015 4/1/2016 0 / 0 2/8/2017  
 1
  Egmere Airfield Solar Farm 0 England NR22 6AZ Hertfordshire 12/6/2012 3 / 2014 9/13/2016  
 1
  Egmere Airfield Solar Farm 0 England NR22 6AZ Hertfordshire 2/11/2013 3/21/2013 3 / 2014 9/13/2016  
 1
  Haywards Heath Dairy Farm Solar Farm 0.05 England West Sussex 0 / 0 6/18/2016  
 1
  Barnstaple Civic Centre Solar Farm 0.056 England Devon 3 / 2003 9/28/2016  
 1
  Wivelsfield Solar Farm 0.06 England East Sussex 6 / 2012 4/25/2017  
 1
  Albion Square Solar Farm 0.073 England GU21 6EJ Surrey 4 / 2007 9/28/2016  
 1
  Technium Optic Solar Farm 0.085 Wales Denbighshire 4 / 2007 9/28/2016  
 1
  Cowbeech Solar Farm 0.1 England East Sussex 6 / 2011 4/30/2014  
 1
  Worthy Solar Farm 0.2 England BA4 4BY Somerset 11 / 2010 11/11/2014  
 1
  Slepe Farm Solar Farm 0.2 England BH16 6HS Dorset 8 / 2011 11/16/2016  
 1
  Lindfield Solar Farm 0.2 England West Sussex 6 / 2012 11/19/2014  
 1
  Cheale Meats Solar Farm 0.242 England CM13 3EN Essex 10 / 2013 11/14/2014  
 1
  Chapel Ambel Solar Farm 0.25 England PL27 6EN Cornwall 4 / 2011 10/27/2016  
 1
  Henfield Solar Farm 0.25 England BN5 9SL West Sussex 0 / 0 8/31/2016  
 1
  Broadway House Solar Farm 0.26 England Hampshire 0 / 2005 11/5/2014  
 1
  Hirst Solar Farm 0.3 England Gloucestershire 12 / 2007 1/28/2015  
 1
  Stone Farm Solar Farm 0.36 England PO30 3BQ Isle of Wight 7 / 2011 11/23/2016  
 1
  Ice Solar Farm 0.455 England WF9 3AP Yorkshire 8 / 2016 4/25/2017  
 1
  PV Trading Solar Farm 0.46 England IP3 9RR Norfolk 5 / 2011 3/27/2017  
 1
  Staples, Solar Farm 0.46339 England NN17 1NN Northamptonshire 7 / 2011 3/27/2017  
 1
  Heathcoat Solar Farm 0.465 England EX16 5LL Devon 3 / 2016 3/27/2017  
 1
  Weedon Solar Farm 0.48 England NN7 4NJ Northamptonshire 9 / 2014 3/27/2017  
 1
  Edgeworthy Solar Farm 0.48326 England EX16 8NL Devon 3 / 2014 4/13/2017  
 1
  Barway Solar Farm 0.5 England CB7 5TZ Cambridgeshire 12 / 2013 2/11/2017  
 1
  LIttle Melton Solar Farm 0.5 England Norfolk 9 / 2012 10/17/2016  
 1
  Weidenhammer Solar Farm 0.515 England BD62NE Yorkshire 1 / 2011 3/27/2017  
 1
  PHE Porton Solar Farm 0.54 England SP4 0JG Wiltshire 3 / 2016 3/27/2017  
 1
  Imperium315 Solar Farm 0.5643 England SS14 3NY Essex 3 / 2011 3/27/2017  
 1
  St Nicholas Solar Farm 0.6 England CT7 0NJ Kent 7 / 2011 10/28/2014  
 1
  Briddlesford Solar Farm 0.61059 England PO33 4RY Isle of Wight 3 / 2014 4/13/2017  
 1
  Manor Farm Solar Farm 0.7 England TA11 7BT Somerset 7 / 2011 3/5/2015  
 1
  Howbery Solar Farm 0.7 England OX10 8BA Oxfordshire 6 / 2010 8/31/2016  
 1
  Gate Solar Farm 0.702 England SO15 0HH Hampshire 6 / 2014 4/25/2017  
 1
  Wychwood Solar Farm 0.75 England OX7 6BD Oxfordshire 10 / 2011 12/9/2014  
 1
  DPD Oldbury Solar Farm 0.7728 England B69 4DA West Midlands 11/27/2015 12/30/2015 12/10/2016 2 / 2016 4/12/2017  
 1
  M M Crocker Solar Farm 0.774 England BA8 0TN Somerset 9 / 2013 4/25/2017  
 1
  Rivington Solar Farm 0.7828 England BL6 7RN Lancashire 1 / 2016 2/10/2017  
 1
  Summerlands Solar Farm 0.8 England EX17 4DF Devon 7 / 2011 4/24/2015  
 1
  Cenin Solar Farm 0.8 Wales CF33 4RS Glamorgan 7 / 2011 2/9/2017  
 1
  Aldi Darlington Solar Farm 0.8 England DL3 0UW Yorkshire 7/11/2013 9/17/2013 3 / 2014 9/28/2016  
 1
  Fort Vale Solar Farm 0.807 England BB12 7ND Lancashire 12 / 2015 3/24/2017  
 1
  Five Mile Hill Solar Farm 0.813 England EX6 6AQ Devon 4 / 2013 3/24/2017  
 1
  Heineken Solar Farm 0.815 England LS24 9SA Yorkshire 12 / 2014 3/24/2017  
 1
  Maes mawr Solar Farm 0.84 Wales SY17 5SE Powys 3 / 2015 3/24/2017  
 1
  Altcar Solar Farm 0.897 England L38 7JE Merseyside 10 / 2015 3/13/2017  
 1
  Lodge Farm Solar Farm 0.9 England MK19 7ES Buckinghamshire 3 / 2016 4/25/2017  
Status
  Site Name
Capacity Region Postcode County Applied Approved   Go Live Updated

Back to map


Our aim is to continually improve this resource. If you can provide additional information such as relevant links, perhaps the status of the project, please use the form below.

Comments and Additional information
about:

Please regard the following as optional:
Your name and any other contact information:

Contact email address

Before submitting, please enter this code.access code
All letters to be entered as lower case:
Sadly, this is necessary to reduce the volume of inappropriate emails that we receive.

Recent News:

DEAL TO COMBINE WIND AND TIDAL POWER OUTPUT
Lochend has reached agreement with MeyGen to allow these wind turbines to deliver electricity to the grid whenever the MeyGen tidal project is not making full use of the available export capacity.
Source: atlantisresourcesltd, Date and Time of entry: Friday, June 23, 2017 00:00

Three new Wind Turbines approved near Ottringham
THREE 50m HIGH wind turbines are to be constructed just South of Ottringham (on land North West of Far Marsh Farm, Marsh Road).
Source: hu12online, Date and Time of entry: Friday, June 23, 2017 00:00

Decision casts doubt over turbine project
Local farmer James Gammie applied to build three of the 80m high structures on neighbouring plots of land at Gawnsmoss, Gledsgreen and Cairnhill.
Source: banffshire-journal, Date and Time of entry: Friday, June 23, 2017 00:00

500kW Turbine Commissioned at Lawrence Landfill
Wind Energy Direct developed, installed and commissioned a 500kW wind turbine at Lawrence Landfill,
Source: windenergydirect, Date and Time of entry: Friday, June 23, 2017 00:00

Brynwhilach Farm
The main construction phase of the first 5MW phase of the development took place between December 2016 and March 2017 when the site began exporting renewable electricity to the grid.
Source: goodenergy, Date and Time of entry: Thursday, June 22, 2017 00:00



Can you help?  

The aim is to continually improve this resource. If you can provide additional information such as relevant links, perhaps the status of the project, please use the form below.
Any additional information or corrections always gratefully accepted.
Site:
Comment:

Optional name/email and any other contact information, I like to say thanks:

Before submitting, please enter this code
.access code

All letters to be entered as lower case:
Sadly, this is necessary to reduce the volume of inappropriate emails that we receive.