Header Area NO

 

Loading

List of major Wave and Tidal Power Schemes in the UK.
Other Projects: Wind Farms | Hydro Schemes | Biomass | Waste | CHP | Wave & Tidal | Solar |    

Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0
1 - 10 - YES
Active and Currently Generating
Building or Planning Approved
Proposed
  Refused or Cancelled (new listing)   NO
session(showworking) = librarian =
Status
  Projects currently Generating
 1
  Ness of Quoys 0 Scotland KW1 4YH Caithness 6 / 2016 25/10/2016  
 1
  Warness 0 Scotland KW17 2AA Orkney 07/10/2016 0 / 0 27/10/2016  
 1
  Oyster 0.35 Scotland Orkney 8 / 2009 25/10/2016  
 1
  Billia Croo 0.8 Scotland KW16 3JP Strathclyde 1 / 2013 25/05/2017  
 1
  Brummer 1 Scotland KW17 2AA Orkney 7 / 2013 20/10/2016  
 1
  Ramsey Sound 1 Wales SA62 6PY Pembrokeshire 12 / 2015 25/10/2016  
 1
  Strangford Lough 1.2 N.Ireland Co. Down 01/11/2003 21/12/2005 01/03/2008 7 / 2008 20/10/2016  
 1
  Wave 20 England Cornwall 17/02/2005 15/07/2009 01/06/2010 9 / 2010 08/05/2017  
 1
  wave 23 England Cornwall 9 / 2010 08/05/2017  
  Projects planning approved and / or under construction
 2
  West Islay 0.1 Scotland Argyllshire 10/10/2013 21/06/2017 7 / 2008 20/10/2016  
 2
  Lynmouth 1.2 England Devon 01/10/2011 27/04/2012 0 / 0 27/10/2016  
 2
  Wootton Bridge 2 England PO33 4LJ Isle of Wight 19/01/2009 08/05/2009 0 / 0 25/10/2016  
 2
  Mull of Kintyre 3 Scotland Argyllshire 23/07/2014 0 / 0 20/10/2016  
 2
  Pentland Firth 6 Scotland Orkney 19/07/2012 16/09/2013 21/01/2015 0 / 0 25/10/2016  
 2
  Sound of Islay 10 Scotland Highland 25/07/2010 17/03/2011 0 / 0 20/10/2016  
 2
  St Catherines Race 30 England PO38 1UF Isle of Wight 12/12/2014 20/04/2016 0 / 0 23/08/2016  
 2
  Lewis 40 Scotland Western Isles 22/03/2012 22/05/2013 0 / 0 04/01/2015  
 2
  Swansea Bay 240 Wales Conwy 06/03/2014 09/06/2015 0 / 0 25/10/2016  
  Projects which are proposed and / or going through planning process
 3
  Vagr Atferth 1 Scotland KW16 3AW Orkney 0 / 0 20/10/2016  
 3
  Milford Haven 7 Wales Pembrokeshire 16/02/2007 0 / 0 19/03/2015  
 3
  Milford Haven 7 Wales Pembrokeshire 16/02/2007 0 / 0 27/01/2015  
 3
  Skerries 10 Wales Anglesey 0 / 0 14/08/2014  
 3
  Marwick Head 49.5 Scotland Orkney 0 / 0 20/10/2016  
 3
  Marwick Head 49.5 Scotland Orkney 0 / 0 06/08/2014  
 3
  West Orkney Mid South 50 Scotland Orkney 0 / 0 14/08/2014  
 3
  West Orkney 50 Scotland Orkney 0 / 0 25/10/2016  
 3
  Brough Head 50 Scotland Shetland 0 / 0 14/08/2014  
 3
  Armadale 50 Scotland Caithness 0 / 0 14/08/2014  
 3
  Fair Head 100 NIreland Co. Antrim 07/02/2017 0 / 0 10/08/2017  
 3
  Ness of Duncansby 100 Scotland Caithness 0 / 0 09/04/2015  
 3
  Brough Ness 100 Scotland Shetland 0 / 0 20/10/2016  
 3
  Cantick Head 200 Scotland Shetland 20/05/2016 0 / 0 20/10/2016  
 3
  Costa Head 200 Scotland Orkney 0 / 0 14/08/2014  
 7
  Siadar Bay 4 Scotland Highland 0 / 0 14/08/2014  
 7
  Severn Barrage 8640 England Avon 0 / 0 05/12/2014  
 9
  Swansea Bay 320 Wales Glamorgan 0 / 0 15/02/2017  
Status
  Site Name
Capacity Region Postcode County Applied Approved   Go Live Updated

Back to map


Our aim is to continually improve this resource. If you can provide additional information such as relevant links, perhaps the status of the project, please use the form below.

Comments and Additional information
about:

Please regard the following as optional:
Your name and any other contact information:

Contact email address

Before submitting, please enter this code.access code
All letters to be entered as lower case:
Sadly, this is necessary to reduce the volume of inappropriate emails that we receive.

Recent News:

Decoy Farm AD Plant
SES Contracting were awarded the construction of a new 2.8mw Anaerobic Digestion plant at Decoy Farm, Crowland near Peterborough.
Source: ses group, Date and Time of entry: 16 August 2017 00:00

FAIR HEAD TIDAL TO REVEAL LATEST PLANS TO BALLYCASTLE AND RATHLIN COMMUNITIES
The renewable energy firm behind proposals to install a tidal generation scheme off Fair Head is to host two open days to gather opinions and share information with local communities.
Source: dpenergy, Date and Time of entry: 10 August 2017 00:00

Fair Head Tidal goes ahead with planning submission
Fair Head Tidal has lodged a planning application for permission to build tidal turbines on the seabed and associated infrastructure to bring the power ashore.
Source: irishnews, Date and Time of entry: 10 August 2017 00:00

Gruggandoo Wind Farm April 2017
The proposed scheme would have an installed capacity of 39.6MW, comprising 12 turbines, each with a maximum blade tip height of 125m and a hub height of 75m. Access to the site will be taken from Mullgahgarriff Road for all turbines.
Source: abo, Date and Time of entry: 02 August 2017 00:00

PLANNING APPROVAL UNANIMOUSLY GIVEN FOR CROSSDYKES WIND FARM
At a meeting of the Planning Applications Committee on Tuesday 24th May, Councillors gave their unanimous backing to the 15 turbine wind farm, proposed by Muirhall Energy.
Source: muirhall, Date and Time of entry: 02 August 2017 00:00



Can you help?  

The aim is to continually improve this resource. If you can provide additional information such as relevant links, perhaps the status of the project, please use the form below.
Any additional information or corrections always gratefully accepted.
Site:
Comment:

Optional name/email and any other contact information, I like to say thanks:

Before submitting, please enter this code
.access code

All letters to be entered as lower case:
Sadly, this is necessary to reduce the volume of inappropriate emails that we receive.