Page views this IP this session = 1 of 10 unsubscribed pagesCamster Wind Farm
Click here for Generation Forecast for wind farms based on Met office data
Subscribers see an interactive map with Camster Wind Farm and local projects displayed.
( Subscribe for £100 )to have full access to all Wind projects and details.
Subscribe to Wind for exact generator location including nearby generators
For an example of a wind project see: Little Cheyne Court Wind Farm
Subscribe for £500 to include full csv and KML downloads of all Wind project data.
To create a login account see: User Registration. This will allow 30 page views each session rather than 5
One subscription covers your organisation / school / university / company . NOT per user
|
Camster Wind Farm (Wind , Active) Location in the UK : Scotland, Highland Type of installation: Wind on/offshore: on Turbines :25 Capacity : 49.9 MW Approx Date of 1st power generation: July 2013
Subscribe to Renewables Map to see: Wind Turbines make / model / hub height / elevation / latitude and longitude. Accurate data available for 99% of all Active wind farms listed, also cross reference to DECC and OFGEM datasets
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
July 2013: Camster wind farm is now fully operational.
June 2013: All turbines are now fully constructed.
A planning application and associated Environmental Statement was submitted to the Highland Council in December 2004.
The Camster wind farm would:
Provide electricity equivalent to about 35,000 homes *
Save more than 71,000 tonnes of carbon dioxide per year**
Contribute to Scottish Government Renewable Energy Targets (31% by 2011, 50% by 2020).
Provide a community benefit fund over the lifetime of the project.
Aid the local and regional economy through construction contracts and further operations and maintenance work for local contractors.
For Wind projects, Subscribed version includes Turbine data, average hub height, average elevation Subscriber Register Lower Camster Lybster Caithness KW1 5SX
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Camster 50 MW
|
Energy Type: |
Wind Onshore |
County: |
Highland Country: Scotland LPA: Scottish Government (S36)
|
Site ID and Reference: |
4006 / N00031W
District:
|
Applicant: |
E.ON UK
Application :
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
25 |
Turbine Capacity: |
2 |
Height of Turbines: |
|
Calculated capacity: |
50 |
Site Address: |
Lower Camster
Lybster
Caithness
|
|
|
County: |
Highland Region: Scotland
|
OS Coordinates: |
325800 / 325800
|
Development Status: |
Operational
|
Application Submitted: |
1/5/2005
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
1/1/2012
|
|
|
Generator Live |
2/9/2013
|
This Record Last Updated: |
7/4/2013
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Capacity: 50 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 25 m/s (55.925 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 4/29/2024 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
Eon energy: CAMSTER II
E.ON UK Renewables
(2012) Caithness Spittal Hill wind farm plans rejected The area already has Causeymire, Flex Hill and Achairn wind farms, while one at CAMSTER has planning consent and another farm has been proposed for Halsary.
CAMSTER Wind Farm Completed Windhoist have recently competed the erection of 25 Vestas MK7a wind turbines to 78m hub height at CAMSTER Wind Farm.
Wind farm 'would affect Wick airport' The other farms are at Forss, Causeymire, Boulfruich, Flexhill, Achairn, Baillie, CAMSTER, Bettyhill, Strathy North, Strathy South, South Shebster, Hill of Lieurary, Burn of Whilk, Stroupster, Bower, Durran, Olgrinmore, Halsary and Wathegar.
|
|
©2018
Simon Mallett |
Latest News Added |
Carn Nicholas Drone footage Date and Time of entry: Tuesday, March 19, 2024 00:00
Carn Nicholas Solar Park The site, developed and constructed by Innova Renewables, was energised earlier this year following the beginning of its construction in May 2022. Date and Time of entry: Tuesday, March 19, 2024 00:00
Dorset Green Dorset Green H2 – South West’s first solar to green hydrogen production plant ready to produce clean, zero emission, green renewable energy Date and Time of entry: Tuesday, March 19, 2024 00:00
Dragon LNG Meadow
Date and Time of entry: Tuesday, March 19, 2024 00:00
Pretoria rd looking towards Ellistown.Solar farm.
Date and Time of entry: Tuesday, March 19, 2024 00:00
|
|
©2017
Simon Mallett |
|