Little Cheyne Court Wind Farm

DECC / 3096 : Little Cheyne Court Wind Farm; 59.8; Operational
OFGem / RO : R00201RQEN; Little Cheyne Court Wind Farm; 59.8MW
Cansee = YES

Little Cheyne Court Wind Farm (Wind , Active)

 General Information.

Location in the UK : England, Romney (Walland) Marsh, Kent,    
Type of installation: Wind    on/offshore: on
Turbines :26  Capacity : 59.8 MW
Approx Date of 1st power generation: end 2008

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

(2013) Greencoat UK Wind own 41% of Little Cheyne Court Wind Farm

Walland Marsh - Little Cheyne Court: Its 26 turbines will generate enough electricity to power 32,000 homes, with substantial savings in carbon dioxide emissions.
EDF is providing the grid connection including the on-site substation, a substation at Appledore and 8km of 132kV cabling.

 Turbine Make and Specs

Model: Nordex N90 Start Speed: 4
Capacity: 2.3 Optimal Speed: 12
Rotor Diameter: 90 Stop Speed: 25
Hub Height 70   Avg for all turbines:70 Avg. Elevation: 1
Web Page: http://www.nordex-online.com/en/produkte-service/wind-turbines/n90-25-mw.html
Comment: N90 suits inland locations

 Address

Little Cheyne Court Wind Farm Sub Station Little Cheyne Court Wind Farm East Guldeford Rye TN31 7AE England

 Associated Companies.

Relationship Company (For: Little Cheyne Court )
OwnerGreencoat
DeveloperRWE Innogy
OperatorRWE Innogy
OwnerRWE Innogy

 DECC Data on this Project: Little Cheyne Court :3096

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Little Cheyne Court Wind Farm     59.8 MW
Energy Type: Wind Onshore
County: Kent     Country: England     LPA: DECC (S36)
Site ID and Reference: 2411 / N00019W     District:
Applicant: RWE npower     Application : YO2/1278/SH (Go to search to find Application)
For Wind Farms  
Number of Turbines: 26 Turbine Capacity: 2.30
Height of Turbines: Calculated capacity: 59.8
Site Address: Little Cheyne Court, Romney Marsh Near Lydd Kent
 
County: Kent Region: South East
OS Coordinates: 598310 / 598310
Development Status: Operational
Application Submitted: 11/28/2002 Planning Permission Granted
Application Determined: Permission refused: 10/18/2005
Construction Date: 1/7/2008    
Generator Live 1/6/2009 This Record Last Updated: 7/9/2009
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted: 10/18/2005

 OFGEM Data on this Project: Little Cheyne Court: Wind : R00201RQEN

Site Name: Little Cheyne Court Wind Farm
Generator Type: On-shore wind (RO code = RQ)
Scheme : RO Generator ID: R00201RQEN
Capacity: 59800 Status: Live
Accreditation Date: 11/28/2002    
Commission Date:    
Applicant: Innogy Renewables UK Limited (Wind)
Applicant Address: Windmill Hill Business ParkWhitehill WaySwindonSN5 6PBEngland
Address: Little Cheyne Court Wind Farm Sub StationLittle Cheyne Court Wind FarmEast GuldefordRyeTN31 7AEEngland

 Calculations


Capacity: 59.8
Start Speed: 4 m/s (8.948 mph)
Optimum Speed: 12 m/s (26.844 mph)
Stop Speed: 25 m/s (55.925 mph)

Local Weather Station: HERSTMONCEUX WEST END(3882)
Elevation of Weather Station:

Date for Wind forecast: 2/20/2017
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph

 Any Comment (New: Uses Disqus)

comments powered by Disqus

Project Info
Npower Renewables: LITTLE CHEYNE COURT

Wikipedia: Walland Marsh: LITTLE CHEYNE COURT

Pictures of Walland Marsh

Greencoat UK Wind: Seed Portfolio
The Company has acquired 50% of Braes of Doune, 100% of Tappaghan, 100% of Carcant and 100% of Bin Mountain from SSE and 41% of LITTLE CHEYNE COURT and 24.95% of Rhyl Flats from RWE and a 24.95% interest in Rhyl Flats.

(2008)Wind farm propellers take to road
Propeller blades for a wind farm being built on Romney Marsh (LITTLE CHEYNE COURT) are to be transported across Kent by road.

©2016 Simon Mallett

Latest News Added
SSE to start construction on delayed Glasa hydro-electric scheme in Scotland
SSE has announced it will start construction on the 7.5MW Glasa hydro-electric scheme near Ardross, Ross-Shire in Scotland, by the end the year.
Source: powertechnology, Date and Time of entry: Monday, February 20, 2017 00:00

Glasa Hydroelectric Scheme
ASH was appointed as project environmental advisors by SSE for the Glasa Hydroelectric Scheme
Source: ashdesign, Date and Time of entry: Monday, February 20, 2017 00:00

30m Glasa hydro energy plant given green light
(2013) Construction of the Glasa scheme on the Kildermorie Estate near Ardross in Ross-shire will start in late summer this year.
Source: scotsman, Date and Time of entry: Monday, February 20, 2017 00:00

Bentinck landfill debate
Proposals have been submitted by the waste management company, the Waste Recycling Group, for part of the old Bentinck colliery site
Source: bbc, Date and Time of entry: Wednesday, February 15, 2017 00:00

Residents keep fighting Bentinck landfill plans
The planning application for filling the void with around 4m cubic metres of waste over 10-12 years is expected to be decided this summer after being submitted in October 2006.
Source: chad, Date and Time of entry: Wednesday, February 15, 2017 00:00

©2016 Simon Mallett

Date for wind
(used for wind farms)

7/22/2016 12:00:00 PM
7/22/2016
7/21/2016 12:00:00 PM
7/21/2016
7/20/2016 12:00:00 PM
7/20/2016
7/19/2016 12:00:00 PM
7/19/2016
7/18/2016 12:00:00 PM
7/18/2016
7/15/2016 12:00:00 PM
7/15/2016
7/14/2016 12:00:00 PM
7/14/2016
7/13/2016 12:00:00 PM
7/13/2016
7/12/2016 12:00:00 PM
7/12/2016
7/11/2016 12:00:00 PM
7/11/2016
7/9/2016 12:00:00 PM
7/9/2016
7/8/2016 12:00:00 PM
7/8/2016
7/7/2016 12:00:00 PM
7/7/2016
7/6/2016 12:00:00 PM
7/6/2016
7/5/2016 12:00:00 PM
7/5/2016
7/3/2016 12:00:00 PM
7/3/2016
7/2/2016 12:00:00 PM
7/2/2016
7/1/2016 12:00:00 PM
7/1/2016
6/30/2016 12:00:00 PM
6/30/2016
6/29/2016 12:00:00 PM
6/29/2016