Loading
Page views this IP this session = 1 of 10 unsubscribed pagesNash Wind Farm
Click here for Generation Forecast for wind farms based on Met office data
Subscribers see an interactive map with Nash Wind Farm and local projects displayed.
( Subscribe for £100 )to have full access to all Wind projects and details.
Subscribe to Wind for exact generator location including nearby generators
For an example of a wind project see: Little Cheyne Court Wind Farm
Subscribe for £500 to include full csv and KML downloads of all Wind project data.
To create a login account see: User Registration. This will allow 30 page views each session rather than 5
One subscription covers your organisation / school / university / company . NOT per user
|
Nash Wind Farm (Wind , Active) Location in the UK : Wales, NP18 2YH Type of installation: Wind on/offshore: on Turbines :1 Capacity : 2.5 MW Approx Date of 1st power generation: March 2017
Subscribe to Renewables Map to see: Wind Turbines make / model / hub height / elevation / latitude and longitude. Accurate data available for 99% of all Active wind farms listed, also cross reference to DECC and OFGEM datasets
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
For Wind projects, Subscribed version includes Turbine data, average hub height, average elevation Subscriber Register West Nash Road, Nash NP18 2YH
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Nash Waste Water Treatment Works Turbine 2.5 MW
|
Energy Type: |
Wind Onshore |
County: |
Gwent Country: Wales LPA: Newport City Council
|
Site ID and Reference: |
3887 / B0436
District:
|
Applicant: |
Welsh Water
Application :
11/1287
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
1 |
Turbine Capacity: |
2.5 |
Height of Turbines: |
|
Calculated capacity: |
2.5 |
Site Address: |
West Nash Road, Nash NP18 2YH
|
|
|
County: |
Gwent Region: Wales
|
OS Coordinates: |
333598 / 333598
|
Development Status: |
Operational
|
Application Submitted: |
12/8/2011
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
2/7/2017
|
|
|
Generator Live |
3/15/2017
|
This Record Last Updated: |
7/18/2017
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Nash WwTW Wind Turbine
|
Generator Type: |
Wind
|
Scheme : |
REGO
|
Generator ID: |
G01666NWWA
|
Capacity: |
2450
|
Status: |
Live
|
Accreditation Date: |
12/8/2011
|
|
|
Commission Date: |
3/24/2017
|
|
|
Applicant: |
Dwr Cymru Welsh Water
|
Applicant Address: |
Dwr Cymru Welsh Water
Ty Awen, Spooner Close
Coedkernew
Newport
NP10 8FZ
Wales
|
Address: |
Nash WwTW
West Nash Road
Newport
NP18 2YH
Wales
|
|
Assumptions: Capacity: 2450kW 2.45 MW, Thus over the month Capacity * 720 hours per month = 1764 MWh
|
Output Period |
LECs Issued |
ROCs Issued |
REGO Certs |
Capacity Factor |
Status |
01/03/2018 | | | 471 | 19.22% | Issued | 01/02/2018 | | | 453 | 18.49% | Issued | 01/01/2018 | | | 751 | 30.65% | Issued | 01/12/2017 | | | 524 | 21.39% | Issued | 01/11/2017 | | | 346 | 14.12% | Issued | 01/10/2017 | | | 580 | 23.67% | Issued | 01/09/2017 | | | 350 | 14.29% | Issued | 01/08/2017 | | | 91 | 3.71% | Issued | 01/07/2017 | | | 378 | 15.43% | Issued | 01/06/2017 | | | 201 | 8.20% | Issued |
|
Capacity: 5 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 25 m/s (55.925 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 5/3/2024 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
Welsh Water installs wind turbine at NASH WwTW Once completed the turbine will produce five million kWh each year, which is the equivalent to the annual usage of around 1,500 households.
How WhiNASH saw off the turbines In 2005, plans to put England's largest wind farm in the rolling fells of Cumbria were met with outrage by local residents. The £55m development would have seen 27 turbines, each 377ft tall erected at WhiNASH near Kendal.
The edge of the Cairngorms National Park is no place for a windfarm At Allt Duine, in the Monadhliath mountains to the west of the Spey, RWE npower, one of the Big Six energy companies, proposes to erect 31 wind turbines, each 410ft high. The scheme strongly resembles an English windfarm proposal, at WhiNASH Fell
Giant wind farm plan thrown out Plans to create England's largest wind farm in Cumbria have been rejected by the government.
The £55m development would have seen 27 turbines, each 377ft(115metres) tall, erected at WhiNASH, near Kendal.
The WhiNASH Windfarm inquiry ... (2006)Following a six-week public inquiry last year, plans to create England's largest wind farm at WhiNASH near Kendal have been rejected by the government
|
|
©2018
Simon Mallett |
Latest News Added |
Carn Nicholas Drone footage Date and Time of entry: Tuesday, March 19, 2024 00:00
Carn Nicholas Solar Park The site, developed and constructed by Innova Renewables, was energised earlier this year following the beginning of its construction in May 2022. Date and Time of entry: Tuesday, March 19, 2024 00:00
Dorset Green Dorset Green H2 – South West’s first solar to green hydrogen production plant ready to produce clean, zero emission, green renewable energy Date and Time of entry: Tuesday, March 19, 2024 00:00
Dragon LNG Meadow
Date and Time of entry: Tuesday, March 19, 2024 00:00
Pretoria rd looking towards Ellistown.Solar farm.
Date and Time of entry: Tuesday, March 19, 2024 00:00
|
|
©2017
Simon Mallett |
|