Loading
Page views this IP this session = 1 of 10 unsubscribed pagesAirfield Farm Wind Farm
Click here for Generation Forecast for wind farms based on Met office data
Subscribers see an interactive map with Airfield Farm Wind Farm and local projects displayed.
( Subscribe for £100 )to have full access to all Wind projects and details.
Subscribe to Wind for exact generator location including nearby generators
For an example of a wind project see: Little Cheyne Court Wind Farm
Subscribe for £500 to include full csv and KML downloads of all Wind project data.
To create a login account see: User Registration. This will allow 30 page views each session rather than 5
One subscription covers your organisation / school / university / company . NOT per user
|
Airfield Farm Wind Farm (Wind , Active) Location in the UK : England, NN29 7JQ Type of installation: Wind on/offshore: on Turbines :3 Capacity : 6.1 MW Approx Date of 1st power generation: February 2017
Subscribe to Renewables Map to see: Wind Turbines make / model / hub height / elevation / latitude and longitude. Accurate data available for 99% of all Active wind farms listed, also cross reference to DECC and OFGEM datasets
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
15/02341/AOC | 08/02692/MAF - Condition - 13 - Ecological mitigation and management plan (3 no. wind turbines and associated infrastructure). | Land At Airfield Farm Podington Airfield Hinwick Wellingborough Northants Airfield Road Podington 16/02283/AOC | 08/02692/MAF (allowed on appeal APP/K0235/A/09/21085060) Condition 22 (a) and (f) PARTIAL DISCHARGE OF CONDITION - Noise Monitoring (The erection of three wind turbines on land at Airfield Farm, Podington, Bedfordshire) | Land At Airfield Farm Podington Airfield Hinwick Wellingborough Northants Airfield Road Podington For Wind projects, Subscribed version includes Turbine data, average hub height, average elevation Subscriber Register Airfield Farm Wind Farm Hinwick NN29 7JQ England
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Airfield Farm (Podington) 8.6 MW
|
Energy Type: |
Wind Onshore |
County: |
Bedfordshire Country: England LPA: Bedford Borough Council
|
Site ID and Reference: |
4116 / EN00608
District:
|
Applicant: |
Airvolution Energy
Application :
08/02692/MAF
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
3 |
Turbine Capacity: |
2 |
Height of Turbines: |
|
Calculated capacity: |
6 |
Site Address: |
Airfield Farm, adjacent to Santa Pod raceway, Podington, Wellingborough
|
|
NN29 7XA
|
County: |
Bedfordshire Region: Eastern
|
OS Coordinates: |
495095 / 495095
|
Development Status: |
Operational
|
Application Submitted: |
9/25/2008
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
2/23/2010
|
Construction Date: |
7/15/2016
|
|
|
Generator Live |
2/15/2017
|
This Record Last Updated: |
4/19/2017
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
2/23/2010 |
Site Name: |
Airfield Farm (Podington) 20.7 MW
|
Energy Type: |
Wind Onshore |
County: |
Bedfordshire Country: England LPA: Bedford Borough Council
|
Site ID and Reference: |
2945 / EN00168
District:
|
Applicant: |
Nuon Renewables
Application :
05/02589/FUL
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
9 |
Turbine Capacity: |
2 |
Height of Turbines: |
|
Calculated capacity: |
18 |
Site Address: |
Airfield Farm, adjacent to Santa Pod raceway, Podington,
|
|
NN29 7XA
|
County: |
Bedfordshire Region: Eastern
|
OS Coordinates: |
495500 / 495500
|
Development Status: |
Revised
|
Application Submitted: |
10/20/2005
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
7/6/2007
|
Construction Date: |
|
|
|
Generator Live |
|
This Record Last Updated: |
12/2/2011
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
7/6/2007 |
Site Name: |
Airvolution Energy (Airfield) Limited
|
Generator Type: |
On-shore wind (RO code = RQ)
|
Scheme : |
RO
|
Generator ID: |
R00398RQEN
|
Capacity: |
8481.45
|
Status: |
Live
|
Accreditation Date: |
10/20/2005
|
|
|
Commission Date: |
2/22/2017
|
|
|
Applicant: |
Airfield Wind Farm Limited
|
Applicant Address: |
Airfield Wind Farm Limited
1030 Centre Park
Slutchers Lane
Warrington
WA1 1QL
England
|
Address: |
Airvolution Energy (Airfield) Limited
Land at Airfield Farm
Hinwick
NN29 7JQ
England
|
Site Name: |
Airvolution Energy (Airfield) Limited
|
Generator Type: |
Wind
|
Scheme : |
REGO
|
Generator ID: |
G03026NWEN
|
Capacity: |
8481.45
|
Status: |
Live
|
Accreditation Date: |
10/20/2005
|
|
|
Commission Date: |
2/22/2017
|
|
|
Applicant: |
Airfield Wind Farm Limited
|
Applicant Address: |
Airfield Wind Farm Limited
1030 Centre Park
Slutchers Lane
Warrington
WA1 1QL
England
|
Address: |
Airvolution Energy (Airfield) Limited
Land at Airfield Farm
Hinwick
NN29 7JQ
England
|
|
Assumptions: Capacity: 8481.45kW 8.48145 MW, Thus over the month Capacity * 720 hours per month = 6106.644 MWh
|
Output Period |
LECs Issued |
ROCs Issued |
REGO Certs |
Capacity Factor |
Status |
01/03/2018 | | | 2039 | 24.04% | Issued | 01/02/2018 | | | 1952 | 23.01% | Issued | 01/01/2018 | | | 2843 | 33.52% | Issued | 01/12/2017 | | | 2638 | 31.10% | Issued | 01/11/2017 | | | 2054 | 24.22% | Issued | 01/10/2017 | | | 2521 | 29.72% | Issued | 01/09/2017 | | | 1290 | 15.21% | Issued | 01/08/2017 | | | 1025 | 12.09% | Issued | 01/07/2017 | | | 1051 | 12.39% | Issued | 01/06/2017 | | | 1420 | 16.74% | Issued | 01/05/2017 | | | 884 | 10.42% | Issued | 01/04/2017 | | | 1106 | 13.04% | Issued | 01/03/2017 | | | 2075 | 24.47% | Issued | 01/02/2017 | | | 366 | 4.32% | Issued |
|
Capacity: 12 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 16 m/s (35.792 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 5/3/2024 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Carn Nicholas Drone footage Date and Time of entry: Tuesday, March 19, 2024 00:00
Carn Nicholas Solar Park The site, developed and constructed by Innova Renewables, was energised earlier this year following the beginning of its construction in May 2022. Date and Time of entry: Tuesday, March 19, 2024 00:00
Dorset Green Dorset Green H2 – South West’s first solar to green hydrogen production plant ready to produce clean, zero emission, green renewable energy Date and Time of entry: Tuesday, March 19, 2024 00:00
Dragon LNG Meadow
Date and Time of entry: Tuesday, March 19, 2024 00:00
Pretoria rd looking towards Ellistown.Solar farm.
Date and Time of entry: Tuesday, March 19, 2024 00:00
|
|
©2017
Simon Mallett |
|