Page views this IP this session = 1 of 10 unsubscribed pagesWathegar Wind Farm
Click here for Generation Forecast for wind farms based on Met office data
Subscribers see an interactive map with Wathegar Wind Farm and local projects displayed.
( Subscribe for £100 )to have full access to all Wind projects and details.
Subscribe to Wind for exact generator location including nearby generators
For an example of a wind project see: Little Cheyne Court Wind Farm
Subscribe for £500 to include full csv and KML downloads of all Wind project data.
To create a login account see: User Registration. This will allow 30 page views each session rather than 5
One subscription covers your organisation / school / university / company . NOT per user
|
Wathegar Wind Farm (Wind , Active) Location in the UK : Scotland, KW1 5TA Type of installation: Wind on/offshore: on Turbines :5 Capacity : 10 MW Approx Date of 1st power generation: March 2013
Subscribe to Renewables Map to see: Wind Turbines make / model / hub height / elevation / latitude and longitude. Accurate data available for 99% of all Active wind farms listed, also cross reference to DECC and OFGEM datasets
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
Mr Danny Miller Operational For Wind projects, Subscribed version includes Turbine data, average hub height, average elevation Subscriber Register Land at Wathegar Farm Bilbster Wick KW1 5TA Scotland
Relationship |
Company (For:
Wathegar
) |
Sorry I found no matches, Please try again.
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Wathegar 2 Wind Farm 18.5 MW
|
Energy Type: |
Wind Onshore |
County: |
Highland Country: Scotland LPA: Highland Council
|
Site ID and Reference: |
4425 / AA538
District:
|
Applicant: |
BayWa r.e.
Application :
11/03671/FUL
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
9 |
Turbine Capacity: |
2.0499999999999998 |
Height of Turbines: |
|
Calculated capacity: |
18.45 |
Site Address: |
Wathegar, Bilbster, Wick
|
|
KW1 5SG
|
County: |
Highland Region: Scotland
|
OS Coordinates: |
329103 / 329103
|
Development Status: |
Operational
|
Application Submitted: |
10/10/2011
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
12/13/2016
|
|
|
Generator Live |
9/15/2017
|
This Record Last Updated: |
1/2/2020
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Wathegar wind farm 10 MW
|
Energy Type: |
Wind Onshore |
County: |
Highland Country: Scotland LPA: Highland Council
|
Site ID and Reference: |
3757 / AA046
District:
|
Applicant: |
Private Developer
Application :
10/00042/FULCA
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
5 |
Turbine Capacity: |
2 |
Height of Turbines: |
|
Calculated capacity: |
10 |
Site Address: |
Land At Wathegar Bilbster, Wick, Caithness
|
|
|
County: |
Highland Region: Scotland
|
OS Coordinates: |
328540 / 328540
|
Development Status: |
Operational
|
Application Submitted: |
2/9/2010
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
6/1/2012
|
|
|
Generator Live |
3/31/2013
|
This Record Last Updated: |
6/4/2013
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Wathegar Wind Farm
|
Generator Type: |
On-shore wind (ROS code = SQ)
|
Scheme : |
RO
|
Generator ID: |
R00154SQSC
|
Capacity: |
9900
|
Status: |
Live
|
Accreditation Date: |
2/9/2010
|
|
|
Commission Date: |
3/27/2013
|
|
|
Applicant: |
Wathegar Wind Farm LLP
|
Applicant Address: |
FIM Services Limited
The Glebe Barn
Great Barrington
Burford
OX18 4US
England
|
Address: |
Land at Wathegar Farm
Bilbster
Wick
KW1 5TA
Scotland
|
Site Name: |
Wathegar Wind Farm
|
Generator Type: |
Wind
|
Scheme : |
REGO
|
Generator ID: |
G01934NWSC
|
Capacity: |
9900
|
Status: |
Live
|
Accreditation Date: |
2/9/2010
|
|
|
Commission Date: |
3/27/2013
|
|
|
Applicant: |
Wathegar Wind Farm LLP
|
Applicant Address: |
FIM Services Limited
The Glebe Barn
Great Barrington
Burford
OX18 4US
England
|
Address: |
Land at Wathegar Farm
Bilbster
Wick
KW1 5TA
Scotland
|
|
Assumptions: Capacity: 9900kW 9.9 MW, Thus over the month Capacity * 720 hours per month = 7128 MWh
|
Output Period |
LECs Issued |
ROCs Issued |
REGO Certs |
Capacity Factor |
Status |
01/04/2018 | | | 1972 | 19.92% | Issued | 01/03/2018 | | | 3188 | 32.20% | Issued | 01/02/2018 | | | 2902 | 29.31% | Issued | 01/01/2018 | | | 3543 | 35.79% | Issued | 01/12/2017 | | | 416 | 4.20% | Issued | 01/12/2017 | | | 3013 | 30.43% | Issued | 01/11/2017 | | | 4099 | 41.40% | Issued | 01/10/2017 | | | 3514 | 35.49% | Issued | 01/09/2017 | | | 2426 | 24.51% | Issued | 01/08/2017 | | | 2143 | 21.65% | Issued | 01/07/2017 | | | 1659 | 16.76% | Issued | 01/06/2017 | | | 2106 | 21.27% | Issued | 01/05/2017 | | | 1797 | 18.15% | Issued | 01/04/2017 | | | 3325 | 33.59% | Issued | 01/03/2017 | | | 2814 | 28.42% | Redeemed | 01/02/2017 | | | 3182 | 32.14% | Redeemed | 01/01/2017 | | | 3437 | 34.72% | Redeemed | Dec-16 | 0 | 3733 | 3733 | 37.71% | Issued | Nov-16 | 0 | 2784 | 2784 | 28.12% | Issued | Oct-16 | 0 | 2296 | 2296 | 23.19% | Issued | Sep-16 | 0 | 2347 | 2347 | 23.71% | Issued | Aug-16 | 0 | 2009 | 2009 | 20.29% | Issued | Jul-16 | 0 | 1697 | 1697 | 17.14% | Issued | Jul-16 | 0 | 1697 | 1697 | 17.14% | Issued | Jun-16 | 0 | 1440 | 1440 | 14.55% | Issued | May-16 | 0 | 1805 | 1805 | 18.23% | Issued | Apr-16 | 0 | 2469 | 2469 | 24.94% | Issued | Mar-16 | 0 | 2086 | 2086 | 21.07% | Redeemed | Feb-16 | 0 | 2979 | 2979 | 30.09% | Redeemed | Jan-16 | 0 | 4005 | 4005 | 40.45% | Redeemed | Dec-15 | 0 | 4308 | 4308 | 43.52% | Redeemed | Oct-15 | 0 | 2138 | 2138 | 21.60% | Redeemed | Sep-15 | 0 | 2226 | 2226 | 22.48% | Redeemed | Aug-15 | 0 | 1931 | 1931 | 19.51% | Redeemed | Jul-15 | 1892 | 1891 | 1891 | 19.10% | Redeemed | Jun-15 | 1858 | 1859 | 1859 | 18.78% | Redeemed | May-15 | 3130 | 3130 | 3130 | 31.62% | Redeemed | Apr-15 | 2166 | 2166 | 2166 | 21.88% | Redeemed | Mar-15 | 3431 | 3431 | 3431 | 34.66% | Redeemed | Feb-15 | 3656 | 3657 | 3657 | 36.94% | Redeemed | Jan-15 | 4265 | 4266 | 4266 | 43.09% | Redeemed | Dec-14 | 4244 | 4244 | 4244 | 42.87% | Redeemed | Nov-14 | 2765 | 2767 | 2767 | 27.95% | Redeemed | Oct-14 | 3133 | 3136 | 3136 | 31.68% | Redeemed | Sep-14 | 1475 | 1481 | 1475 | 14.90% | Redeemed | Aug-14 | 2370 | 2372 | 2 | 0.02% | Redeemed | Jul-14 | 1374 | 1380 | 1374 | 13.88% | Redeemed | Jun-14 | 1259 | 1265 | 6 | 0.06% | Redeemed | May-14 | 1222 | 1226 | 1222 | 12.34% | Redeemed | Apr-14 | 2456 | 2460 | 4 | 0.04% | Redeemed | Mar-14 | 3670 | 3671 | 3671 | 37.08% | Redeemed | Feb-14 | 3713 | 3714 | 3714 | 37.52% | Redeemed | Jan-14 | 4242 | 4243 | 4243 | 42.86% | Redeemed | Dec-13 | 4433 | 4434 | 4434 | 44.79% | Redeemed | Nov-13 | 3301 | 3302 | 3302 | 33.35% | Redeemed | Oct-13 | 2864 | 2864 | 14 | 0.14% | Redeemed | Sep-13 | 340 | 340 | 340 | 3.43% | Redeemed | Aug-13 | 277 | 277 | 13 | 0.13% | Redeemed | Jul-13 | 1272 | 1275 | 3 | 0.03% | Redeemed | Jun-13 | 1195 | 1200 | 5 | 0.05% | Redeemed | May-13 | 1185 | 1185 | 8 | 0.08% | Redeemed | Apr-13 | 379 | 379 | 379 | 3.83% | Redeemed | Mar-13 | 1 | 2 | 2 | 0.02% | Retired |
|
Capacity: 10 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 12 m/s (26.844 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 4/29/2024 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
WATHEGAR and Flex Hill turbine layout
REpower has signed five new contracts for the UK with a total capacity of 66MW The company will supply five MM82 turbines, for WATHEGAR wind farm in Caithness, as well as six MM92 turbines for the Blantyre Muir wind farm in South Lanarkshire and four MM92 turbines for Barlockhart Moor wind farm
Wind farm 'would affect Wick airport' The other farms are at Forss, Causeymire, Boulfruich, Flexhill, Achairn, Baillie, Camster, Bettyhill, Strathy North, Strathy South, South Shebster, Hill of Lieurary, Burn of Whilk, Stroupster, Bower, Durran, Olgrinmore, Halsary and WATHEGAR.
|
|
©2018
Simon Mallett |
Latest News Added |
Carn Nicholas Drone footage Date and Time of entry: Tuesday, March 19, 2024 00:00
Carn Nicholas Solar Park The site, developed and constructed by Innova Renewables, was energised earlier this year following the beginning of its construction in May 2022. Date and Time of entry: Tuesday, March 19, 2024 00:00
Dorset Green Dorset Green H2 – South West’s first solar to green hydrogen production plant ready to produce clean, zero emission, green renewable energy Date and Time of entry: Tuesday, March 19, 2024 00:00
Dragon LNG Meadow
Date and Time of entry: Tuesday, March 19, 2024 00:00
Pretoria rd looking towards Ellistown.Solar farm.
Date and Time of entry: Tuesday, March 19, 2024 00:00
|
|
©2017
Simon Mallett |
|