Page views this IP this session = 1 of 10 unsubscribed pagesStronelairg Wind Farm
Click here for Generation Forecast for wind farms based on Met office data
Subscribers see an interactive map with Stronelairg Wind Farm and local projects displayed.
( Subscribe for £100 )to have full access to all Wind projects and details.
Subscribe to Wind for exact generator location including nearby generators
For an example of a wind project see: Little Cheyne Court Wind Farm
Subscribe for £500 to include full csv and KML downloads of all Wind project data.
To create a login account see: User Registration. This will allow 30 page views each session rather than 5
One subscription covers your organisation / school / university / company . NOT per user
|
Stronelairg Wind Farm (Wind , Active) Location in the UK : Scotland, Fort Augustus Type of installation: Wind on/offshore: on Turbines :66 Capacity : 228 MW Approx Date of 1st power generation: December 2018
Subscribe to Renewables Map to see: Wind Turbines make / model / hub height / elevation / latitude and longitude. Accurate data available for 99% of all Active wind farms listed, also cross reference to DECC and OFGEM datasets
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
The Turbine layout shown shows an earlier layout prior to reduction to 67.
A 67-turbine wind farm proposed for the Garrogie Estate near Fort Augustus has been given the go-ahead by Energy Minister Fergus Ewing.
The government said SSE Renewables' Stronelairg project would generate power for 114,000 homes and bring £30m-worth of benefits to the region.
Landscape charity the John Muir Trust opposes the scheme.
For Wind projects, Subscribed version includes Turbine data, average hub height, average elevation Subscriber Register
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Stronelairg Wind Farm 227.7 MW
|
Energy Type: |
Wind Onshore |
County: |
Highland Country: Scotland LPA: Scottish Government (S36)
|
Site ID and Reference: |
4597 / AA513
District:
|
Applicant: |
Scottish and Southern Energy (SSE)
Application :
EC00005242
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
66 |
Turbine Capacity: |
3.4500000000000002 |
Height of Turbines: |
135 |
Calculated capacity: |
227.7 |
Site Address: |
located approximately 11 kilometres to the south-east of Fort Augustus
|
|
|
County: |
Highland Region: Scotland
|
OS Coordinates: |
247166 / 247166
|
Development Status: |
Operational
|
Application Submitted: |
6/29/2012
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
4/20/2017
|
|
|
Generator Live |
12/11/2018
|
This Record Last Updated: |
1/2/2019
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Capacity: 455.399999999999 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 25 m/s (55.925 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 4/26/2024 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Carn Nicholas Drone footage Date and Time of entry: Tuesday, March 19, 2024 00:00
Carn Nicholas Solar Park The site, developed and constructed by Innova Renewables, was energised earlier this year following the beginning of its construction in May 2022. Date and Time of entry: Tuesday, March 19, 2024 00:00
Dorset Green Dorset Green H2 – South West’s first solar to green hydrogen production plant ready to produce clean, zero emission, green renewable energy Date and Time of entry: Tuesday, March 19, 2024 00:00
Dragon LNG Meadow
Date and Time of entry: Tuesday, March 19, 2024 00:00
Pretoria rd looking towards Ellistown.Solar farm.
Date and Time of entry: Tuesday, March 19, 2024 00:00
|
|
©2017
Simon Mallett |
|