Sorry I found no matches, Please try again. 176
vid = 3035pws_id = 351185pws_id = 351185
--------------------------------------------------------
(825) Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 3.136.154.103 {832) YESU WSHW: 1/10
Loading
Page views this IP this session = 1 of 10 unsubscribed pages

Frodsham Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Subscribers see an interactive map with Frodsham Wind Farm and local projects displayed.

( Subscribe for £100 )to have full access to all Wind projects and details.


Subscribe to Wind for exact generator location including nearby generators
For an example of a wind project see: Little Cheyne Court Wind Farm


Subscribe for £500 to include full csv and KML downloads of all Wind project data.

To create a login account see: User Registration. This will allow 30 page views each session rather than 5

One subscription covers your organisation / school / university / company . NOT per user

Frodsham Wind Farm (Wind , Active)

 General Information.

Location in the UK : England, WA6 0HU    
Type of installation: Wind    on/offshore: on
Turbines :19  Capacity : 57 MW
Approx Date of 1st power generation: November 2016

Subscribe to Renewables Map to see: Wind Turbines make / model / hub height / elevation / latitude and longitude. Accurate data available for 99% of all Active wind farms listed, also cross reference to DECC and OFGEM datasets

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

The proposed Frodsham wind farm could generate enough electricity to meet the needs of 28,500 households - equivalent to more than one-fifth of the homes in Cheshire West and Chester.

Extensive studies have been undertaken on a stretch of land that runs between the Manchester Ship Canal and the M56, and indicate that that it is a good location for a wind farm of 20 turbines.

Each of the 125m turbines would generate 3MW of electricity, and, together provide a total of 57MW installed capacity.

In 2012 the Department of Energy and Climate Change (DECC) consented a 19 turbine wind farm with a capacity of 50-57MW.

 Turbine Make and Specs

For Wind projects, Subscribed version includes Turbine data, average hub height, average elevation
Subscriber Register

 Address

Frodsham Canal Deposit Grounds Off Lordship Lane Frodsham WA6 0HU England

 Associated Companies.

Sorry I found no matches, Please try again.
Relationship Company (For: Frodsham )

 DECC Data on this Project: Frodsham :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Frodsham Marsh     50.4 MW
Energy Type: Wind Onshore
County: Cheshire     Country: England     LPA: DECC (S36)
Site ID and Reference: 3694 / A0207     District:
Applicant: Foresight/Belltown     Application : (Go to search to find Application)
For Wind Farms  
Number of Turbines: 19 Turbine Capacity: 2.6499999999999999
Height of Turbines: Calculated capacity: 50.35
Site Address: Land between Manchester Ship Canal and M56
 
County: Cheshire Region: North West
OS Coordinates: 348857 / 348857
Development Status: Operational
Application Submitted: 2/25/2010 Planning Permission Granted
Application Determined: Permission refused:
Construction Date: 8/6/2015    
Generator Live 11/15/2016 This Record Last Updated: 5/1/2018
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Frodsham: Wind :

Site Name: Frodsham Wind Farm
Generator Type: On-shore wind (RO code = RQ)
Scheme : RO Generator ID: R00357RQEN
Capacity: 50350 Status: Live
Accreditation Date: 2/25/2010    
Commission Date: 11/15/2016    
Applicant: Frodsham Wind Farm Ltd
Applicant Address: Peel Dome The Trafford Centre Manachester M17 8PL England
Address: Frodsham Wind Farm Frodsham Canal Deposit Grounds Off Lordship Lane Frodsham WA6 0HU England

Site Name: Frodsham Wind Farm
Generator Type: Wind
Scheme : REGO Generator ID: G03011NWEN
Capacity: 50350 Status: Live
Accreditation Date: 2/25/2010    
Commission Date: 11/15/2016    
Applicant: Frodsham Wind Farm Ltd
Applicant Address: Peel Dome The Trafford Centre Manachester M17 8PL England
Address: Frodsham Wind Farm Frodsham Canal Deposit Grounds Off Lordship Lane Frodsham WA6 0HU England
 
Assumptions: Capacity: 50350kW 50.35 MW,
Thus over the month Capacity * 720 hours per month = 36252 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status
01/05/2018 3300 6.55% Issued
01/04/2018 6198 12.31% Issued
01/03/2018 10565 20.98% Issued
01/02/2018 9333 18.54% Issued
01/01/2018 14158 28.12% Issued
01/12/2017 9892 19.65% Retired
01/11/2017 9311 18.49% Retired
01/10/2017 12261 24.35% Retired
01/09/2017 6715 13.34% Retired
01/08/2017 5158 10.24% Issued
01/07/2017 5369 10.66% Issued
01/06/2017 6106 12.13% Retired
01/05/2017 4956 9.84% Issued
01/04/2017 8503 16.89% Issued
01/03/2017 8392 16.67% Issued
01/02/2017 9611 19.09% Issued
01/01/2017 9269 18.41% Issued
Dec-16 05854 6505 12.92% Issued
Nov-16 01681 1881 3.74% Issued

 Calculations


Capacity: 106
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 25 m/s (55.925 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 4/26/2024
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 106 start: 5 Optimum: 15/ Stop: 25 / wind: / ratio 351185

Project Info
Peel Energy: FRODSHAM Wind Farm

Peel Energy: FRODSHAM Wind Farm Site Location

Wind farm power claims questioned
Peel Energy wants to build the wind farm on Marsh Lane in FRODSHAM between the M56 and the Mersey Estuary.

©2018 Simon Mallett
Latest News Added
Carn Nicholas
Drone footage
Date and Time of entry: Tuesday, March 19, 2024 00:00

Carn Nicholas Solar Park
The site, developed and constructed by Innova Renewables, was energised earlier this year following the beginning of its construction in May 2022.
Date and Time of entry: Tuesday, March 19, 2024 00:00

Dorset Green
Dorset Green H2 – South West’s first solar to green hydrogen production plant ready to produce clean, zero emission, green renewable energy
Date and Time of entry: Tuesday, March 19, 2024 00:00

Dragon LNG Meadow

Date and Time of entry: Tuesday, March 19, 2024 00:00

Pretoria rd looking towards Ellistown.Solar farm.

Date and Time of entry: Tuesday, March 19, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School