Sorry I found no matches, Please try again. 176
vid = 2943pws_id = 353736pws_id = 353736
--------------------------------------------------------
(825) Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 3.137.181.52 {832) YESU WSHW: 1/10
Loading
Page views this IP this session = 1 of 10 unsubscribed pages

Blantyre Muir Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Subscribers see an interactive map with Blantyre Muir Wind Farm and local projects displayed.

( Subscribe for £100 )to have full access to all Wind projects and details.


Subscribe to Wind for exact generator location including nearby generators
For an example of a wind project see: Little Cheyne Court Wind Farm


Subscribe for £500 to include full csv and KML downloads of all Wind project data.

To create a login account see: User Registration. This will allow 30 page views each session rather than 5

One subscription covers your organisation / school / university / company . NOT per user

Blantyre Muir Wind Farm (Wind , Active)

 General Information.

Location in the UK : Scotland, East Kilbride    
Type of installation: Wind    on/offshore: on
Turbines :6  Capacity : 12.3 MW
Approx Date of 1st power generation: September 2013

Subscribe to Renewables Map to see: Wind Turbines make / model / hub height / elevation / latitude and longitude. Accurate data available for 99% of all Active wind farms listed, also cross reference to DECC and OFGEM datasets

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

Blantyre Muir Wind Farm, situated west of Hamilton, is expected to generate enough clean electricity to power over 6,500 homes

 Turbine Make and Specs

For Wind projects, Subscribed version includes Turbine data, average hub height, average elevation
Subscriber Register

 Address

Blantyre Muir Wind Farm Green Recycling Plant Newhousemill Road Blantyre G72 0TR Scotland

 Associated Companies.

Relationship Company (For: Blantyre Muir )
ContractorRaymond Brown Renewables
DeveloperWest Coast Energy Ltd

 DECC Data on this Project: Blantyre Muir :3810

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Blantyre Muir Wind Farm extension     7.5 MW
Energy Type: Wind Onshore
County: Strathclyde     Country: Scotland     LPA: South Lanarkshire Council
Site ID and Reference: 4240 / C2616     District:
Applicant: West Coast Energy     Application : HM/10/0478 (Go to search to find Application)
For Wind Farms  
Number of Turbines: 3 Turbine Capacity: 2.5
Height of Turbines: Calculated capacity: 7.5
Site Address: Near Laigh Muirhouses Farm Muttonhole Road Hamilton 
 
County: Strathclyde Region: Scotland
OS Coordinates: 268888 / 268888
Development Status: Operational
Application Submitted: 10/4/2010 Planning Permission Granted
Application Determined: Permission refused:
Construction Date: 6/4/2012    
Generator Live 1/15/2014 This Record Last Updated: 1/5/2015
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

Site Name: Blantyre Muir Wind Farm     9 MW
Energy Type: Wind Onshore
County: Strathclyde     Country: Scotland     LPA: South Lanarkshire Council
Site ID and Reference: 3810 / AA407     District:
Applicant: Blantyre Muir Wind Energy Ltd      Application : HM/07/0563 (Go to search to find Application)
For Wind Farms  
Number of Turbines: 3 Turbine Capacity: 3
Height of Turbines: Calculated capacity: 9
Site Address: Near Laigh Muirhouses Farm Muttonhole Road Hamilton 
 
County: Strathclyde Region: Scotland
OS Coordinates: 268888 / 268888
Development Status: Operational
Application Submitted: 8/16/2007 Planning Permission Granted
Application Determined: Permission refused:
Construction Date:    
Generator Live 12/30/2013 This Record Last Updated: 2/25/2014
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Blantyre Muir: Wind : R00211SQSC

Site Name: Blantyre Muir Wind Energy Ltd
Generator Type: On-shore wind (ROS code = SQ)
Scheme : RO Generator ID: R00211SQSC
Capacity: 12200 Status: Live
Accreditation Date: 8/16/2007    
Commission Date: 9/18/2013    
Applicant: Blantyre Muir Wind Energy Limited
Applicant Address: 5th Floor Senator House 85 Queen Victoria Street London EC4V 4DP England
Address: Blantyre Muir Wind Farm Green Recycling Plant Newhousemill Road Blantyre G72 0TR Scotland

 Calculations


Capacity: 24.6
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 25 m/s (55.925 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 4/29/2024
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 24.6 start: 5 Optimum: 15/ Stop: 25 / wind: / ratio 353736

Project Info
Location Plan

West Coast Energy: Blantyre Moor Wind Farm

West Coast Energy BLANTYRE MUIR Wind Farm

REpower has signed five new contracts for the UK with a total capacity of 66MW
The company will supply five MM82 turbines, for Wathegar wind farm in Caithness, as well as six MM92 turbines for the BLANTYRE MUIR wind farm in South Lanarkshire and four MM92 turbines for Barlockhart Moor wind farm

©2018 Simon Mallett
Latest News Added
Carn Nicholas
Drone footage
Date and Time of entry: Tuesday, March 19, 2024 00:00

Carn Nicholas Solar Park
The site, developed and constructed by Innova Renewables, was energised earlier this year following the beginning of its construction in May 2022.
Date and Time of entry: Tuesday, March 19, 2024 00:00

Dorset Green
Dorset Green H2 – South West’s first solar to green hydrogen production plant ready to produce clean, zero emission, green renewable energy
Date and Time of entry: Tuesday, March 19, 2024 00:00

Dragon LNG Meadow

Date and Time of entry: Tuesday, March 19, 2024 00:00

Pretoria rd looking towards Ellistown.Solar farm.

Date and Time of entry: Tuesday, March 19, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School