Sorry I found no matches, Please try again. 176
vid = 290pws_id = 324250pws_id = 324250
--------------------------------------------------------
(825) Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 18.117.216.36 {832) YESU WSHW: 1/10
Loading
Page views this IP this session = 1 of 10 unsubscribed pages

North Pickenham Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Subscribers see an interactive map with North Pickenham Wind Farm and local projects displayed.

( Subscribe for £100 )to have full access to all Wind projects and details.


Subscribe to Wind for exact generator location including nearby generators
For an example of a wind project see: Little Cheyne Court Wind Farm


Subscribe for £500 to include full csv and KML downloads of all Wind project data.

To create a login account see: User Registration. This will allow 30 page views each session rather than 5

One subscription covers your organisation / school / university / company . NOT per user

North Pickenham Wind Farm (Wind , Active)

 General Information.

Location in the UK : England, Norfolk, Swaffham    
Type of installation: Wind    on/offshore: on
Turbines :8  Capacity : 14.4 MW
Approx Date of 1st power generation: November 2006

Subscribe to Renewables Map to see: Wind Turbines make / model / hub height / elevation / latitude and longitude. Accurate data available for 99% of all Active wind farms listed, also cross reference to DECC and OFGEM datasets

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

The North Pickenham turbines will be similar in size to the second Swaffham turbine, at 280ft to the hub, and the wind farm will help reduce carbon dioxide emissions by 50,600 tonnes annually.

 Turbine Make and Specs

For Wind projects, Subscribed version includes Turbine data, average hub height, average elevation
Subscriber Register

 Address

North Pickenham Windfarm - A (1/10/06) North Pickenham Windfarm Watton Road North Pickenham PE37 7QTEngland

 Associated Companies.

Relationship Company (For: North Pickenham )
DeveloperEnertrag
OwnerTemporis Capital LLP

 DECC Data on this Project: North Pickenham :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: North Pickenham Airfield     4 MW
Energy Type: Wind Onshore
County: Norfolk     Country: England     LPA: Breckland Council
Site ID and Reference: 3828 / AA516     District:
Applicant: Bernard Matthews Green Energy     Application : 3PL/2009/0881/F (Go to search to find Application)
For Wind Farms  
Number of Turbines: 2 Turbine Capacity: 2
Height of Turbines: Calculated capacity: 4
Site Address: North Pickenham Road, Breckland
 
County: Norfolk Region: Eastern
OS Coordinates: 585114 / 585114
Development Status: Operational
Application Submitted: 9/22/2009 Planning Permission Granted
Application Determined: Permission refused:
Construction Date:    
Generator Live 4/1/2014 This Record Last Updated: 3/2/2015
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

Site Name: North Pickenham     14.4 MW
Energy Type: Wind Onshore
County: Norfolk     Country: England     LPA: Breckland Council
Site ID and Reference: 4686 / EN00216     District:
Applicant: Foresight Group     Application : (Go to search to find Application)
For Wind Farms  
Number of Turbines: 8 Turbine Capacity: 1.8
Height of Turbines: Calculated capacity: 14.4
Site Address: near Hempnall South Norfolk
 
County: Norfolk Region: Eastern
OS Coordinates: 585000 / 585000
Development Status: Operational
Application Submitted: 3/1/2004 Planning Permission Granted
Application Determined: Permission refused:
Construction Date:    
Generator Live 10/1/2006 This Record Last Updated: 5/6/2009
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: North Pickenham: Wind :

Site Name: North Pickenham Airfield
Generator Type: On-shore wind (RO code = RQ)
Scheme : RO Generator ID: R00329RQEN
Capacity: 3920 Status: Live
Accreditation Date: 3/1/2004    
Commission Date: 3/26/2014    
Applicant: Temporis Capital LLP
Applicant Address: Temporis Capital LLP Berger House 36-38 London W1J 5AE England
Address: North Pickenham Airfield Wind Farm North Pickering Road North Pickenham Norfolk PE37 8JX England

Site Name: North Pickenham Airfield
Generator Type: Wind
Scheme : REGO Generator ID: G02355NWEN
Capacity: 3920 Status: Live
Accreditation Date: 3/1/2004    
Commission Date: 3/26/2014    
Applicant: Temporis Capital LLP
Applicant Address: Temporis Capital LLP Berger House 36-38 London W1J 5AE England
Address: North Pickenham Airfield Wind Farm North Pickering Road North Pickenham Norfolk PE37 8JX England
 
Assumptions: Capacity: 3920kW 3.92 MW,
Thus over the month Capacity * 720 hours per month = 2822.4 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status
01/05/2018 691 17.63% Issued
01/04/2018 880 22.45% Issued
01/03/2018 1090 27.81% Issued
01/02/2018 1053 26.86% Issued
01/01/2018 1458 37.19% Issued
01/12/2017 1370 34.95% Retired
01/11/2017 1055 26.91% Retired
01/10/2017 1341 34.21% Retired
01/09/2017 704 17.96% Retired
01/08/2017 654 16.68% Retired
01/07/2017 664 16.94% Retired
01/06/2017 918 23.42% Retired
01/05/2017 754 19.23% Issued
01/04/2017 737 18.80% Issued
01/03/2017 1187 30.28% Retired
01/02/2017 1085 27.68% Retired
01/01/2017 859 21.91% Retired
Dec-16 0787 875 22.32% Issued
Nov-16 0899 894 22.81% Issued
Oct-16 0631 701 17.88% Retired
Oct-16 00 701 17.88% Pending Tr
Sep-16 0625 695 17.73% Retired
Aug-16 0714 794 20.26% Retired
Jul-16 0542 603 15.38% Retired
Jul-16 0542 603 15.38% Issued
Jun-16 0443 495 12.63% Issued
May-16 0761 846 21.58% Issued
Apr-16 0746 829 21.15% Issued
Mar-16 0828 920 23.47% Retired
Feb-16 01134 1260 32.14% Retired
Jan-16 01293 1436 36.63% Retired
Dec-15 01637 1819 46.40% Retired
Nov-15 01312 1457 37.17% Retired
Oct-15 0568 631 16.10% Retired
Sep-15 0560 622 15.87% Retired
Aug-15 0624 694 17.70% Retired
Jul-15 687619 687 17.53% Redeemed
Jun-15 691622 691 17.63% Redeemed
May-15 577515 576 14.69% Redeemed
Apr-15 589530 589 15.03% Redeemed
Mar-15 11991079 1199 30.59% Redeemed
Feb-15 980882 980 25.00% Redeemed
Jan-15 14471303 1448 36.94% Redeemed
Dec-14 14991348 1498 38.21% Redeemed
Nov-14 804724 805 20.54% Redeemed
Oct-14 1027924 1027 26.20% Redeemed
Sep-14 248221 248 6.33% Redeemed
Aug-14 803723 803 20.48% Redeemed
Jul-14 496446 496 12.65% Redeemed
Jun-14 290259 290 7.40% Redeemed
May-14 242217 242 6.17% Redeemed
Apr-14 722650 722 18.42% Redeemed
Mar-14 8072 81 2.07% Expired

 Calculations


Capacity: 70.8
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 25 m/s (55.925 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 4/26/2024
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 70.8 start: 5 Optimum: 15/ Stop: 25 / wind: / ratio 324250

Project Info
FSX NORTH PICKENHAM WIND FARM SCENERY

First wind farm going up
It has been more than two years since Breckland Council gave planning consent for the wind farm on the remote 5.7 acre site at NORTH PICKENHAM where residents were praised for being IMBYs – in my back yard – after backing the plans.

Wikipedia: NORTH PICKENHAM

LDA: NORTH PICKENHAM WIND FARM

Youtube: NORTH PICKENHAM Wind Farm

©2018 Simon Mallett
Latest News Added
Carn Nicholas
Drone footage
Date and Time of entry: Tuesday, March 19, 2024 00:00

Carn Nicholas Solar Park
The site, developed and constructed by Innova Renewables, was energised earlier this year following the beginning of its construction in May 2022.
Date and Time of entry: Tuesday, March 19, 2024 00:00

Dorset Green
Dorset Green H2 – South West’s first solar to green hydrogen production plant ready to produce clean, zero emission, green renewable energy
Date and Time of entry: Tuesday, March 19, 2024 00:00

Dragon LNG Meadow

Date and Time of entry: Tuesday, March 19, 2024 00:00

Pretoria rd looking towards Ellistown.Solar farm.

Date and Time of entry: Tuesday, March 19, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School