Glenchamber Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Subscribers see an interactive map with Glenchamber Wind Farm and local projects displayed.

( Subscribe for £100 )to have full access to all Wind projects and details.


Subscribe to Wind for exact generator location including nearby generators
For an example of a wind project see: Little Cheyne Court Wind Farm


Subscribe for £500 to include full csv and KML downloads of all Wind project data.

To create a login account see: User Registration. This will allow 30 page views each session rather than 5

One subscription covers your organisation / school / university / company . NOT per user

Glenchamber Wind Farm (Wind , Active)

 General Information.

Location in the UK : Scotland, Newton Stewart    
Type of installation: Wind    on/offshore: on
Turbines :11  Capacity : 25.3 MW
Approx Date of 1st power generation: June 2016

Subscribe to Renewables Map to see: Wind Turbines make / model / hub height / elevation / latitude and longitude. Accurate data available for 99% of all Active wind farms listed, also cross reference to DECC and OFGEM datasets

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

RES has been allowed to amend some conditions imposed on its 11-turbine Glenchamber project between New Luce, Kirkcowan and Glenluce.
In October 2010, RES applied for planning permission to construct an 11 turbine wind farm at Glenchamber, between New Luce, Kirkcowan and Glenluce, in Dumfries and Galloway. In July 2012, RES received consent for the 25.3MW project.

 Turbine Make and Specs

For Wind projects, Subscribed version includes Turbine data, average hub height, average elevation
Subscriber Register

 Address

Glenchamber Glenluce Newton Stewart DG80PB Scotland

 Associated Companies.

Relationship Company (For: Glenchamber )
DeveloperRES Renewable Energy Systems Ltd
OwnerRES Renewable Energy Systems Ltd
OperatorRES Renewable Energy Systems Ltd

 DECC Data on this Project: Glenchamber :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Glenchamber Wind Farm     27.5 MW
Energy Type: Wind Onshore
County: Dumfries and Galloway     Country: Scotland     LPA: Dumfries and Galloway Council
Site ID and Reference: 4638 / AA143     District:
Applicant: Renewable Energy Systems (RES)     Application : 10/P/1/0494 (Go to search to find Application)
For Wind Farms  
Number of Turbines: 11 Turbine Capacity: 2.5
Height of Turbines: Calculated capacity: 27.5
Site Address: between New Luce, Kirkcowan and Glenluce
 
County: Dumfries and Galloway Region: Scotland
OS Coordinates: 223765 / 223765
Development Status: Operational
Application Submitted: 10/28/2010 Planning Permission Granted
Application Determined: Permission refused: 9/30/2011
Construction Date: 2/6/2015    
Generator Live 6/1/2016 This Record Last Updated: 4/4/2017
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted: 9/30/2011

 OFGEM Data on this Project: Glenchamber: Wind :

Site Name: Glenchamber Wind Farm
Generator Type: On-shore wind (ROS code = SQ)
Scheme : RO Generator ID: P00258SQSC
Capacity: 27400 Status: Preliminary
Accreditation Date: 10/28/2010    
Commission Date: 9/29/2016    
Applicant: RES Ltd
Applicant Address: Beaufort Court Egg Farm Lane Kings Langley WD4 8LR England
Address: Glenchamber Glenluce Newton Stewart DG80PB Scotland

Site Name: Glenchamber - GP
Generator Type: Wind
Scheme : REGO Generator ID: G02436NWSC
Capacity: 27300 Status: Live
Accreditation Date: 10/28/2010    
Commission Date: 6/28/2016    
Applicant: RES Ltd
Applicant Address: Beaufort Court Egg Farm Lane Kings Langley WD4 8LR England
Address: Glenchamber Glenluce Newton Stewart DG80PB Scotland
 
Assumptions: Capacity: 27300kW 27.3 MW,
Thus over the month Capacity * 720 hours per month = 19656 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status
01/03/2018 6231 22.82% Issued
01/02/2018 7087 25.96% Issued
01/01/2018 10435 38.22% Issued
01/12/2017 7607 27.86% Issued
01/11/2017 7146 26.18% Issued
01/10/2017 8737 32.00% Issued
01/09/2017 6423 23.53% Issued
01/08/2017 4702 17.22% Issued
01/07/2017 4397 16.11% Issued
01/06/2017 5985 21.92% Issued
01/05/2017 4335 15.88% Issued
01/04/2017 7496 27.46% Issued
01/03/2017 6625 24.27% Redeemed
01/02/2017 3042 11.14% Redeemed
01/01/2017 8202 30.04% Redeemed
Dec-16 07072 7858 28.78% Issued
Nov-16 04659 5176 18.96% Issued
Oct-16 05079 5644 20.67% Issued
Sep-16 03880 4312 15.79% Issued
Aug-16 02985 3316 12.15% Issued
Jul-16 0654 739 2.71% Issued

 Calculations


Capacity: 50.6
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 25 m/s (55.925 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 4/28/2024
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 50.6 start: 5 Optimum: 15/ Stop: 25 / wind: / ratio 352768

Project Info
GLENCHAMBER Non technical summary

GLENCHAMBER Wind Farm

Its in the wind: GLENCHAMBER

GLENCHAMBER, Horn Burn and Gilston wind farm appeals meet mixed fates
The Scottish government has rejected plans for two Borders wind farms but allowed condition changes on a Dumfries and Galloway scheme.

LETTERS: We will live in one huge windfarm
It does not require much imagination to figure out that this is a prelude to another windfarm which will join up Airies, Artfield, Balmurrie Fell, GLENCHAMBER, Carscreugh, Barlochart Fell.

©2018 Simon Mallett
Latest News Added
Carn Nicholas
Drone footage
Date and Time of entry: Tuesday, March 19, 2024 00:00

Carn Nicholas Solar Park
The site, developed and constructed by Innova Renewables, was energised earlier this year following the beginning of its construction in May 2022.
Date and Time of entry: Tuesday, March 19, 2024 00:00

Dorset Green
Dorset Green H2 – South West’s first solar to green hydrogen production plant ready to produce clean, zero emission, green renewable energy
Date and Time of entry: Tuesday, March 19, 2024 00:00

Dragon LNG Meadow

Date and Time of entry: Tuesday, March 19, 2024 00:00

Pretoria rd looking towards Ellistown.Solar farm.

Date and Time of entry: Tuesday, March 19, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School