Sorry I found no matches, Please try again. 176
vid = 2275pws_id = 353193pws_id = 353193
--------------------------------------------------------
(825) Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 3.137.192.3 {832) YESU WSHW: 1/10
Loading
Page views this IP this session = 1 of 10 unsubscribed pages

Penny Hill Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Subscribers see an interactive map with Penny Hill Wind Farm and local projects displayed.

( Subscribe for £100 )to have full access to all Wind projects and details.


Subscribe to Wind for exact generator location including nearby generators
For an example of a wind project see: Little Cheyne Court Wind Farm


Subscribe for £500 to include full csv and KML downloads of all Wind project data.

To create a login account see: User Registration. This will allow 30 page views each session rather than 5

One subscription covers your organisation / school / university / company . NOT per user

Penny Hill Wind Farm (Wind , Active)

 General Information.

Location in the UK : England, Rotherham M1, M18 Junction    
Type of installation: Wind    on/offshore: on
Turbines :6  Capacity : 20.4 MW
Approx Date of 1st power generation: April 2013

Subscribe to Renewables Map to see: Wind Turbines make / model / hub height / elevation / latitude and longitude. Accurate data available for 99% of all Active wind farms listed, also cross reference to DECC and OFGEM datasets

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

The six turbines on land at Penny Hill Lane, near Ulley Dam, will generate enough power for 12,000 homes, developer Banks Renewables said.

Councillors approved planning for the wind farm in 2010 despite opposition from residents. They argued it would ruin the skyline and be detrimental to the newly-reinforced dam.

Plans for the 130m high turbines on the wind farm sparked a massive protest from Ulley villagers and residents in surrounding villages, but Rotherham Council approved the planning application.

Penny Hill is Banks’ third major scheme in Yorkshire, following the Marr and Hazlehead wind farms near Doncaster and Barnsley respectively. The facility’s benefit fund will be worth more than £500,000 across its 25-year working life.

 Turbine Make and Specs

For Wind projects, Subscribed version includes Turbine data, average hub height, average elevation
Subscriber Register

 Address

Ulley, Sheffield, South Yorks. S26 3YA

 Associated Companies.

Relationship Company (For: Penny Hill )
DeveloperBanks Renewables
OwnerBanks Renewables

 DECC Data on this Project: Penny Hill :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Penny Hill Lane     19.8 MW
Energy Type: Wind Onshore
County: South Yorkshire     Country: England     LPA: Rotherham Metropolitan Borough Council
Site ID and Reference: 3677 / A0108     District:
Applicant: Banks Renewables     Application : RB2009/0824 (Go to search to find Application)
For Wind Farms  
Number of Turbines: 6 Turbine Capacity: 3.2999999999999998
Height of Turbines: Calculated capacity: 19.8
Site Address: Ulley, Sheffield, South Yorks. S26 3YA
 
County: South Yorkshire Region: Yorkshire and Humber
OS Coordinates: 446825 / 446825
Development Status: Operational
Application Submitted: 7/22/2009 Planning Permission Granted
Application Determined: Permission refused:
Construction Date: 7/26/2012    
Generator Live 3/31/2013 This Record Last Updated: 8/23/2013
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Penny Hill: Wind :

Site Name: Penny Hill Wind Farm
Generator Type: On-shore wind (RO code = RQ)
Scheme : RO Generator ID: R00285RQEN
Capacity: 19063 Status: Live
Accreditation Date: 7/22/2009    
Commission Date: 3/27/2013    
Applicant: Banks Renewables (Penny Hill Wind Farm) Ltd
Applicant Address: H J Banks And Co Ltd Inkerman House Meadowfield DURHAM DH7 8XL England
Address: Banks Renewables (Penny Hill Wind Farm) Ltd Brampton Lane Rotherham S66 9BH England

Site Name: Penny Hill Wind Farm
Generator Type: Wind
Scheme : REGO Generator ID: G02179NWEN
Capacity: 19063 Status: Live
Accreditation Date: 7/22/2009    
Commission Date: 3/27/2013    
Applicant: Banks Renewables (Penny Hill Wind Farm) Ltd
Applicant Address: H J Banks And Co Ltd Inkerman House Meadowfield DURHAM DH7 8XL England
Address: Banks Renewables (Penny Hill Wind Farm) Ltd Brampton Lane Rotherham S66 9BH England
 
Assumptions: Capacity: 19063kW 19.063 MW,
Thus over the month Capacity * 720 hours per month = 13725.36 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status
01/04/2018 3051 16.00% Issued
01/03/2018 4317 22.65% Issued
01/02/2018 3766 19.76% Issued
01/01/2018 5452 28.60% Issued
01/12/2017 4549 23.86% Retired
01/11/2017 4009 21.03% Retired
01/10/2017 5134 26.93% Retired
01/09/2017 2217 11.63% Retired
01/08/2017 2410 12.64% Issued
01/07/2017 2358 12.37% Issued
01/06/2017 3529 18.51% Retired
01/05/2017 2693 14.13% Issued
01/04/2017 3150 16.52% Issued
01/03/2017 3630 19.04% Issued
01/02/2017 4059 21.29% Issued
01/01/2017 3208 16.83% Issued
Dec-16 03172 3172 16.64% Pending Tr
Nov-16 02662 2662 13.96% Pending Tr
Oct-16 02135 2135 11.20% Pending Tr
Sep-16 02775 2775 14.56% Pending Tr
Aug-16 02911 2911 15.27% Pending Tr
Jul-16 02372 2372 12.44% Pending Tr
Jul-16 02372 2372 12.44% Pending Tr
Jun-16 01394 1411 7.40% Pending Tr
May-16 02754 2754 14.45% Pending Tr
Mar-16 03228 3228 16.93% Redeemed
Feb-16 05058 5058 26.53% Redeemed
Jan-16 05323 5323 27.92% Redeemed
Dec-15 07495 7495 39.32% Redeemed
Nov-15 06327 6327 33.19% Redeemed
Oct-15 01851 1864 9.78% Redeemed
Sep-15 01384 1398 7.33% Redeemed
Aug-15 02382 2382 12.50% Issued
Jul-15 22472235 2247 11.79% Redeemed
Jun-15 26342634 2634 13.82% Redeemed
May-15 43404340 1562 8.19% Redeemed
Apr-15 25172505 2518 13.21% Redeemed
Mar-15 50985098 1345 7.06% Redeemed
Feb-15 35143513 3513 18.43% Redeemed
Jan-15 59485948 5948 31.20% Redeemed
Dec-14 57515751 5751 30.17% Redeemed
Nov-14 28282828 2828 14.84% Redeemed
Oct-14 47224722 4722 24.77% Redeemed
Sep-14 704685 704 3.69% Redeemed
Aug-14 33883378 3388 17.77% Redeemed
Jul-14 17551743 1755 9.21% Redeemed
Jun-14 834822 834 4.37% Redeemed
May-14 23912391 2391 12.54% Redeemed
Apr-14 24862486 2486 13.04% Redeemed
Mar-14 43814381 4381 22.98% Expired
Feb-14 68686869 6869 36.03% Redeemed
Jan-14 55465546 5545 29.09% Redeemed
Dec-13 66256625 6625 34.75% Redeemed
Nov-13 32033203 3202 16.80% Redeemed
Oct-13 53545354 5354 28.09% Redeemed
Sep-13 23182317 2317 12.15% Redeemed
Aug-13 24962496 2496 13.09% Redeemed
Jul-13 10501033 1050 5.51% Redeemed
Jun-13 23402340 2340 12.28% Redeemed
May-13 26442644 2644 13.87% Redeemed
Apr-13 11261120 1127 5.91% Redeemed
Mar-13 10 1 0.01% Expired

 Calculations


Capacity: 40.8
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 25 m/s (55.925 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 4/26/2024
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 40.8 start: 5 Optimum: 15/ Stop: 25 / wind: / ratio 353193

Project Info
Local Blog re: PENNY HILL Lane Wind Farm

REpower crosses historic 1 GW milestone in UK
These include the PENNY HILL wind farm developed by Banks Renewables which features six 3.4M104 turbines and was the project that took REpower UK to 1 GW.

Rotherham's £21.9m wind farm is switched on
The six turbines on land at PENNY HILL Lane, near Ulley Dam, will generate enough power for 12,000 homes, developer Banks Renewables said.

©2018 Simon Mallett
Latest News Added
Carn Nicholas
Drone footage
Date and Time of entry: Tuesday, March 19, 2024 00:00

Carn Nicholas Solar Park
The site, developed and constructed by Innova Renewables, was energised earlier this year following the beginning of its construction in May 2022.
Date and Time of entry: Tuesday, March 19, 2024 00:00

Dorset Green
Dorset Green H2 – South West’s first solar to green hydrogen production plant ready to produce clean, zero emission, green renewable energy
Date and Time of entry: Tuesday, March 19, 2024 00:00

Dragon LNG Meadow

Date and Time of entry: Tuesday, March 19, 2024 00:00

Pretoria rd looking towards Ellistown.Solar farm.

Date and Time of entry: Tuesday, March 19, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School