Stroupster Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Subscribers see an interactive map with Stroupster Wind Farm and local projects displayed.

( Subscribe for £100 )to have full access to all Wind projects and details.


Subscribe to Wind for exact generator location including nearby generators
For an example of a wind project see: Little Cheyne Court Wind Farm


Subscribe for £500 to include full csv and KML downloads of all Wind project data.

To create a login account see: User Registration. This will allow 30 page views each session rather than 5

One subscription covers your organisation / school / university / company . NOT per user

Stroupster Wind Farm (Wind , Active)

 General Information.

Location in the UK : Scotland, Highland, Stroupster    
Type of installation: Wind    on/offshore: on
Turbines :13  Capacity : 24 MW
Approx Date of 1st power generation: December 2015

Subscribe to Renewables Map to see: Wind Turbines make / model / hub height / elevation / latitude and longitude. Accurate data available for 99% of all Active wind farms listed, also cross reference to DECC and OFGEM datasets

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

German renewables outfit BayWa has snapped up the Stroupster wind farm in Caithness, near Wick, to cement its presence in the UK market.

Subsequently bought by Greencoat December 2015
The scheme is likely to have 12 turbines and an installed capacity of around 28 MW. Grid connection is expected in late 2014, with commercial operations kicking off in early 2015

Turbine:113m to tip

Enercon 2MW (E70?)

 Turbine Make and Specs

For Wind projects, Subscribed version includes Turbine data, average hub height, average elevation
Subscriber Register

 Address

Hill of Stroupster Nybster KW1 4XP Scotland

 Associated Companies.

Relationship Company (For: Stroupster )
DeveloperBayWa r.e. UK Ltd
OwnerGreencoat
OperatorGreencoat
DeveloperRenerco

 DECC Data on this Project: Stroupster :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Stroupster Wind Farm - additional turbine     2.3 MW
Energy Type: Wind Onshore
County: Highland     Country: Scotland     LPA: Highland Council
Site ID and Reference: 3433 / C1820     District:
Applicant: Greencoat UK Wind/Bay Wa .r.e/ SunGift     Application : 13/04144/FUL (Go to search to find Application)
For Wind Farms  
Number of Turbines: 1 Turbine Capacity: 2.2999999999999998
Height of Turbines: Calculated capacity: 2.3
Site Address: Stroupster, Caithness
 
County: Highland Region: Scotland
OS Coordinates: 333969 / 333969
Development Status: Operational
Application Submitted: 11/5/2013 Planning Permission Granted
Application Determined: Permission refused:
Construction Date: 7/1/2014    
Generator Live 10/15/2015 This Record Last Updated: 3/18/2016
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

Site Name: Hill of Stroupster Windfarm     29.9 MW
Energy Type: Wind Onshore
County: Highland     Country: Scotland     LPA: Highland Council
Site ID and Reference: 4121 / N00216W     District:
Applicant: Greencoat UK Wind     Application : 05/00273/FULCA (Go to search to find Application)
For Wind Farms  
Number of Turbines: 12 Turbine Capacity: 2.5
Height of Turbines: Calculated capacity: 30
Site Address: Stroupster, Caithness
 
County: Highland Region: Scotland
OS Coordinates: 334250 / 334250
Development Status: Operational
Application Submitted: 6/7/2005 Planning Permission Granted
Application Determined: Permission refused: 5/1/2006
Construction Date: 11/30/2013    
Generator Live 12/3/2015 This Record Last Updated: 1/18/2016
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted: 5/1/2006

Site Name: Hill of Stroupster     36 MW
Energy Type: Wind Onshore
County: Highland     Country: Scotland     LPA: Highland Council
Site ID and Reference: 3696 / A0226     District:
Applicant: Npower Renewables     Application : 07/00244/FUL (Go to search to find Application)
For Wind Farms  
Number of Turbines: 12 Turbine Capacity: 3
Height of Turbines: Calculated capacity: 36
Site Address: Aukengill, Highland
 
County: Highland Region: Scotland
OS Coordinates: 337895 / 337895
Development Status: Planning Application Withdrawn
Application Submitted: Planning Permission Granted
Application Determined: Permission refused:
Construction Date:    
Generator Live This Record Last Updated: 11/7/2012
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn: 11/7/2012    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Stroupster: Wind :

Site Name: Stroupster1
Generator Type: On-shore wind (ROS code = SQ)
Scheme : RO Generator ID: R00246SQSC
Capacity: 29600 Status: Live
Accreditation Date:    
Commission Date: 8/7/2015    
Applicant: Stroupster Caithness Wind Farm Limited
Applicant Address: C/O 46 27/28 Eastcastle Street LONDON W1W 8DH England
Address: Hill of Stroupster Nybster KW1 4XP Scotland

Site Name: Stroupster1
Generator Type: Wind
Scheme : REGO Generator ID: G02285NWSC
Capacity: 29600 Status: Live
Accreditation Date:    
Commission Date: 8/7/2015    
Applicant: Stroupster Caithness Wind Farm Limited
Applicant Address: C/O 46 27/28 Eastcastle Street LONDON W1W 8DH England
Address: Hill of Stroupster Nybster KW1 4XP Scotland
 
Assumptions: Capacity: 29600kW 29.6 MW,
Thus over the month Capacity * 720 hours per month = 21312 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status
01/04/2018 6245 21.10% Issued
01/03/2018 10769 36.38% Issued
01/02/2018 8504 28.73% Issued
01/01/2018 9843 33.25% Issued
01/12/2017 8453 28.56% Issued
01/11/2017 11034 37.28% Issued
01/10/2017 10240 34.59% Issued
01/09/2017 8239 27.83% Issued
01/08/2017 5502 18.59% Issued
01/07/2017 4811 16.25% Issued
01/06/2017 5826 19.68% Issued
01/05/2017 5223 17.65% Issued
01/04/2017 9158 30.94% Issued
01/04/2017 1015 3.43% Issued
01/03/2017 7700 26.01% Redeemed
01/03/2017 8 0.03% Issued
01/02/2017 10113 34.17% Redeemed
01/01/2017 9791 33.08% Redeemed
Dec-16 08758 9731 32.88% Issued
Nov-16 07509 8344 28.19% Issued
Oct-16 07165 7961 26.90% Issued
Sep-16 06410 7122 24.06% Issued
Aug-16 05435 6039 20.40% Issued
Jul-16 04099 4554 15.39% Issued
Jul-16 04099 4554 15.39% Pending Tr
Jun-16 04070 3777 12.76% Pending Tr
May-16 04771 5302 17.91% Pending Tr
Apr-16 06914 7683 25.96% Issued
Nov-15 07981 8868 29.96% Redeemed
Oct-15 06356 7062 23.86% Redeemed
Sep-15 05789 6433 21.73% Redeemed
Aug-15 01172 1322 4.47% Redeemed

 Calculations


Capacity: 59.8
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 31 m/s (69.347 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 4/28/2024
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 59.8 start: 5 Optimum: 15/ Stop: 31 / wind: / ratio 353521

Project Info
Caithness wind farm bought by Greencoat for £85m
PRIVATE equity group Greencoat has completed its largest single investment in UK wind energy with the £85 million acquisition of STROUPSTER in Caithness. (November 2015)

STROUPSTER Wind Farm
The STROUPSTER wind farm was acquired by BayWa r.e. from RWE npower in 2013 as part of a longer-term UK pipeline investment. BayWa r.e. developed and constructed the project in the role of project owner and EPC contractor.

STROUPSTER Planning

Lucky 13 for STROUPSTER
Highland Council planners have given the green light to an additional Enercon E-70 at BayWa's under-construction STROUPSTER wind farm. Members of the north planning applications committee, unanimously approved the 2.3MW machine without discussion.

German BayWa buys fourth wind farm in UK from RWE npower
German wind farm developer BayWa r.e. renewable energy GmbH has acquired, via its investment arm Renerco AG, the project rights for the 28-MW STROUPSTER wind farm in northern Scotland from RWE npower

©2018 Simon Mallett
Latest News Added
Carn Nicholas
Drone footage
Date and Time of entry: Tuesday, March 19, 2024 00:00

Carn Nicholas Solar Park
The site, developed and constructed by Innova Renewables, was energised earlier this year following the beginning of its construction in May 2022.
Date and Time of entry: Tuesday, March 19, 2024 00:00

Dorset Green
Dorset Green H2 – South West’s first solar to green hydrogen production plant ready to produce clean, zero emission, green renewable energy
Date and Time of entry: Tuesday, March 19, 2024 00:00

Dragon LNG Meadow

Date and Time of entry: Tuesday, March 19, 2024 00:00

Pretoria rd looking towards Ellistown.Solar farm.

Date and Time of entry: Tuesday, March 19, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School