Loading
Page views this IP this session = 1 of 10 unsubscribed pagesTullo Wind Farm
Click here for Generation Forecast for wind farms based on Met office data
Subscribers see an interactive map with Tullo Wind Farm and local projects displayed.
( Subscribe for £100 )to have full access to all Wind projects and details.
Subscribe to Wind for exact generator location including nearby generators
For an example of a wind project see: Little Cheyne Court Wind Farm
Subscribe for £500 to include full csv and KML downloads of all Wind project data.
To create a login account see: User Registration. This will allow 30 page views each session rather than 5
One subscription covers your organisation / school / university / company . NOT per user
|
Tullo Wind Farm (Wind , Active) Location in the UK : Scotland, Laurencekirk, South of Aberdeen Type of installation: Wind on/offshore: on Turbines :7 Capacity : 17 MW Approx Date of 1st power generation: October 2010
Subscribe to Renewables Map to see: Wind Turbines make / model / hub height / elevation / latitude and longitude. Accurate data available for 99% of all Active wind farms listed, also cross reference to DECC and OFGEM datasets
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
November 2008 was sold by West Coast Energy to Eneco Wind UK
The wind farm will comprise 8 wind turbines, each having a three bladed rotor of up to 70 metres in diameter supported on a tapered cylindrical tower to a height of up to 65 metres to the rotor hub and up to 100 metres to the blade tip. Each turbine will have a power output of 1.5 Megawatts (MW). The generation capacity of the wind farm will be 12 MW.
The wind farm is expected to be operational by October 2010 and will remain in situ for 25 years. It will then be decommissioned and the turbines removed. A new planning application would have to be submitted if the turbines were to be replaced. For Wind projects, Subscribed version includes Turbine data, average hub height, average elevation Subscriber Register Tullo windfarm near Garvock Laurencekirk AB30 1HS Scotland
Relationship |
Company (For:
Tullo
) |
Developer | Eneco | Operator | Eneco |
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Tullo Wind Farm South (Ext.) 10 MW
|
Energy Type: |
Wind Onshore |
County: |
Grampian Country: Scotland LPA: Aberdeenshire Council
|
Site ID and Reference: |
4422 / C0012
District:
|
Applicant: |
Eneco
Application :
APP/2011/3694
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
4 |
Turbine Capacity: |
2.5 |
Height of Turbines: |
|
Calculated capacity: |
10 |
Site Address: |
Tullo Farm, Laurencekirk
AB30 1HS
|
|
|
County: |
Grampian Region: Scotland
|
OS Coordinates: |
375388 / 375388
|
Development Status: |
Operational
|
Application Submitted: |
11/28/2011
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
5/1/2013
|
|
|
Generator Live |
7/1/2014
|
This Record Last Updated: |
11/27/2014
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Easter Tulloch Wind Farm (Tullo Extension) 25 MW
|
Energy Type: |
Wind Onshore |
County: |
Grampian Country: Scotland LPA: Aberdeenshire Council
|
Site ID and Reference: |
4365 / AA457
District:
|
Applicant: |
N R Gammie Partnership
Application :
APP/2011/2603
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
10 |
Turbine Capacity: |
2.5 |
Height of Turbines: |
|
Calculated capacity: |
25 |
Site Address: |
Land to North of
Tullo Farm
Laurencekirk
|
|
|
County: |
Grampian Region: Scotland
|
OS Coordinates: |
375955 / 375955
|
Development Status: |
Operational
|
Application Submitted: |
8/9/2011
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
5/1/2013
|
|
|
Generator Live |
6/30/2014
|
This Record Last Updated: |
9/3/2014
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Tullo Wind Farm North Extension (Shiels Wind Farm) 7.5 MW
|
Energy Type: |
Wind Onshore |
County: |
Grampian Country: Scotland LPA: Aberdeenshire Council
|
Site ID and Reference: |
3818 / AA449
District:
|
Applicant: |
Eneco
Application :
APP/2011/2389
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
3 |
Turbine Capacity: |
2.5 |
Height of Turbines: |
|
Calculated capacity: |
7.5 |
Site Address: |
Laurencekirk
|
|
AB30 1NB
|
County: |
Grampian Region: Scotland
|
OS Coordinates: |
375080 / 375080
|
Development Status: |
Operational
|
Application Submitted: |
7/28/2011
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
4/30/2013
|
|
|
Generator Live |
4/1/2014
|
This Record Last Updated: |
3/20/2014
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Tullo Farm 17.5 MW
|
Energy Type: |
Wind Onshore |
County: |
Grampian Country: Scotland LPA: Aberdeenshire Council
|
Site ID and Reference: |
3190 / N00186W
District:
|
Applicant: |
West Coast Energy (agents for Tullo Wind Ltd and GE Wind)
Application :
APP/2003/0756
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
7 |
Turbine Capacity: |
2.5 |
Height of Turbines: |
|
Calculated capacity: |
17.5 |
Site Address: |
Tullo Farm, Laurencekirk, Aberdeenshire
Garvock
Laurencekirk
|
|
|
County: |
Grampian Region: Scotland
|
OS Coordinates: |
387283 / 387283
|
Development Status: |
Operational
|
Application Submitted: |
10/13/2003
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
4/1/2010
|
|
|
Generator Live |
9/7/2010
|
This Record Last Updated: |
10/28/2010
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Tullo Extension
|
Generator Type: |
On-shore wind (ROS code = SQ)
|
Scheme : |
RO
|
Generator ID: |
R00233SQSC
|
Capacity: |
24700
|
Status: |
Live
|
Accreditation Date: |
10/13/2003
|
|
|
Commission Date: |
5/8/2014
|
|
|
Applicant: |
Tullo WInd Farm Limited
|
Applicant Address: |
c/o Pinsent Masons
1 Park Row
Leeds
LS1 5AB
England
|
Address: |
Tullo Extension windfarm
near Garvock
Laurencekirk
AB30 1HS
Scotland
|
Site Name: |
Tullo Extension
|
Generator Type: |
Wind
|
Scheme : |
REGO
|
Generator ID: |
G02022NWSC
|
Capacity: |
24700
|
Status: |
Live
|
Accreditation Date: |
10/13/2003
|
|
|
Commission Date: |
5/8/2014
|
|
|
Applicant: |
Tullo WInd Farm Limited
|
Applicant Address: |
c/o Pinsent Masons
1 Park Row
Leeds
LS1 5AB
England
|
Address: |
Tullo Extension windfarm
near Garvock
Laurencekirk
AB30 1HS
Scotland
|
|
Assumptions: Capacity: 24700kW 24.7 MW, Thus over the month Capacity * 720 hours per month = 17784 MWh
|
Output Period |
LECs Issued |
ROCs Issued |
REGO Certs |
Capacity Factor |
Status |
01/03/2018 | | | 6198 | 25.09% | Issued | 01/02/2018 | | | 5613 | 22.72% | Issued | 01/01/2018 | | | 6181 | 25.02% | Issued | 01/12/2017 | | | 5722 | 23.17% | Issued | 01/11/2017 | | | 6535 | 26.46% | Issued | 01/10/2017 | | | 5097 | 20.64% | Issued | 01/09/2017 | | | 3335 | 13.50% | Issued | 01/08/2017 | | | 2492 | 10.09% | Issued | 01/07/2017 | | | 2495 | 10.10% | Issued | 01/06/2017 | | | 3005 | 12.17% | Issued | 01/05/2017 | | | 2564 | 10.38% | Issued | 01/04/2017 | | | 4522 | 18.31% | Issued | 01/03/2017 | | | 4024 | 16.29% | Redeemed | 01/02/2017 | | | 5906 | 23.91% | Redeemed | 01/01/2017 | | | 4969 | 20.12% | Redeemed | Dec-16 | 0 | 4718 | 5242 | 21.22% | Issued | Nov-16 | 0 | 3973 | 4414 | 17.87% | Issued | Oct-16 | 0 | 3180 | 3534 | 14.31% | Issued | Sep-16 | 0 | 3453 | 3837 | 15.53% | Issued | Aug-16 | 0 | 2617 | 2924 | 11.84% | Issued | Jul-16 | 0 | 1639 | 1835 | 7.43% | Issued | Jul-16 | 0 | 1639 | 1835 | 7.43% | Issued | Jun-16 | 0 | 2394 | 2678 | 10.84% | Issued | May-16 | 0 | 3579 | 3977 | 16.10% | Issued | Apr-16 | 0 | 3523 | 3915 | 15.85% | Issued | Mar-16 | 0 | 3177 | 3530 | 14.29% | Issued | Feb-16 | 0 | 5240 | 5822 | 23.57% | Redeemed | Jan-16 | 0 | 6993 | 7770 | 31.46% | Redeemed | Nov-15 | 0 | 5725 | 6361 | 25.75% | Redeemed | Oct-15 | 0 | 2995 | 3346 | 13.55% | Redeemed | Sep-15 | 0 | 3295 | 3661 | 14.82% | Redeemed | Aug-15 | 0 | 3215 | 3573 | 14.47% | Redeemed | Jul-15 | 3146 | 2831 | 3146 | 12.74% | Redeemed | Jun-15 | 3015 | 2700 | 3016 | 12.21% | Redeemed | May-15 | 4932 | 4439 | 4932 | 19.97% | Redeemed | Apr-15 | 2802 | 2506 | 2802 | 11.34% | Redeemed | Mar-15 | 6380 | 5742 | 6380 | 25.83% | Redeemed | Feb-15 | 5942 | 5347 | 5941 | 24.05% | Redeemed | Jan-15 | 8304 | 7474 | 8304 | 33.62% | Redeemed | Dec-14 | 6755 | 6079 | 6755 | 27.35% | Redeemed | Nov-14 | 4693 | 4223 | 4693 | 19.00% | Redeemed | Oct-14 | 4178 | 3760 | 4178 | 16.91% | Redeemed | Sep-14 | 1829 | 1627 | 1829 | 7.40% | Redeemed | Aug-14 | 3679 | 3311 | 3679 | 14.89% | Redeemed | Jul-14 | 1752 | 1560 | 1752 | 7.09% | Redeemed | Jun-14 | 1237 | 1092 | 1237 | 5.01% | Redeemed | May-14 | 1635 | 1459 | 1635 | 6.62% | Redeemed |
|
Capacity: 90 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 25 m/s (55.925 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 4/28/2024 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Carn Nicholas Drone footage Date and Time of entry: Tuesday, March 19, 2024 00:00
Carn Nicholas Solar Park The site, developed and constructed by Innova Renewables, was energised earlier this year following the beginning of its construction in May 2022. Date and Time of entry: Tuesday, March 19, 2024 00:00
Dorset Green Dorset Green H2 – South West’s first solar to green hydrogen production plant ready to produce clean, zero emission, green renewable energy Date and Time of entry: Tuesday, March 19, 2024 00:00
Dragon LNG Meadow
Date and Time of entry: Tuesday, March 19, 2024 00:00
Pretoria rd looking towards Ellistown.Solar farm.
Date and Time of entry: Tuesday, March 19, 2024 00:00
|
|
©2017
Simon Mallett |
|