Tullo Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Subscribers see an interactive map with Tullo Wind Farm and local projects displayed.

( Subscribe for £100 )to have full access to all Wind projects and details.


Subscribe to Wind for exact generator location including nearby generators
For an example of a wind project see: Little Cheyne Court Wind Farm


Subscribe for £500 to include full csv and KML downloads of all Wind project data.

To create a login account see: User Registration. This will allow 30 page views each session rather than 5

One subscription covers your organisation / school / university / company . NOT per user

Tullo Wind Farm (Wind , Active)

 General Information.

Location in the UK : Scotland, Laurencekirk, South of Aberdeen    
Type of installation: Wind    on/offshore: on
Turbines :7  Capacity : 17 MW
Approx Date of 1st power generation: October 2010

Subscribe to Renewables Map to see: Wind Turbines make / model / hub height / elevation / latitude and longitude. Accurate data available for 99% of all Active wind farms listed, also cross reference to DECC and OFGEM datasets

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

November 2008 was sold by West Coast Energy to Eneco Wind UK

The wind farm will comprise 8 wind turbines, each having a three bladed rotor of up to 70 metres in diameter supported on a tapered cylindrical tower to a height of up to 65 metres to the rotor hub and up to 100 metres to the blade tip. Each turbine will have a power output of 1.5 Megawatts (MW). The generation capacity of the wind farm will be 12 MW.

The wind farm is expected to be operational by October 2010 and will remain in situ for 25 years. It will then be decommissioned and the turbines removed. A new planning application would have to be submitted if the turbines were to be replaced.

 Turbine Make and Specs

For Wind projects, Subscribed version includes Turbine data, average hub height, average elevation
Subscriber Register

 Address

Tullo windfarm near Garvock Laurencekirk AB30 1HS Scotland

 Associated Companies.

Relationship Company (For: Tullo )
DeveloperEneco
OperatorEneco

 DECC Data on this Project: Tullo :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Tullo Wind Farm South (Ext.)     10 MW
Energy Type: Wind Onshore
County: Grampian     Country: Scotland     LPA: Aberdeenshire Council
Site ID and Reference: 4422 / C0012     District:
Applicant: Eneco     Application : APP/2011/3694 (Go to search to find Application)
For Wind Farms  
Number of Turbines: 4 Turbine Capacity: 2.5
Height of Turbines: Calculated capacity: 10
Site Address: Tullo Farm, Laurencekirk AB30 1HS
 
County: Grampian Region: Scotland
OS Coordinates: 375388 / 375388
Development Status: Operational
Application Submitted: 11/28/2011 Planning Permission Granted
Application Determined: Permission refused:
Construction Date: 5/1/2013    
Generator Live 7/1/2014 This Record Last Updated: 11/27/2014
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

Site Name: Easter Tulloch Wind Farm (Tullo Extension)     25 MW
Energy Type: Wind Onshore
County: Grampian     Country: Scotland     LPA: Aberdeenshire Council
Site ID and Reference: 4365 / AA457     District:
Applicant: N R Gammie Partnership     Application : APP/2011/2603 (Go to search to find Application)
For Wind Farms  
Number of Turbines: 10 Turbine Capacity: 2.5
Height of Turbines: Calculated capacity: 25
Site Address: Land to North of Tullo Farm Laurencekirk
 
County: Grampian Region: Scotland
OS Coordinates: 375955 / 375955
Development Status: Operational
Application Submitted: 8/9/2011 Planning Permission Granted
Application Determined: Permission refused:
Construction Date: 5/1/2013    
Generator Live 6/30/2014 This Record Last Updated: 9/3/2014
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

Site Name: Tullo Wind Farm North Extension (Shiels Wind Farm)     7.5 MW
Energy Type: Wind Onshore
County: Grampian     Country: Scotland     LPA: Aberdeenshire Council
Site ID and Reference: 3818 / AA449     District:
Applicant: Eneco     Application : APP/2011/2389 (Go to search to find Application)
For Wind Farms  
Number of Turbines: 3 Turbine Capacity: 2.5
Height of Turbines: Calculated capacity: 7.5
Site Address: Laurencekirk
  AB30 1NB
County: Grampian Region: Scotland
OS Coordinates: 375080 / 375080
Development Status: Operational
Application Submitted: 7/28/2011 Planning Permission Granted
Application Determined: Permission refused:
Construction Date: 4/30/2013    
Generator Live 4/1/2014 This Record Last Updated: 3/20/2014
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

Site Name: Tullo Farm     17.5 MW
Energy Type: Wind Onshore
County: Grampian     Country: Scotland     LPA: Aberdeenshire Council
Site ID and Reference: 3190 / N00186W     District:
Applicant: West Coast Energy (agents for Tullo Wind Ltd and GE Wind)     Application : APP/2003/0756 (Go to search to find Application)
For Wind Farms  
Number of Turbines: 7 Turbine Capacity: 2.5
Height of Turbines: Calculated capacity: 17.5
Site Address: Tullo Farm, Laurencekirk, Aberdeenshire Garvock Laurencekirk
 
County: Grampian Region: Scotland
OS Coordinates: 387283 / 387283
Development Status: Operational
Application Submitted: 10/13/2003 Planning Permission Granted
Application Determined: Permission refused:
Construction Date: 4/1/2010    
Generator Live 9/7/2010 This Record Last Updated: 10/28/2010
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Tullo: Wind :

Site Name: Tullo Extension
Generator Type: On-shore wind (ROS code = SQ)
Scheme : RO Generator ID: R00233SQSC
Capacity: 24700 Status: Live
Accreditation Date: 10/13/2003    
Commission Date: 5/8/2014    
Applicant: Tullo WInd Farm Limited
Applicant Address: c/o Pinsent Masons 1 Park Row Leeds LS1 5AB England
Address: Tullo Extension windfarm near Garvock Laurencekirk AB30 1HS Scotland

Site Name: Tullo Extension
Generator Type: Wind
Scheme : REGO Generator ID: G02022NWSC
Capacity: 24700 Status: Live
Accreditation Date: 10/13/2003    
Commission Date: 5/8/2014    
Applicant: Tullo WInd Farm Limited
Applicant Address: c/o Pinsent Masons 1 Park Row Leeds LS1 5AB England
Address: Tullo Extension windfarm near Garvock Laurencekirk AB30 1HS Scotland
 
Assumptions: Capacity: 24700kW 24.7 MW,
Thus over the month Capacity * 720 hours per month = 17784 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status
01/03/2018 6198 25.09% Issued
01/02/2018 5613 22.72% Issued
01/01/2018 6181 25.02% Issued
01/12/2017 5722 23.17% Issued
01/11/2017 6535 26.46% Issued
01/10/2017 5097 20.64% Issued
01/09/2017 3335 13.50% Issued
01/08/2017 2492 10.09% Issued
01/07/2017 2495 10.10% Issued
01/06/2017 3005 12.17% Issued
01/05/2017 2564 10.38% Issued
01/04/2017 4522 18.31% Issued
01/03/2017 4024 16.29% Redeemed
01/02/2017 5906 23.91% Redeemed
01/01/2017 4969 20.12% Redeemed
Dec-16 04718 5242 21.22% Issued
Nov-16 03973 4414 17.87% Issued
Oct-16 03180 3534 14.31% Issued
Sep-16 03453 3837 15.53% Issued
Aug-16 02617 2924 11.84% Issued
Jul-16 01639 1835 7.43% Issued
Jul-16 01639 1835 7.43% Issued
Jun-16 02394 2678 10.84% Issued
May-16 03579 3977 16.10% Issued
Apr-16 03523 3915 15.85% Issued
Mar-16 03177 3530 14.29% Issued
Feb-16 05240 5822 23.57% Redeemed
Jan-16 06993 7770 31.46% Redeemed
Nov-15 05725 6361 25.75% Redeemed
Oct-15 02995 3346 13.55% Redeemed
Sep-15 03295 3661 14.82% Redeemed
Aug-15 03215 3573 14.47% Redeemed
Jul-15 31462831 3146 12.74% Redeemed
Jun-15 30152700 3016 12.21% Redeemed
May-15 49324439 4932 19.97% Redeemed
Apr-15 28022506 2802 11.34% Redeemed
Mar-15 63805742 6380 25.83% Redeemed
Feb-15 59425347 5941 24.05% Redeemed
Jan-15 83047474 8304 33.62% Redeemed
Dec-14 67556079 6755 27.35% Redeemed
Nov-14 46934223 4693 19.00% Redeemed
Oct-14 41783760 4178 16.91% Redeemed
Sep-14 18291627 1829 7.40% Redeemed
Aug-14 36793311 3679 14.89% Redeemed
Jul-14 17521560 1752 7.09% Redeemed
Jun-14 12371092 1237 5.01% Redeemed
May-14 16351459 1635 6.62% Redeemed

 Calculations


Capacity: 90
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 25 m/s (55.925 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 4/28/2024
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 90 start: 5 Optimum: 15/ Stop: 25 / wind: / ratio 354440

Project Info
Brownieleys turbine refusal overturn farce
I live near the TULLOw wind farm. They currently have 7 turbines, but building another 10. There was planning applications for more, but thankfully Planning (Kincardine & Mearns) limited the approvals based on cumulative impact.

TULLO / Easter TULLOch
Cultural Heritage Assessment

£110K boost for dialysis unit in Stonehaven
Renewable energy company Eneco, owner of the nearby TULLO Wind Farm, officially launched Twinsheils Wind Farm earlier this month.

25MW wind farm officially open in Scotland
A wind farm which will generate enough electricity to power around 14,000 homes has officially been opened in Scotland. The £26 million Twinshiels wind farm has 10 turbines and adjoins Eneco’s TULLO wind facility – a seven-turbine development.

West Coast Energy: TULLO

©2018 Simon Mallett
Latest News Added
Carn Nicholas
Drone footage
Date and Time of entry: Tuesday, March 19, 2024 00:00

Carn Nicholas Solar Park
The site, developed and constructed by Innova Renewables, was energised earlier this year following the beginning of its construction in May 2022.
Date and Time of entry: Tuesday, March 19, 2024 00:00

Dorset Green
Dorset Green H2 – South West’s first solar to green hydrogen production plant ready to produce clean, zero emission, green renewable energy
Date and Time of entry: Tuesday, March 19, 2024 00:00

Dragon LNG Meadow

Date and Time of entry: Tuesday, March 19, 2024 00:00

Pretoria rd looking towards Ellistown.Solar farm.

Date and Time of entry: Tuesday, March 19, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School