Loading
Page views this IP this session = 1 of 10 unsubscribed pagesForss Wind Farm
Click here for Generation Forecast for wind farms based on Met office data
Subscribers see an interactive map with Forss Wind Farm and local projects displayed.
( Subscribe for £100 )to have full access to all Wind projects and details.
Subscribe to Wind for exact generator location including nearby generators
For an example of a wind project see: Little Cheyne Court Wind Farm
Subscribe for £500 to include full csv and KML downloads of all Wind project data.
To create a login account see: User Registration. This will allow 30 page views each session rather than 5
One subscription covers your organisation / school / university / company . NOT per user
|
Forss Wind Farm (Wind , Active) Location in the UK : Scotland, Highland Type of installation: Wind on/offshore: on Turbines :6 Capacity : 7.2 MW Approx Date of 1st power generation: May 2007
Subscribe to Renewables Map to see: Wind Turbines make / model / hub height / elevation / latitude and longitude. Accurate data available for 99% of all Active wind farms listed, also cross reference to DECC and OFGEM datasets
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
The existing turbines at the site were developed, built, and are owned and operated, by RES. The current 7.2 MW wind farm can provide enough clean green, renewable energy equivalent to the annual average consumption of over 3,700 homes in the Highland region. The additional turbines will provide the equivalent to the annual consumption of 3,000-5,000 homes*.
Abbey are putting together proposals to develop their former US Navy communications site at Forss, Caithness to promote the creation of an Energy and Data Park in an ambitious bid to consolidate the area's potential to be a national leader in the development of wind, wave and tidal renewable energy, and address the growing 21st century demand for secure data storage facilities. For Wind projects, Subscribed version includes Turbine data, average hub height, average elevation Subscriber Register Forss, Thurso, Caithness
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Hill of Lybster (Wind Turbine - Extension) 1.5 MW
|
Energy Type: |
Wind Onshore |
County: |
Highland Country: Scotland LPA: Highland Council
|
Site ID and Reference: |
5187 /
District:
|
Applicant: |
The Energy Workshop
Application :
17/04934/FUL
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
1 |
Turbine Capacity: |
1.5 |
Height of Turbines: |
100 |
Calculated capacity: |
1.5 |
Site Address: |
Land 200M N Of, 3 Lybster Road, Forss, Thurso, Highlands
|
|
KW14 7YA
|
County: |
Highland Region: Scotland
|
OS Coordinates: |
302481 / 302481
|
Development Status: |
Operational
|
Application Submitted: |
10/20/2017
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
8/16/2018
|
Construction Date: |
|
|
|
Generator Live |
4/12/2021
|
This Record Last Updated: |
10/2/2018
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
8/16/2018 |
Site Name: |
Forss Extension (Forss III) 6.5 MW
|
Energy Type: |
Wind Onshore |
County: |
Highland Country: Scotland LPA: Highland Council
|
Site ID and Reference: |
3783 / AA168
District:
|
Applicant: |
Renewable Energy Systems (RES)
Application :
10/04434/FUL
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
5 |
Turbine Capacity: |
1.3 |
Height of Turbines: |
|
Calculated capacity: |
6.5 |
Site Address: |
Thurso, Caithness
|
|
|
County: |
Highland Region: Scotland
|
OS Coordinates: |
302174 / 302174
|
Development Status: |
Appeal Refused
|
Application Submitted: |
10/28/2010
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
10/19/2011
|
Construction Date: |
|
|
|
Generator Live |
|
This Record Last Updated: |
1/2/2013
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
7/19/2012 |
Granted: |
|
Appeal Granted: |
10/19/2011 |
Site Name: |
Forss Wind Farm (Extension) 5.2 MW
|
Energy Type: |
Wind Onshore |
County: |
Highland Country: Scotland LPA: Highland Council
|
Site ID and Reference: |
4679 / N00065W
District:
|
Applicant: |
Renewable Energy Systems (RES)
Application :
01/00380/FULCA
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
4 |
Turbine Capacity: |
1.3 |
Height of Turbines: |
|
Calculated capacity: |
5.2 |
Site Address: |
Ex Navy Base Forss, Dounreay Thurso Caithness
|
|
KW14 7YB
|
County: |
Highland Region: Scotland
|
OS Coordinates: |
302000 / 302000
|
Development Status: |
Operational
|
Application Submitted: |
1/5/2005
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
1/1/2007
|
|
|
Generator Live |
7/1/2007
|
This Record Last Updated: |
5/10/2016
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Forss Wind Farm 2.6 MW
|
Energy Type: |
Wind Onshore |
County: |
Highland Country: Scotland LPA: Highland Council
|
Site ID and Reference: |
6636 /
District:
|
Applicant: |
Renewable Energy Systems (RES)
Application :
01/00030/FULCA
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
2 |
Turbine Capacity: |
1.3 |
Height of Turbines: |
99 |
Calculated capacity: |
2.6 |
Site Address: |
Wind Turbine Ex Navy Base Forss Dounreay Thurso Caithness
|
|
KW14 7YB
|
County: |
Highland Region: Scotland
|
OS Coordinates: |
302000 / 302000
|
Development Status: |
Operational
|
Application Submitted: |
1/12/2001
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
1/1/2003
|
|
|
Generator Live |
7/1/2003
|
This Record Last Updated: |
6/4/2018
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Hill of Lybster 4.9 MW
|
Energy Type: |
Wind Onshore |
County: |
Highland Country: Scotland LPA: Highland Council
|
Site ID and Reference: |
3309 / S0036W3
District:
|
Applicant: |
Fivestone Ltd (subsidiary of Abbey Produce)
Application :
CA2001030
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
4 |
Turbine Capacity: |
1.3 |
Height of Turbines: |
|
Calculated capacity: |
5.2 |
Site Address: |
Forss Phase 2, Caithness
|
|
|
County: |
Highland Region: Scotland
|
OS Coordinates: |
302000 / 302000
|
Development Status: |
Operational
|
Application Submitted: |
4/28/2000
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
|
|
|
Generator Live |
2/8/2003
|
This Record Last Updated: |
6/9/2010
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Forss Wind Farm Phase 2
|
Generator Type: |
On-shore wind (ROS code = SQ)
|
Scheme : |
RO
|
Generator ID: |
R00068SQSC
|
Capacity: |
4999
|
Status: |
Live
|
Accreditation Date: |
4/28/2000
|
|
|
Commission Date: |
5/1/2007
|
|
|
Applicant: |
RES Ltd
|
Applicant Address: |
Beaufort Court
Egg Farm Lane
Kings Langley
WD4 8LR
England
|
Address: |
Forss Wind Farm Phase 2
Forss Wind FarmEx US Navy communications BaseF
Scotland
|
Site Name: |
Forss Wind Farm Phase 2
|
Generator Type: |
Wind
|
Scheme : |
REGO
|
Generator ID: |
G01127NWSC
|
Capacity: |
4999
|
Status: |
Live
|
Accreditation Date: |
4/28/2000
|
|
|
Commission Date: |
5/1/2007
|
|
|
Applicant: |
RES Ltd
|
Applicant Address: |
Beaufort Court
Egg Farm Lane
Kings Langley
WD4 8LR
England
|
Address: |
Forss Wind Farm Phase 2
Forss Wind FarmEx US Navy communications BaseF
Scotland
|
|
Assumptions: Capacity: 4999kW 4.999 MW, Thus over the month Capacity * 720 hours per month = 3599.28 MWh
|
Output Period |
LECs Issued |
ROCs Issued |
REGO Certs |
Capacity Factor |
Status |
01/03/2018 | | | 1710 | 34.21% | Issued | 01/02/2018 | | | 1531 | 30.63% | Issued | 01/01/2018 | | | 1863 | 37.27% | Issued | 01/12/2017 | | | 1215 | 24.30% | Issued | 01/12/2017 | | | 697 | 13.94% | Issued | 01/11/2017 | | | 2428 | 48.57% | Issued | 01/10/2017 | | | 1857 | 37.15% | Issued | 01/09/2017 | | | 1134 | 22.68% | Issued | 01/08/2017 | | | 967 | 19.34% | Issued | 01/07/2017 | | | 918 | 18.36% | Issued | 01/06/2017 | | | 1163 | 23.26% | Issued | 01/05/2017 | | | 1076 | 21.52% | Issued | 01/04/2017 | | | 2050 | 41.01% | Issued | 01/03/2017 | | | 1501 | 30.03% | Redeemed | 01/02/2017 | | | 1592 | 31.85% | Redeemed | 01/01/2017 | | | 1816 | 36.33% | Redeemed | Dec-16 | 0 | 1816 | 1816 | 36.33% | Issued | Nov-16 | 0 | 1672 | 1672 | 33.45% | Issued | Oct-16 | 0 | 1265 | 1265 | 25.31% | Issued | Sep-16 | 0 | 1187 | 1187 | 23.74% | Issued | Aug-16 | 0 | 1127 | 1127 | 22.54% | Issued | Jul-16 | 0 | 817 | 817 | 16.34% | Issued | Jun-16 | 0 | 786 | 786 | 15.72% | Issued | Jun-16 | 0 | 786 | 786 | 15.72% | Issued | May-16 | 0 | 973 | 973 | 19.46% | Issued | Apr-16 | 0 | 1580 | 1580 | 31.61% | Issued | Mar-16 | 0 | 1237 | 1237 | 24.74% | Redeemed | Feb-16 | 0 | 1834 | 1834 | 36.69% | Redeemed | Jan-16 | 0 | 2048 | 1328 | 26.57% | Redeemed | Dec-15 | 0 | 2163 | 2163 | 43.27% | Redeemed | Nov-15 | 0 | 1877 | 1877 | 37.55% | Redeemed | Oct-15 | 0 | 1328 | 1328 | 26.57% | Redeemed | Sep-15 | 0 | 1060 | 1060 | 21.20% | Redeemed | Aug-15 | 0 | 725 | 725 | 14.50% | Redeemed | Jul-15 | 808 | 808 | 808 | 16.16% | Redeemed | Jun-15 | 808 | 808 | 808 | 16.16% | Redeemed | May-15 | 1234 | 1235 | 1235 | 24.70% | Redeemed | Apr-15 | 708 | 703 | 707 | 14.14% | Redeemed | Mar-15 | 939 | 939 | 939 | 18.78% | Redeemed | Feb-15 | 1076 | 1076 | 1076 | 21.52% | Redeemed | Jan-15 | 1129 | 1129 | 1129 | 22.58% | Redeemed | Dec-14 | 1041 | 1041 | 1041 | 20.82% | Redeemed | Nov-14 | 1457 | 1457 | 1457 | 29.15% | Redeemed | Oct-14 | 1700 | 1700 | 1700 | 34.01% | Redeemed | Sep-14 | 851 | 846 | 851 | 17.02% | Redeemed | Aug-14 | 1494 | 1494 | 1494 | 29.89% | Redeemed | Jul-14 | 777 | 771 | 777 | 15.54% | Redeemed | Jun-14 | 576 | 570 | 575 | 11.50% | Redeemed | May-14 | 751 | 746 | 752 | 15.04% | Redeemed | Apr-14 | 1449 | 1449 | 1449 | 28.99% | Redeemed | Mar-14 | 1929 | 1929 | 1929 | 38.59% | Redeemed | Feb-14 | 2005 | 2006 | 2006 | 40.13% | Redeemed | Jan-14 | 1611 | 1611 | 1611 | 32.23% | Redeemed | Dec-13 | 2343 | 2343 | 2342 | 46.85% | Redeemed | Nov-13 | 2159 | 2159 | 2159 | 43.19% | Redeemed | Oct-13 | 1435 | 1434 | 65 | 1.30% | Revoked | Sep-13 | 1373 | 1374 | 1 | 0.02% | Redeemed | Aug-13 | 945 | 940 | 945 | 18.90% | Redeemed | Jul-13 | 903 | 897 | 903 | 18.06% | Redeemed | Jun-13 | 515 | 509 | 515 | 10.30% | Redeemed | May-13 | 1262 | 1262 | 1262 | 25.25% | Redeemed | Apr-13 | 1448 | 1448 | 1448 | 28.97% | Redeemed | Mar-13 | 1395 | 1395 | 1395 | 27.91% | Redeemed | Feb-13 | 1341 | 1340 | 1340 | 26.81% | Redeemed | Jan-13 | 1805 | 1806 | 1806 | 36.13% | Redeemed | Dec-12 | 1928 | 1928 | 1928 | 38.57% | Redeemed | Nov-12 | 1572 | 1571 | 1571 | 31.43% | Redeemed | Oct-12 | 1499 | 1499 | 1499 | 29.99% | Redeemed | Sep-12 | 2030 | 2031 | 2031 | 40.63% | Redeemed | Aug-12 | 680 | 675 | 680 | 13.60% | Redeemed | Jul-12 | 664 | 660 | 664 | 13.28% | Redeemed | Jun-12 | 994 | 994 | 994 | 19.88% | Redeemed | May-12 | 1177 | 1177 | 1177 | 23.54% | Redeemed | Apr-12 | 1195 | 1195 | 1195 | 23.90% | Redeemed | Mar-12 | 1814 | 1814 | 1814 | 36.29% | Redeemed | Feb-12 | 2014 | 2014 | 2014 | 40.29% | Redeemed | Jan-12 | 2174 | 2174 | 2174 | 43.49% | Redeemed | Dec-11 | 2158 | 2158 | 2158 | 43.17% | Redeemed | Nov-11 | 2078 | 2078 | 2078 | 41.57% | Redeemed | Oct-11 | 2067 | 2067 | 2067 | 41.35% | Redeemed | Sep-11 | 1416 | 1416 | 1416 | 28.33% | Redeemed | Aug-11 | 1183 | 1183 | 1183 | 23.66% | Redeemed | Jul-11 | 1012 | 1012 | 1012 | 20.24% | Redeemed | Jun-11 | 731 | 731 | 731 | 14.62% | Redeemed | May-11 | 1773 | 1773 | 1773 | 35.47% | Redeemed | Apr-11 | 1382 | 1382 | 1382 | 27.65% | Redeemed | Mar-11 | 1646 | 1646 | 1646 | 32.93% | Redeemed | Feb-11 | 1929 | 1929 | 1929 | 38.59% | Redeemed | Jan-11 | 1766 | 1766 | 1766 | 35.33% | Redeemed | Dec-10 | 1471 | 1471 | 1471 | 29.43% | Redeemed | Nov-10 | 1510 | 1510 | 1510 | 30.21% | Redeemed | Oct-10 | 2048 | 2048 | 2048 | 40.97% | Redeemed |
|
Capacity: 19.96 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 25 m/s (55.925 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 4/26/2024 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
FORSS Energy Park
RES: FORSS Wind Fram Extension
Highland councillors refuse wind turbines at FORSS Highland Council's planning review body has opposed a planned extension to a wind farm on a former Cold War base.
Wind farm 'would affect Wick airport' The other farms are at FORSS, Causeymire, Boulfruich, Flexhill, Achairn, Baillie, Camster, Bettyhill, Strathy North, Strathy South, South Shebster, Hill of Lieurary, Burn of Whilk, Stroupster, Bower, Durran, Olgrinmore, Halsary and Wathegar.
|
|
©2018
Simon Mallett |
Latest News Added |
Carn Nicholas Drone footage Date and Time of entry: Tuesday, March 19, 2024 00:00
Carn Nicholas Solar Park The site, developed and constructed by Innova Renewables, was energised earlier this year following the beginning of its construction in May 2022. Date and Time of entry: Tuesday, March 19, 2024 00:00
Dorset Green Dorset Green H2 – South West’s first solar to green hydrogen production plant ready to produce clean, zero emission, green renewable energy Date and Time of entry: Tuesday, March 19, 2024 00:00
Dragon LNG Meadow
Date and Time of entry: Tuesday, March 19, 2024 00:00
Pretoria rd looking towards Ellistown.Solar farm.
Date and Time of entry: Tuesday, March 19, 2024 00:00
|
|
©2017
Simon Mallett |
|