Login
   
Username:
Password:
And what is twelve plus eight : (in words)
 
Site Name: Drain Lane
Generator Type: Photovoltaic
Scheme : REGO Generator ID: G06454PVEN
Capacity: 180 Status: Live
Accreditation Date:    
Commission Date: 6/15/2015    
Applicant: Caldera Asset Management Limited
Applicant Address: Blacktoft Grange Blacktoft Grange Road Sandholme BROUGH HU15 2ZU England
Address: Drain Lane PV Site Blacktoft Grange Sandholme Brough HU15 2ZU England
 
Assumptions: Capacity: 180kW 0.18 MW,
Thus over the month Capacity * 720 hours per month = 129.6 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status
01/10/2016 - 31/10/2016 00 14 7.78% Issued
01/09/2016 - 30/09/2016 00 18 10.00% Issued
01/08/2016 - 31/08/2016 00 27 15.00% Issued
01/07/2016 - 31/07/2016 00 30 16.67% Issued
01/06/2016 - 30/06/2016 00 24 13.33% Issued
May-16 00 30 16.67% Issued
Apr-16 00 26 14.44% Issued
Mar-16 00 19 10.56% Redeemed
Feb-16 00 14 7.78% Redeemed
Jan-16 00 5 2.78% Redeemed
Dec-15 00 4 2.22% Redeemed
Nov-15 00 6 3.33% Redeemed
Oct-15 00 11 6.11% Redeemed
Sep-15 00 23 12.78% Redeemed
Aug-15 00 26 14.44% Redeemed
Jul-15 270 27 15.00% Redeemed
Jun-15 70 7 3.89% Redeemed

 

How do I Subscribe?  

What type of data, use etc :

Name, Company Name and email

Before submitting, please enter this code
.access code

All letters to be entered as lower case: