Login
   
Username:
Password:
And what is twelve plus eight : (in words)
 
Site Name: Winchester Biomass CHP
Generator Type: Biomass (e.g. Plant or animal matter)
Scheme : REGO Generator ID: G01886BWEN
Capacity: 350 Status: Live
Accreditation Date:    
Commission Date: 3/31/2017    
Applicant: Brooke Energy (Winchester) Limited
Applicant Address: Jewells Farm Hemyock CULLOMPTON EX15 3PX England
Address: Brooke Energy Winchester Biomass CHP Four Dells Farm, Poles Lane, Otterbourne Winchester SO21 2DY England
 
Assumptions: Capacity: 350kW 0.35 MW,
Thus over the month Capacity * 720 hours per month = 252 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status
01/04/2018 70 20.00% Issued
01/03/2018 150 42.86% Issued
01/02/2018 132 37.71% Issued
01/01/2018 86 24.57% Issued
01/12/2017 140 40.00% Issued
01/11/2017 125 35.71% Issued
01/10/2017 147 42.00% Issued
01/09/2017 140 40.00% Issued
01/08/2017 68 19.43% Issued
01/07/2017 34 9.71% Issued
01/06/2017 64 18.29% Issued

 

How do I Subscribe?  

What type of data, use etc :

Name, Company Name and email

Before submitting, please enter this code
.access code

All letters to be entered as lower case: