Welbeck Solar Farm

Subscribers see an interactive map with Welbeck Solar Farm and local projects displayed.

( Subscribe for £100 )to have full access to all Solar projects and details.


Subscribe to Solar for exact generator location including nearby generators
For an example of a solar project see: Lenham Solar Farm


Subscribe for £500 to include full csv and KML downloads of all Solar project data.

To create a login account see: User Registration. This will allow 30 page views each session rather than 5

One subscription covers your organisation / school / university / company . NOT per user

Welbeck Solar Farm (Solar , Active)

 General Information.

Location in the UK : England, Nottinghamshire S80 3BP    
Type of installation: Solar    on/offshore: on
Solar Panels :0  Capacity : 16 MW
Approx Date of 1st power generation: March 2015

/YES

 Comment

Solar century / Magnetar Solar Operational
Applicant: Solar Century Holdings Ltd
Proposal: Proposed 16MW Solar Farm (32.3 Hectares) and Associated Works Including Inverter
Housings, Access Tracks, Security Fencing and Cameras
Location: Hazel Gap Solar Farm, Land to the South of Forge Lodge, Carburton Road, Norton, Notts

53.2438, -1.1105

 Address

Land To The South Of Forge Lodge, Carburton Road, Norton

 Associated Companies.

Relationship Company (For: Welbeck )
OperatorMagnetar
DeveloperSolarcentury

 DECC Data on this Project: Welbeck :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Welbeck Solar / Hazel Gap     16 MW
Energy Type: Solar Photovoltaics
County: Nottinghamshire     Country: England     LPA: Bassetlaw District Council
Site ID and Reference: 2260 / C3373     District:
Applicant: Solar century / Magnetar Solar     Application : 14/01030/FUL (Go to search to find Application)
--- For Solar Farms / Parks ---
Mounting of panels: Ground
--- ----- ---- ---
Site Address: Land To The South Of Forge Lodge, Carburton Road, Norton
  S80 3BP
County: Nottinghamshire Region: East Midlands
OS Coordinates: 459630 / 459630
Development Status: Operational
Application Submitted: 8/14/2014 Planning Permission Granted
Application Determined: Permission refused:
Construction Date: 1/10/2015    
Generator Live 3/19/2015 This Record Last Updated: 8/3/2015
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date: 1/9/2018    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Welbeck: Solar :

Site Name: Welbeck Solar
Generator Type: Photovoltaic (RO code = RU)
Scheme : RO Generator ID: R00446RUEN
Capacity: 11840 Status: Live
Accreditation Date: 8/14/2014    
Commission Date: 3/16/2015    
Applicant: Perpetual Power (UK) Limited
Applicant Address: C/O Quintas Energy UK Ltd Suite C, 3rd Floor, 3 Harbour Exchange Square, London E14 9GE England
Address: Welbeck Hazel Limited Welbeck Estates Carburton S80 3BP England

Site Name: Welbeck Solar
Generator Type: Photovoltaic
Scheme : REGO Generator ID: G06024PVEN
Capacity: 11840 Status: Live
Accreditation Date: 8/14/2014    
Commission Date: 3/16/2015    
Applicant: Perpetual Power (UK) Limited
Applicant Address: C/O Quintas Energy UK Ltd Suite C, 3rd Floor, 3 Harbour Exchange Square, London E14 9GE England
Address: Welbeck Hazel Limited Welbeck Estates Carburton S80 3BP England
 
Assumptions: Capacity: 11840kW 11.84 MW,
Thus over the month Capacity * 720 hours per month = 8524.8 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status
01/03/2018 872 7.36% Issued
01/02/2018 725 6.12% Issued
01/01/2018 192 1.62% Issued
01/12/2017 288 2.43% Issued
01/11/2017 413 3.49% Issued
01/10/2017 770 6.50% Issued
01/09/2017 1229 10.38% Issued
01/08/2017 1833 15.48% Issued
01/07/2017 1949 16.46% Issued
01/06/2017 1839 15.53% Issued
01/05/2017 1967 16.61% Issued
01/04/2017 1700 14.36% Issued
01/03/2017 1354 11.44% Redeemed
01/02/2017 566 4.78% Redeemed
01/01/2017 315 2.66% Redeemed
Dec-16 0378 282 2.38% Issued
Nov-16 0666 486 4.10% Issued
Oct-16 01318 951 8.03% Issued
Sep-16 01842 1324 11.18% Issued
Aug-16 02776 1983 16.75% Issued
Jul-16 02806 2004 16.93% Issued
Jun-16 02405 1718 14.51% Issued
Jun-16 02405 1718 14.51% Issued
May-16 02864 2046 17.28% Issued
Apr-16 02349 1678 14.17% Issued
Mar-16 01649 1187 10.03% Retired
Feb-16 01234 891 7.53% Retired
Dec-15 0329 247 2.09% Retired
Nov-15 0484 356 3.01% Retired
Oct-15 01130 817 6.90% Retired
Sep-15 02082 1495 12.63% Retired
Aug-15 02221 1586 13.40% Retired
Jul-15 17582461 1758 14.85% Redeemed
Jun-15 19522732 1952 16.49% Redeemed
May-15 20222832 2023 17.09% Redeemed
Apr-15 19492728 1948 16.45% Redeemed
Mar-15 482670 482 4.07% Expired

Project Info
WELBECK Solar Farm Developments
A 32-acre solar farm at Hunciecroft will generate 7.5MW of low carbon electricity; sufficient energy to power 2,150 homes in the local area. The 70-acre site at Hazel Gap will produce 16MW of solar power,

Harworth Estates partners with Anesco to install 30MW of solar
Construction has already begun on the first project in the portfolio, an 11.2MW solar farm at the WELBECK Colliery in Mansfield. Following its completion, work will begin on two 5.74MW projects at Gedling and Blisthorpe.

Anesco poised to transform former collieries with 30MW solar array
The project will begin with the development of three sites in Nottinghamshire: WELBECK Colliery in Mansfield, Gedling in Lambley and a third site in Bilsthorpe. A fourth site at Askern in South Yorkshire is awaiting planning consent.

©2018 Simon Mallett
Latest News Added
Carn Nicholas
Drone footage
Date and Time of entry: Tuesday, March 19, 2024 00:00

Carn Nicholas Solar Park
The site, developed and constructed by Innova Renewables, was energised earlier this year following the beginning of its construction in May 2022.
Date and Time of entry: Tuesday, March 19, 2024 00:00

Dorset Green
Dorset Green H2 – South West’s first solar to green hydrogen production plant ready to produce clean, zero emission, green renewable energy
Date and Time of entry: Tuesday, March 19, 2024 00:00

Dragon LNG Meadow

Date and Time of entry: Tuesday, March 19, 2024 00:00

Pretoria rd looking towards Ellistown.Solar farm.

Date and Time of entry: Tuesday, March 19, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School