Sorry I found no matches, Please try again. 176
vid = 3694pws_id = 354060pws_id = 354060 Sorry I found no matches, Please try again.

--------------------------------------------------------
(825) Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 3.22.119.251 {832) YESU WSHW: 1/10
Loading
Page views this IP this session = 1 of 10 unsubscribed pages

Chalgrove Solar Farm

Subscribers see an interactive map with Chalgrove Solar Farm and local projects displayed.

( Subscribe for £100 )to have full access to all Solar projects and details.


Subscribe to Solar for exact generator location including nearby generators
For an example of a solar project see: Lenham Solar Farm


Subscribe for £500 to include full csv and KML downloads of all Solar project data.

To create a login account see: User Registration. This will allow 30 page views each session rather than 5

One subscription covers your organisation / school / university / company . NOT per user

Chalgrove Solar Farm (Solar , Active)

 General Information.

Location in the UK : England, Oxfordshire OX44 7RW    
Type of installation: Solar    on/offshore: on
Solar Panels :0  Capacity : 21.3 MW
Acreage:125   or approx Hectares : 50
Approx Date of 1st power generation: March 2015

/YES

 Comment

Chalgrove Solar Operational

 Address

Part of Easington Farm near Monument Business Park Chalgrove

 Associated Companies.

Relationship Company (For: Chalgrove )
ContractorArmstrong Energy
DeveloperLark Energy

 DECC Data on this Project: Chalgrove :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Easington Farm (Chalgrove)     21.3 MW
Energy Type: Solar Photovoltaics
County: Oxfordshire     Country: England     LPA: South Oxfordshire District Council
Site ID and Reference: 2333 / C3031     District:
Applicant: Chalgrove Solar     Application : P14/S1734/FUL (Go to search to find Application)
--- For Solar Farms / Parks ---
Mounting of panels: Ground
--- ----- ---- ---
Site Address: Part of Easington Farm near Monument Business Park Chalgrove
  OX44 7RW
County: Oxfordshire Region: South East
OS Coordinates: 465126 / 465126
Development Status: Operational
Application Submitted: 6/3/2014 Planning Permission Granted
Application Determined: Permission refused:
Construction Date: 1/19/2015    
Generator Live 3/17/2015 This Record Last Updated: 5/6/2015
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Chalgrove: Solar :

Site Name: Chalgrove Solar Farm
Generator Type: Photovoltaic (RO code = RU)
Scheme : RO Generator ID: R00536RUEN
Capacity: 17000 Status: Live
Accreditation Date: 6/3/2014    
Commission Date: 3/27/2015    
Applicant: Chalgrove Solar Limited
Applicant Address: 3rd Floor 141-145 Curtain Road London EC2A 3BX England
Address: Land at Nixey Farm Easington Watlington ox49 5az England

Site Name: Chalgrove Solar Farm
Generator Type: Photovoltaic (RO code = RU)
Scheme : RO Generator ID: R00536RUEN
Capacity: 17000 Status: Live
Accreditation Date: 6/3/2014    
Commission Date: 3/27/2015    
Applicant: Chalgrove Solar Limited
Applicant Address: 3rd Floor 141-145 Curtain Road London EC2A 3BX England
Address: Land at Nixey Farm Easington Watlington ox49 5az England

Site Name: Chalgrove Solar Farm
Generator Type: Photovoltaic
Scheme : REGO Generator ID: G06240PVEN
Capacity: 17000 Status: Live
Accreditation Date: 6/3/2014    
Commission Date: 3/27/2015    
Applicant: Chalgrove Solar Limited
Applicant Address: 3rd Floor 141-145 Curtain Road London EC2A 3BX England
Address: Land at Nixey Farm Easington Watlington ox49 5az England
 
Assumptions: Capacity: 17000kW 17 MW,
Thus over the month Capacity * 720 hours per month = 12240 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status
01/02/2018 1232 7.25% Issued
01/01/2018 570 3.35% Issued
01/12/2017 360 2.12% Issued
01/11/2017 637 3.75% Issued
01/10/2017 1128 6.64% Issued
01/09/2017 1692 9.95% Issued
01/08/2017 2179 12.82% Issued
01/07/2017 2378 13.99% Issued
01/06/2017 2707 15.92% Issued
01/05/2017 2533 14.90% Issued
01/04/2017 2484 14.61% Issued
01/03/2017 708 4.16% Revoked
01/03/2017 1776 10.45% Redeemed
01/02/2017 774 4.55% Redeemed
01/01/2017 669 3.94% Redeemed
Dec-16 0662 498 2.93% Issued
Nov-16 0998 736 4.33% Issued
Oct-16 01780 1290 7.59% Issued
Sep-16 02073 1496 8.80% Issued
Aug-16 03521 2531 14.89% Issued
Jul-16 03764 2689 15.82% Issued
Jul-16 03764 2689 15.82% Issued
Jun-16 02916 2095 12.32% Issued
May-16 03732 2666 15.68% Issued
Apr-16 03094 2225 13.09% Issued
Mar-16 02345 1693 9.96% Redeemed
Feb-16 01571 1142 6.72% Redeemed
Jan-16 0773 506 2.98% Redeemed
Dec-15 0471 361 2.12% Retired
Nov-15 0630 472 2.78% Retired
Oct-15 01554 1131 6.65% Retired
Sep-15 02437 1756 10.33% Retired
Aug-15 02726 1963 11.55% Retired
Jul-15 23203229 2319 13.64% Redeemed
Jun-15 16402285 1 0.01% Redeemed
May-15 635882 315 1.85% Redeemed
Apr-15 17612443 1761 10.36% Redeemed
Mar-15 5070 51 0.30% Expired

Project Info
Armstrong Energy: CHALGROVE SOLAR FARM

22MW CHALGROVE Solar Farm hit by fire
Oxfordshire Fire and Rescue Service was called to an incident at the farm, located in Easington near Watlington, on Friday afternoon after reports of an “intense blaze”.

Solar farm will be size of 75 football pitches
The John Phillips Planning Consultancy, based in Hinksey Hill, is planning to build the power plant on 54 hectares of fields behind Monument Business Park in CHALGROVE.

©2018 Simon Mallett
Latest News Added
Carn Nicholas
Drone footage
Date and Time of entry: Tuesday, March 19, 2024 00:00

Carn Nicholas Solar Park
The site, developed and constructed by Innova Renewables, was energised earlier this year following the beginning of its construction in May 2022.
Date and Time of entry: Tuesday, March 19, 2024 00:00

Dorset Green
Dorset Green H2 – South West’s first solar to green hydrogen production plant ready to produce clean, zero emission, green renewable energy
Date and Time of entry: Tuesday, March 19, 2024 00:00

Dragon LNG Meadow

Date and Time of entry: Tuesday, March 19, 2024 00:00

Pretoria rd looking towards Ellistown.Solar farm.

Date and Time of entry: Tuesday, March 19, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School