Loading
Page views this IP this session = 1 of 10 unsubscribed pagesBurton Pedwardine Solar Farm
Subscribers see an interactive map with Burton Pedwardine Solar Farm and local projects displayed.
( Subscribe for £100 )to have full access to all Solar projects and details.
Subscribe to Solar for exact generator location including nearby generators
For an example of a solar project see: Lenham Solar Farm
Subscribe for £500 to include full csv and KML downloads of all Solar project data.
To create a login account see: User Registration. This will allow 30 page views each session rather than 5
One subscription covers your organisation / school / university / company . NOT per user
|
Burton Pedwardine Solar Farm (Solar , Active) Location in the UK : England, NG34 0DB Type of installation: Solar on/offshore: on Solar Panels :180000 Capacity : 13 MW Approx Date of 1st power generation: March 2014
/YES
The solar park uses LDK PV modules for a total peak capacity of 13 MW connected to the local 33kV distribution network.
The plant has been operational since March 2014. Lark Energy was the EPC contractor. The project has a 25-year site lease and planning permission in place for an equivalent period. Grange Farm Asgarby Road Burton Pedwardine Sleaford NG34 0DB England
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Grange Farm (Burton Pedwardine) 15 MW
|
Energy Type: |
Solar Photovoltaics |
County: |
Lincolnshire Country: England LPA: North Kesteven District Council
|
Site ID and Reference: |
1755 / AA978
District:
|
Applicant: |
Lark Energy
Application :
12/1242/FUL
|
(Go to search to find Application) |
|
--- For Solar Farms / Parks --- |
Mounting of panels: |
Ground |
|
|
|
--- ----- ---- --- |
Site Address: |
Asgarby Road, Burton Pedwardine, Lincoln
|
|
|
County: |
Lincolnshire Region: East Midlands
|
OS Coordinates: |
510532 / 510532
|
Development Status: |
Operational
|
Application Submitted: |
11/27/2012
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
6/10/2013
|
|
|
Generator Live |
4/30/2014
|
This Record Last Updated: |
6/10/2014
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Burton Pedwardine
|
Generator Type: |
Photovoltaic (RO code = RU)
|
Scheme : |
RO
|
Generator ID: |
R00201RUEN
|
Capacity: |
7500
|
Status: |
Live
|
Accreditation Date: |
11/27/2012
|
|
|
Commission Date: |
12/30/2013
|
|
|
Applicant: |
Lambridge Solar Limited
|
Applicant Address: |
3rd Floor
141-145 Curtain Road
London
EC2A 3BX
England
|
Address: |
Grange Farm
Asgarby Road
Burton Pedwardine
Sleaford
NG34 0DB
England
|
Project Info |
Grange Farm Location Map
Lark Energy to build 100 MW of solar PV farms in the U.K. Broxted, at the site of the former RAF Stradishall, with 35 MW , Ellough, with 14 MW. South Creake in Suffolk (26 MW), Thornham in Norfolk (15 MW) and BURTON PEDWARDINE in Lincolnshire (15 MW).
Armstrong Energy: BURTON PEDWARDINE SOLAR PARK
Lark Energy and Armstrong Energy partner to construct 30MW of solar farms The three solar farms are a 5.7MW development in Bourne, Lincolnshire; 14MW solar farm in BURTON PEDWARDINE, Lincolnshire and a 9MW array at Hansen Cement’s Ketton Works in Rutland.
Plan for solar farm at BURTON PEDWARDINE approved Lark Energy Ltd have applied to North Kesteven District Council’s planning committee to turn land at Grange Farm, on Asgarby Road in BURTON PEDWARDINE, into a solar farm with enough panels to power over 3,000 homes.
|
|
©2018
Simon Mallett |
Latest News Added |
Carn Nicholas Drone footage Date and Time of entry: Tuesday, March 19, 2024 00:00
Carn Nicholas Solar Park The site, developed and constructed by Innova Renewables, was energised earlier this year following the beginning of its construction in May 2022. Date and Time of entry: Tuesday, March 19, 2024 00:00
Dorset Green Dorset Green H2 – South West’s first solar to green hydrogen production plant ready to produce clean, zero emission, green renewable energy Date and Time of entry: Tuesday, March 19, 2024 00:00
Dragon LNG Meadow
Date and Time of entry: Tuesday, March 19, 2024 00:00
Pretoria rd looking towards Ellistown.Solar farm.
Date and Time of entry: Tuesday, March 19, 2024 00:00
|
|
©2017
Simon Mallett |
|