Barlockhart Moor Wind Farm

Click here for Generation Forecast for wind farms based on Met office data
DECC / 4491 : BARLOCKHART MOOR - extension; 8.2; Planning Permission Expired
DECC / 4435 : Barlockhart Moor; 8.1; Operational
OFGem / RO : R00213SQSC; Barlockhart Moor Wind Energy Limited; 8.12MW

Barlockhart Moor Wind Farm (Wind , Active)

 General Information.

Location in the UK : Scotland, Glenluce    
Type of installation: Wind    on/offshore: on
Turbines :4  Capacity : 8 MW
Approx Date of 1st power generation: August 2013

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

4 Turbines are agreed and being built (late 2013) and will supplly Approx 8 MW capacity. And additional 4 Turbines are proposed which would add 8 more MW Capacity

At this preliminary stage, the wind farm is expected to comprise of four wind turbines, each with a maximum hub height of 60m and a vertical blade tip height of up to 102m. Each turbine will have an installed capacity of between 2 and 2.5 megawatts (MW).

 Turbine Make and Specs

Model: Senvion MM92 Start Speed: 4
Capacity: 2 Optimal Speed: 12
Rotor Diameter: 92 Stop Speed: 25
Hub Height 70   Avg for all turbines:70 Avg. Elevation: 71
Web Page: http://www.repower.de/wind-power-solutions/wind-turbines/5m/
Comment: The reliable gearbox and generator technology of the MM82 is also the basis for the MM92 wind power plants.

 Address

Barlockhart Moor Wind Farm Barlockhart Moor Glenluce DG8 0JQ Scotland

 Associated Companies.

Relationship Company (For: Barlockhart Moor )
DeveloperWest Coast Energy Ltd
OwnerWest Coast Energy Ltd

 DECC Data on this Project: Barlockhart Moor :4435

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: BARLOCKHART MOOR - extension     8.2 MW
Energy Type: Wind Onshore
County: Dumfries and Galloway     Country: Scotland     LPA: Dumfries and Galloway Council
Site ID and Reference: 4491 / C2438     District:
Applicant: West Coast Energy     Application : 13/P/1/0136 (Go to search to find Application)
For Wind Farms  
Number of Turbines: 4 Turbine Capacity: 2.1000000000000001
Height of Turbines: Calculated capacity: 8.4
Site Address: BARLOCKHART MOOR, GLENLUCE
 
County: Dumfries and Galloway Region: Scotland
OS Coordinates: 222700 / 222700
Development Status: Planning Permission Expired
Application Submitted: 3/25/2013 Planning Permission Granted
Application Determined: Permission refused:
Construction Date:    
Generator Live This Record Last Updated: 3/11/2020
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date: 5/21/2021    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

Site Name: Barlockhart Moor     8.1 MW
Energy Type: Wind Onshore
County: Dumfries and Galloway     Country: Scotland     LPA: Dumfries and Galloway Council
Site ID and Reference: 4435 / A0259     District:
Applicant: West Coast Energy     Application : 08/P/1/0202 (Go to search to find Application)
For Wind Farms  
Number of Turbines: 4 Turbine Capacity: 2.0299999999999998
Height of Turbines: Calculated capacity: 8.12
Site Address: Barlockhart Farm, Glenluce, Newton Stewart, Wigtownshire DG8 0JG
 
County: Dumfries and Galloway Region: Scotland
OS Coordinates: 221183 / 221183
Development Status: Operational
Application Submitted: 8/28/2008 Planning Permission Granted
Application Determined: Permission refused: 7/3/2009
Construction Date:    
Generator Live 8/27/2013 This Record Last Updated: 9/25/2014
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted: 7/3/2009

 OFGEM Data on this Project: Barlockhart Moor: Wind : R00213SQSC

Site Name: Barlockhart Moor Wind Energy Limited
Generator Type: On-shore wind (ROS code = SQ)
Scheme : RO Generator ID: R00213SQSC
Capacity: 8120 Status: Live
Accreditation Date: 8/28/2008    
Commission Date: 8/27/2013    
Applicant: Barlockhart Moor Wind Energy Ltd
Applicant Address: Barlockhart Moor Wind Farm Barlockhart Moor Glenluce DG8 0JQ Scotland
Address: Barlockhart Moor Wind Farm Barlockhart Moor Glenluce DG8 0JQ Scotland

 Calculations


Capacity: 16
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 25 m/s (55.925 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 4/26/2024
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 16 start: 5 Optimum: 15/ Stop: 25 / wind: / ratio 352768

Project Info
West Coast Energy Limited

BARLOCKHART MOOR Wind Farm

BARLOCKHART MOOR Wind Farm Extension

REpower has signed five new contracts for the UK with a total capacity of 66MW
The company will supply five MM82 turbines, for Wathegar wind farm in Caithness, as well as six MM92 turbines for the Blantyre Muir wind farm in South Lanarkshire and four MM92 turbines for BARLOCKHART MOOR wind farm

©2018 Simon Mallett
Latest News Added
Carn Nicholas
Drone footage
Date and Time of entry: Tuesday, March 19, 2024 00:00

Carn Nicholas Solar Park
The site, developed and constructed by Innova Renewables, was energised earlier this year following the beginning of its construction in May 2022.
Date and Time of entry: Tuesday, March 19, 2024 00:00

Dorset Green
Dorset Green H2 – South West’s first solar to green hydrogen production plant ready to produce clean, zero emission, green renewable energy
Date and Time of entry: Tuesday, March 19, 2024 00:00

Dragon LNG Meadow

Date and Time of entry: Tuesday, March 19, 2024 00:00

Pretoria rd looking towards Ellistown.Solar farm.

Date and Time of entry: Tuesday, March 19, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School