Barlockhart Moor Wind Farm (Wind , Active) Location in the UK : Scotland, Glenluce Type of installation: Wind on/offshore: on Turbines :4 Capacity : 8 MW Approx Date of 1st power generation: August 2013
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
4 Turbines are agreed and being built (late 2013) and will supplly Approx 8 MW capacity. And additional 4 Turbines are proposed which would add 8 more MW Capacity
At this preliminary stage, the wind farm is expected to comprise of four wind turbines, each with a maximum hub height of 60m and a vertical blade tip height of up to 102m. Each turbine will have an installed capacity of between 2 and 2.5 megawatts (MW).
Model: |
Senvion MM92
|
Start Speed: |
4
|
Capacity: |
2
|
Optimal Speed: |
12
|
Rotor Diameter: |
92
|
Stop Speed: |
25
|
Hub Height |
70 Avg for all turbines:70
|
Avg. Elevation: |
71
|
Web Page: |
http://www.repower.de/wind-power-solutions/wind-turbines/5m/ |
Comment: |
The reliable gearbox and generator technology of the MM82 is also the basis for the MM92 wind power plants.
|
Barlockhart Moor Wind Farm Barlockhart Moor Glenluce DG8 0JQ Scotland
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
BARLOCKHART MOOR - extension 8.2 MW
|
Energy Type: |
Wind Onshore |
County: |
Dumfries and Galloway Country: Scotland LPA: Dumfries and Galloway Council
|
Site ID and Reference: |
4491 / C2438
District:
|
Applicant: |
West Coast Energy
Application :
13/P/1/0136
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
4 |
Turbine Capacity: |
2.1000000000000001 |
Height of Turbines: |
|
Calculated capacity: |
8.4 |
Site Address: |
BARLOCKHART MOOR, GLENLUCE
|
|
|
County: |
Dumfries and Galloway Region: Scotland
|
OS Coordinates: |
222700 / 222700
|
Development Status: |
Planning Permission Expired
|
Application Submitted: |
3/25/2013
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
|
|
|
Generator Live |
|
This Record Last Updated: |
3/11/2020
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
5/21/2021 |
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Barlockhart Moor 8.1 MW
|
Energy Type: |
Wind Onshore |
County: |
Dumfries and Galloway Country: Scotland LPA: Dumfries and Galloway Council
|
Site ID and Reference: |
4435 / A0259
District:
|
Applicant: |
West Coast Energy
Application :
08/P/1/0202
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
4 |
Turbine Capacity: |
2.0299999999999998 |
Height of Turbines: |
|
Calculated capacity: |
8.12 |
Site Address: |
Barlockhart Farm, Glenluce, Newton Stewart, Wigtownshire DG8 0JG
|
|
|
County: |
Dumfries and Galloway Region: Scotland
|
OS Coordinates: |
221183 / 221183
|
Development Status: |
Operational
|
Application Submitted: |
8/28/2008
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
7/3/2009
|
Construction Date: |
|
|
|
Generator Live |
8/27/2013
|
This Record Last Updated: |
9/25/2014
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
7/3/2009 |
Site Name: |
Barlockhart Moor Wind Energy Limited
|
Generator Type: |
On-shore wind (ROS code = SQ)
|
Scheme : |
RO
|
Generator ID: |
R00213SQSC
|
Capacity: |
8120
|
Status: |
Live
|
Accreditation Date: |
8/28/2008
|
|
|
Commission Date: |
8/27/2013
|
|
|
Applicant: |
Barlockhart Moor Wind Energy Ltd
|
Applicant Address: |
Barlockhart Moor Wind Farm
Barlockhart Moor
Glenluce
DG8 0JQ
Scotland
|
Address: |
Barlockhart Moor Wind Farm
Barlockhart Moor
Glenluce
DG8 0JQ
Scotland
|
Capacity: 16 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 25 m/s (55.925 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 4/26/2024 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Carn Nicholas Drone footage Date and Time of entry: Tuesday, March 19, 2024 00:00
Carn Nicholas Solar Park The site, developed and constructed by Innova Renewables, was energised earlier this year following the beginning of its construction in May 2022. Date and Time of entry: Tuesday, March 19, 2024 00:00
Dorset Green Dorset Green H2 – South West’s first solar to green hydrogen production plant ready to produce clean, zero emission, green renewable energy Date and Time of entry: Tuesday, March 19, 2024 00:00
Dragon LNG Meadow
Date and Time of entry: Tuesday, March 19, 2024 00:00
Pretoria rd looking towards Ellistown.Solar farm.
Date and Time of entry: Tuesday, March 19, 2024 00:00
|
|
©2017
Simon Mallett |
|