Site Name: A''Chruach (Phase 2)     4 MW
Energy Type: Wind Onshore
County: Argyll and Bute     Country: Scotland     LPA: Argyll & Bute Council
Site ID and Reference: 4937 /     District:
Applicant: Muirhall Energy (formerly Infinis)     Application : 14/02829/PP (Go to search to find Application)
For Wind Farms  
Number of Turbines: 2 Turbine Capacity: 2
Height of Turbines: 135 Calculated capacity: 4
Site Address: Land 1.5km north of Blackmill Loch adjacent to consented A''Chruach Windfarm, West Of Minard
 
County: Argyll and Bute Region: Scotland
OS Coordinates: 194350 / 194350
Development Status: Planning Permission Expired
Application Submitted: 12/12/2014 Planning Permission Granted
Application Determined: Permission refused:
Construction Date:    
Generator Live This Record Last Updated: 9/23/2020
RO Banding (ROC/MWh) 0.9 FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date: 8/28/2018    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

Caution: Please note that the location is taken directly from the DECC data. It is often based on the postcode so cannot be regarded as accurate. Postcodes used can be some miles, often the farm house location, from the project location. Go direct to Renewables Map Project data for A''Chruach (Phase 2)