Loading
Page views this IP this session = 1 of 10 unsubscribed pagesWeston Energy from Waste Plant
Subscribers see an interactive map with Weston Energy from Waste Plant and local projects displayed.
( Subscribe for £100 )to have full access to all Waste projects and details.
Subscribe to Waste for exact generator location including nearby generators
Subscribe for £500 to include full csv and KML downloads of all Waste project data.
To create a login account see: User Registration. This will allow 30 page views each session rather than 5
One subscription covers your organisation / school / university / company . NOT per user
|
Weston (Waste , Active, aa 1mw or less) Location in the UK : England, Type of installation: Waste on/offshore: on Turbines :0 Capacity : 2 MW Approx Date of 1st power generation: December 2003
/YES
?? Weston Landfill,South of Northampton,(M1 J16)
Relationship |
Company (For:
Weston
) |
Sorry I found no matches, Please try again.
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Weston Landfill Site 2 MW
|
Energy Type: |
Landfill Gas |
County: |
Northamptonshire Country: England LPA: South Northamptonshire Council
|
Site ID and Reference: |
678 / N00116L
District:
|
Applicant: |
Vivid Waste Management
Application :
SN/01/1584C
|
(Go to search to find Application) |
Site Address: |
Weston Landfill,
South of Northampton,
(M1 J16)
|
|
|
County: |
Northamptonshire Region: East Midlands
|
OS Coordinates: |
467080 / 467080
|
Development Status: |
Operational
|
Application Submitted: |
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
|
|
|
Generator Live |
12/31/2003
|
This Record Last Updated: |
7/21/2005
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Project Info |
Plans put forward for new solar farm near Congresbury Renewable energy firm UK Solar Assets has drawn up plans for a 1.3 megawatt solar energy farm on a 2.2-hectare site – more than 20,000 square metres – along the A370 at Pilhay Farm, WESTON Road in Hewish.
(2009) WESTON TURBINES – SAY NO NHDC Planning Control Committee voted unanimously to reject the application following a recommendation by the planning officer to refuse. Further documentation will be posted in due course. It is not known whether the applicant will appeal.
INRG wins permission for 16MW solar farm on former airbase site Aylesbury Vale District Council planners have given approval for the facility, which would extend to 35 hectares at the western end of TurWESTON Airfield near Brackley.
Solar Farm Proposal Clayhill Farm WESTONing The developer, a company called Axiom, set out plans to install a large (19 MW) solar farm covering 36 ha of farmland, which will generate electricity for the grid.
Concern over solar farm application The proposal for 36,000 solar panels to be built in a field at Woodforde Farm, WESTON Longville, has been submitted by British renewable energy company Esconrg. The full size of the development, including converter buildings, would be 19 hectares.
|
|
©2018
Simon Mallett |
Latest News Added |
Carn Nicholas Drone footage Date and Time of entry: Tuesday, March 19, 2024 00:00
Carn Nicholas Solar Park The site, developed and constructed by Innova Renewables, was energised earlier this year following the beginning of its construction in May 2022. Date and Time of entry: Tuesday, March 19, 2024 00:00
Dorset Green Dorset Green H2 – South West’s first solar to green hydrogen production plant ready to produce clean, zero emission, green renewable energy Date and Time of entry: Tuesday, March 19, 2024 00:00
Dragon LNG Meadow
Date and Time of entry: Tuesday, March 19, 2024 00:00
Pretoria rd looking towards Ellistown.Solar farm.
Date and Time of entry: Tuesday, March 19, 2024 00:00
|
|
©2017
Simon Mallett |
|