Loading
Page views this IP this session = 1 of 10 unsubscribed pagesDinorwig
Subscribers see an interactive map with Dinorwig and local projects displayed.
( Subscribe for £100 )to have full access to all Hydro projects and details.
Subscribe to Hydro for exact generator location including nearby generators
Subscribe for £500 to include full csv and KML downloads of all Hydro project data.
To create a login account see: User Registration. This will allow 30 page views each session rather than 5
One subscription covers your organisation / school / university / company . NOT per user
|
Dinorwig (Hydro , Active) Location in the UK : Wales, North Wales, Snowdonia, llanberis Type of installation: Hydro on/offshore: on Turbines :4 Capacity : 1726 MW Approx Date of 1st power generation: 1984
/YES
"Dinorwic" POWER STATION: pumped Storage Scheme When it was fully commissioned in 1984, Dinorwig Power Station was regarded as one of the world's most imaginative engineering and environmental project. The original purpose of the scheme, it is claimed, was to deal with the difficulty that National Grid would have had if the large numbers of nuclear power stations then planned had been built. These are technically and economically inflexible, ideally needing to run at full output all of the time and, effectively, storage capacity was needed for some of the night-time power when the demand for power dropped off. Electric night storage heaters and the Economy 7 tariff fulfill a similar purpose.[1]
Relationship |
Company (For:
Dinorwig
) |
Sorry I found no matches, Please try again.
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Dinorwig 1728 MW
|
Energy Type: |
Pumped Storage Hydroelectricity |
County: |
Conwy Country: Wales LPA: Snowdonia National Park Authority
|
Site ID and Reference: |
6839 /
District:
|
Applicant: |
First Hydro Company
Application :
|
(Go to search to find Application) |
Site Address: |
Snowdonia
|
|
LL55 4TY
|
County: |
Conwy Region: Wales
|
OS Coordinates: |
258627 / 258627
|
Development Status: |
Operational
|
Application Submitted: |
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
1/1/1978
|
|
|
Generator Live |
1/1/1983
|
This Record Last Updated: |
10/23/2018
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Carn Nicholas Drone footage Date and Time of entry: Tuesday, March 19, 2024 00:00
Carn Nicholas Solar Park The site, developed and constructed by Innova Renewables, was energised earlier this year following the beginning of its construction in May 2022. Date and Time of entry: Tuesday, March 19, 2024 00:00
Dorset Green Dorset Green H2 – South West’s first solar to green hydrogen production plant ready to produce clean, zero emission, green renewable energy Date and Time of entry: Tuesday, March 19, 2024 00:00
Dragon LNG Meadow
Date and Time of entry: Tuesday, March 19, 2024 00:00
Pretoria rd looking towards Ellistown.Solar farm.
Date and Time of entry: Tuesday, March 19, 2024 00:00
|
|
©2017
Simon Mallett |
|