Header Area Not Logged on, Max pages: 5( Seen ) ID:3952 Ind:1
- 5 - YESYESU WSHW: /5

the renewable exchange
Loading
Page views this IP this session = of 5 unsubscribed pages

Warmwell Energy from Waste Plant

Cansee = YES

Subscribers see an interactive map with Warmwell Energy from Waste Plant and local projects displayed.

Subscribe for 100 to have full access to all Waste projects and details.


Subscribe to Waste for exact generator location including nearby generators

Subscribe for 500 to include full csv downloads of all Waste project data.

To create a login account see: User Registration. This will allow 30 page views each session rather than 5

One subscription covers your organisation / school / university / company . NOT per user

Warmwell (Waste , Active, Waste - Landfill Gas)

 General Information.

Location in the UK : England, DT2 8HU    
Type of installation: Waste    on/offshore: on
Turbines :0  Capacity : 2 MW
Approx Date of 1st power generation: April 2010

/YES

 Comment

 Address

Subscribed version includes full address details of project site

 Associated Companies.

Subscribed version includes associated companies along with address and other contact details, also link to company and crossreference to their projects (still being populated, 90% complete for Solar projects)
Subscriber Register

 DECC Data on this Project: Warmwell DECC Reference:

Subscribed version includes access to DECC data where it exists for this project.
Also facility to include a mix of DECC data within csv downloads

Subscriber Register

 OFGEM Data on this Project: Warmwell : Waste OFGEM Reference:

Subscribed version includes access to OFGEM data where it exists for this project.
Also facility to include a mix of OFGEM data within csv downloads

Subscriber Register

 Any Comment (New: Uses Disqus)

comments powered by Disqus

Project Info
Councillors give solar plan permission
THE FUTURE is bright for a solar farm at WARMWELL after it received planning permission from councillors.

©2017 Simon Mallett

Latest News Added
Decoy Farm AD Plant
SES Contracting were awarded the construction of a new 2.8mw Anaerobic Digestion plant at Decoy Farm, Crowland near Peterborough.
Source: ses group, Date and Time of entry: 16 August 2017 00:00

FAIR HEAD TIDAL TO REVEAL LATEST PLANS TO BALLYCASTLE AND RATHLIN COMMUNITIES
The renewable energy firm behind proposals to install a tidal generation scheme off Fair Head is to host two open days to gather opinions and share information with local communities.
Source: dpenergy, Date and Time of entry: 10 August 2017 00:00

Fair Head Tidal goes ahead with planning submission
Fair Head Tidal has lodged a planning application for permission to build tidal turbines on the seabed and associated infrastructure to bring the power ashore.
Source: irishnews, Date and Time of entry: 10 August 2017 00:00

Gruggandoo Wind Farm April 2017
The proposed scheme would have an installed capacity of 39.6MW, comprising 12 turbines, each with a maximum blade tip height of 125m and a hub height of 75m. Access to the site will be taken from Mullgahgarriff Road for all turbines.
Source: abo, Date and Time of entry: 02 August 2017 00:00

PLANNING APPROVAL UNANIMOUSLY GIVEN FOR CROSSDYKES WIND FARM
At a meeting of the Planning Applications Committee on Tuesday 24th May, Councillors gave their unanimous backing to the 15 turbine wind farm, proposed by Muirhall Energy.
Source: muirhall, Date and Time of entry: 02 August 2017 00:00

©2017 Simon Mallett