Loading
Page views this IP this session = 1 of 10 unsubscribed pagesCarno Wind Farm
Click here for Generation Forecast for wind farms based on Met office data
Subscribers see an interactive map with Carno Wind Farm and local projects displayed.
( Subscribe for £100 )to have full access to all Wind projects and details.
Subscribe to Wind for exact generator location including nearby generators
For an example of a wind project see: Little Cheyne Court Wind Farm
Subscribe for £500 to include full csv and KML downloads of all Wind project data.
To create a login account see: User Registration. This will allow 30 page views each session rather than 5
One subscription covers your organisation / school / university / company . NOT per user
|
Carno Wind Farm (Wind , Active) Location in the UK : Wales, Powys Type of installation: Wind on/offshore: on Turbines :56 Capacity : 33.6 MW Approx Date of 1st power generation: March 2009
Subscribe to Renewables Map to see: Wind Turbines make / model / hub height / elevation / latitude and longitude. Accurate data available for 99% of all Active wind farms listed, also cross reference to DECC and OFGEM datasets
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
Carno Extension (2). In 2008 an extension is to be added and designated "Carno 2" bringing the total number of turbines to 68. These will comprise 12 new Siemens 1.3MW wind turbines with a hub height of 49 m, blade length of 30 m, rotor diameter of 62 m giving a tip height of 80 m.
Carno 2 LLP was FIM’s first build in Wales. It is a joint venture with three local farmers who took the project through the planning process and then got FIM involved to assist with finance, build and operation of the project. Running since 2009 the site cost £20M to build and produces enough energy to power some 8,600 households. For Wind projects, Subscribed version includes Turbine data, average hub height, average elevation Subscriber Register
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Carno 3 45 MW
|
Energy Type: |
Wind Onshore |
County: |
Powys Country: Wales LPA: Powys County Council
|
Site ID and Reference: |
4571 / AA763
District:
|
Applicant: |
Amegni Renewables
Application :
P/2010/0762
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
18 |
Turbine Capacity: |
2.5 |
Height of Turbines: |
|
Calculated capacity: |
45 |
Site Address: |
Carno, Powys, SY17 5JS
|
|
|
County: |
Powys Region: Wales
|
OS Coordinates: |
294433 / 294433
|
Development Status: |
Planning Permission Expired
|
Application Submitted: |
7/15/2010
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
|
|
|
Generator Live |
|
This Record Last Updated: |
5/21/2019
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
5/26/2022 |
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Carno ''A''and ''B'' Wind Farm, (Extension) 15.6 MW
|
Energy Type: |
Wind Onshore |
County: |
Powys Country: Wales LPA: Powys County Council
|
Site ID and Reference: |
3277 / N00444W
District:
|
Applicant: |
RWE npower
Application :
M2003/1156
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
12 |
Turbine Capacity: |
1.3 |
Height of Turbines: |
|
Calculated capacity: |
15.6 |
Site Address: |
Cwm Cledan
, Carno
, Powys
|
|
|
County: |
Powys Region: Wales
|
OS Coordinates: |
293000 / 293000
|
Development Status: |
Operational
|
Application Submitted: |
10/10/2003
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
|
|
|
Generator Live |
3/1/2009
|
This Record Last Updated: |
1/6/2010
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Carno ''B'' Wind Farm 16.8 MW
|
Energy Type: |
Wind Onshore |
County: |
Powys Country: Wales LPA: Powys County Council
|
Site ID and Reference: |
2564 / 04050W3
District:
|
Applicant: |
RWE npower
Application :
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
28 |
Turbine Capacity: |
0.59999999999999998 |
Height of Turbines: |
|
Calculated capacity: |
16.8 |
Site Address: |
Trannon Moor, Carno, Powys
|
|
|
County: |
Powys Region: Wales
|
OS Coordinates: |
291053 / 291053
|
Development Status: |
Operational
|
Application Submitted: |
12/30/1993
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
|
|
|
Generator Live |
10/1/1996
|
This Record Last Updated: |
10/30/2011
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Carno ''A'' Wind Farm 16.8 MW
|
Energy Type: |
Wind Onshore |
County: |
Powys Country: Wales LPA: Powys County Council
|
Site ID and Reference: |
2565 / 04051W3
District:
|
Applicant: |
RWE npower
Application :
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
28 |
Turbine Capacity: |
0.59999999999999998 |
Height of Turbines: |
|
Calculated capacity: |
16.8 |
Site Address: |
Cwm Cledan
Carno
Powys
|
|
|
County: |
Powys Region: Wales
|
OS Coordinates: |
293000 / 293000
|
Development Status: |
Operational
|
Application Submitted: |
8/16/1993
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
|
|
|
Generator Live |
10/1/1996
|
This Record Last Updated: |
10/30/2011
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Capacity: 48.6000000000001 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 23 m/s (51.451 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 4/24/2024 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Carn Nicholas Drone footage Date and Time of entry: Tuesday, March 19, 2024 00:00
Carn Nicholas Solar Park The site, developed and constructed by Innova Renewables, was energised earlier this year following the beginning of its construction in May 2022. Date and Time of entry: Tuesday, March 19, 2024 00:00
Dorset Green Dorset Green H2 – South West’s first solar to green hydrogen production plant ready to produce clean, zero emission, green renewable energy Date and Time of entry: Tuesday, March 19, 2024 00:00
Dragon LNG Meadow
Date and Time of entry: Tuesday, March 19, 2024 00:00
Pretoria rd looking towards Ellistown.Solar farm.
Date and Time of entry: Tuesday, March 19, 2024 00:00
|
|
©2017
Simon Mallett |
|