Loading
Page views this IP this session = 1 of 10 unsubscribed pagesStud Farm Energy from Waste Plant
Subscribers see an interactive map with Stud Farm Energy from Waste Plant and local projects displayed.
( Subscribe for £100 )to have full access to all Waste projects and details.
Subscribe to Waste for exact generator location including nearby generators
Subscribe for £500 to include full csv and KML downloads of all Waste project data.
To create a login account see: User Registration. This will allow 30 page views each session rather than 5
One subscription covers your organisation / school / university / company . NOT per user
|
Stud Farm (Waste , Active, Waste Anaerobic Digestion) Location in the UK : England, NG22 9HB Type of installation: Waste on/offshore: on Turbines :0 Capacity : 2.2 MW Approx Date of 1st power generation: March 2017
/YES
Rufford, Newark, Nottinghamshire
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Stud Farm, Rufford (Farm AD) 2.2 MW
|
Energy Type: |
Anaerobic Digestion |
County: |
Nottinghamshire Country: England LPA: Nottinghamshire County Council
|
Site ID and Reference: |
265 / A0381
District:
|
Applicant: |
Future Biogas
Application :
F/1695
|
(Go to search to find Application) |
Site Address: |
Rufford, Newark,
|
|
NG22 9HB
|
County: |
Nottinghamshire Region: East Midlands
|
OS Coordinates: |
465057 / 465057
|
Development Status: |
Operational
|
Application Submitted: |
9/28/2009
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
9/1/2016
|
|
|
Generator Live |
3/30/2017
|
This Record Last Updated: |
4/20/2017
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Project Info |
Proposed solar farm plans Plans for the solar farm at Twemlows STUD FARM were unveiled last Wednesday by solar power company vogt solar . Proposers say the scheme to develop a 16.3MW solar farm on 23.2 hectares of land owned by the Matson family, could power 4,320 homes
Solar power for 4,320 homes A SOLAR farm which could power 4,320 homes is being planned for Twemlows STUD FARM at Prees Heath
ns for third Shropshire solar farm unveiled Another giant solar farm could be built in the Shropshire countryside under plans revealed today. The farm would feature around 70,000 panels and could power up to 4,320 homes. It would be built at Twemlows STUD FARM
|
|
©2018
Simon Mallett |
Latest News Added |
Carn Nicholas Drone footage Date and Time of entry: Tuesday, March 19, 2024 00:00
Carn Nicholas Solar Park The site, developed and constructed by Innova Renewables, was energised earlier this year following the beginning of its construction in May 2022. Date and Time of entry: Tuesday, March 19, 2024 00:00
Dorset Green Dorset Green H2 – South West’s first solar to green hydrogen production plant ready to produce clean, zero emission, green renewable energy Date and Time of entry: Tuesday, March 19, 2024 00:00
Dragon LNG Meadow
Date and Time of entry: Tuesday, March 19, 2024 00:00
Pretoria rd looking towards Ellistown.Solar farm.
Date and Time of entry: Tuesday, March 19, 2024 00:00
|
|
©2017
Simon Mallett |
|