Ryder Point Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Subscribers see an interactive map with Ryder Point Wind Farm and local projects displayed.

( Subscribe for £100 )to have full access to all Wind projects and details.


Subscribe to Wind for exact generator location including nearby generators
For an example of a wind project see: Little Cheyne Court Wind Farm


Subscribe for £500 to include full csv and KML downloads of all Wind project data.

To create a login account see: User Registration. This will allow 30 page views each session rather than 5

One subscription covers your organisation / school / university / company . NOT per user

Ryder Point Wind Farm (Wind , Active)

 General Information.

Location in the UK : England, DE4 4ES    
Type of installation: Wind    on/offshore: on
Turbines :1  Capacity : 2.3 MW
Approx Date of 1st power generation: November 2014

Subscribe to Renewables Map to see: Wind Turbines make / model / hub height / elevation / latitude and longitude. Accurate data available for 99% of all Active wind farms listed, also cross reference to DECC and OFGEM datasets

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

12/00723/FUL | Erection of 2 wind turbines with maximum height to blade tip of 102m with associated access tracks, site access point, control building, underground cabling and 61m meterological mast | Land At Ryder Point Quarry North Of Manystones Lane Brassington Derbyshire

 Turbine Make and Specs

For Wind projects, Subscribed version includes Turbine data, average hub height, average elevation
Subscriber Register

 Address

Bone Mill Quarry Manystones Lane Brassington Matlock DE4 4ES England

 Associated Companies.

Relationship Company (For: Ryder Point )
ContractorRaymond Brown Renewables

 DECC Data on this Project: Ryder Point :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Ryder Point Quarry Wind Turbines     5 MW
Energy Type: Wind Onshore
County: Derbyshire     Country: England     LPA: Derbyshire Dales District Council
Site ID and Reference: 4206 / B0852     District:
Applicant: Longcliffe Quarries     Application : 12/00723/FUL (Go to search to find Application)
For Wind Farms  
Number of Turbines: 2 Turbine Capacity: 2.5
Height of Turbines: Calculated capacity: 5
Site Address: Ryder Point Quarry North Of Manystones Lane Brassington Derbyshire
 
County: Derbyshire Region: East Midlands
OS Coordinates: 425455 / 425455
Development Status: Operational
Application Submitted: 11/21/2012 Planning Permission Granted
Application Determined: Permission refused:
Construction Date: 4/15/2015    
Generator Live 12/15/2015 This Record Last Updated: 1/23/2017
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

Site Name: Sibelco Brassington     2.3 MW
Energy Type: Wind Onshore
County: Derbyshire     Country: England     LPA: Derbyshire Dales District Council
Site ID and Reference: 3382 / B0354     District:
Applicant: Sibelco/ Golconda     Application : 11/00291/FUL (Go to search to find Application)
For Wind Farms  
Number of Turbines: 1 Turbine Capacity: 2.5
Height of Turbines: Calculated capacity: 2.5
Site Address: Manystones Lane Brassington Derbyshire
 
County: Derbyshire Region: East Midlands
OS Coordinates: 424985 / 424985
Development Status: Operational
Application Submitted: 4/11/2011 Planning Permission Granted
Application Determined: Permission refused:
Construction Date: 2/15/2015    
Generator Live 9/15/2016 This Record Last Updated: 6/22/2017
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Ryder Point: Wind :

Site Name: Ryder Point Dec15
Generator Type: Wind
Scheme : REGO Generator ID: G02874NWEN
Capacity: 3840 Status: Live
Accreditation Date: 4/11/2011    
Commission Date: 11/19/2015    
Applicant: Longcliffe Quarries Ltd
Applicant Address: Longcliffe Quarries Ltd Longcliffe MATLOCK DE4 4BZ England
Address: Bone Mill Quarry Manystones Lane Brassington Matlock DE4 4ES England
 
Assumptions: Capacity: 3840kW 3.84 MW,
Thus over the month Capacity * 720 hours per month = 2764.8 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status
771 20.08% Issued
01/09/2016 - 30/11/2016 00 2394 62.34% Issued
01/04/2016 - 31/08/2016 00 3344 87.08% Issued
01/11/2015 - 31/03/2016 00 4680 121.88% Issued

 Calculations


Capacity: 5
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 25 m/s (55.925 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 3/29/2024
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 5 start: 5 Optimum: 15/ Stop: 25 / wind: / ratio 350155

Project Info
Manystones Lane site near Brassington

Renewable Energy Plan - Ryder Pont
Our quarries at Brassington Moor and RYDER POINT consume approximately £3.5m of energy per annum, leaving the business exceedingly vulnerable both to shifting energy markets and to government energy policy.

©2018 Simon Mallett
Latest News Added
Carn Nicholas
Drone footage
Date and Time of entry: Tuesday, March 19, 2024 00:00

Carn Nicholas Solar Park
The site, developed and constructed by Innova Renewables, was energised earlier this year following the beginning of its construction in May 2022.
Date and Time of entry: Tuesday, March 19, 2024 00:00

Dorset Green
Dorset Green H2 – South West’s first solar to green hydrogen production plant ready to produce clean, zero emission, green renewable energy
Date and Time of entry: Tuesday, March 19, 2024 00:00

Dragon LNG Meadow

Date and Time of entry: Tuesday, March 19, 2024 00:00

Pretoria rd looking towards Ellistown.Solar farm.

Date and Time of entry: Tuesday, March 19, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School