Sorry I found no matches, Please try again. 176
vid = 50pws_id = 352200pws_id = 352200
--------------------------------------------------------
(825) Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 3.142.35.155 {832) YESU WSHW: 1/10
Loading
Page views this IP this session = 1 of 10 unsubscribed pages

Black Law Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Subscribers see an interactive map with Black Law Wind Farm and local projects displayed.

( Subscribe for £100 )to have full access to all Wind projects and details.


Subscribe to Wind for exact generator location including nearby generators
For an example of a wind project see: Little Cheyne Court Wind Farm


Subscribe for £500 to include full csv and KML downloads of all Wind project data.

To create a login account see: User Registration. This will allow 30 page views each session rather than 5

One subscription covers your organisation / school / university / company . NOT per user

Black Law Wind Farm (Wind , Active)

 General Information.

Location in the UK : Scotland, Forth, South Lanarkshire    
Type of installation: Wind    on/offshore: on
Turbines :54  Capacity : 97 MW
Approx Date of 1st power generation: January 2006

Subscribe to Renewables Map to see: Wind Turbines make / model / hub height / elevation / latitude and longitude. Accurate data available for 99% of all Active wind farms listed, also cross reference to DECC and OFGEM datasets

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

Black Law Extension (1a 23 turbines and 1b 11 turbines) 24 Additional turbines 63 MW +
Black Law Extension February 2016
When opened, the Black Law windfarm in Lanarkshire, was the the largest operating wind farm in the UK with 42 turbines.

The Black Law Windfarm currently consists of 42 turbines with a 97 MW capacity. It has been operational since July 2005 and plans to add a further 12 turbines (Black Law B) to the site are being progressed.

 Turbine Make and Specs

For Wind projects, Subscribed version includes Turbine data, average hub height, average elevation
Subscriber Register

 Address

Black Law WindfarmClimpy RoadClimpy Near ForthSouth Lanarkshire Scotland ML11 8EW Scotland

 Associated Companies.

Relationship Company (For: Black Law )
OwnerScottish Power Renewables
OperatorScottish Power Renewables

 DECC Data on this Project: Black Law :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Black Law Extension - 1b     15 MW
Energy Type: Wind Onshore
County: Strathclyde     Country: Scotland     LPA: Scottish Government (S36)
Site ID and Reference: 4580 / A0502     District:
Applicant: Scottish Power Renewables     Application : (Go to search to find Application)
For Wind Farms  
Number of Turbines: 5 Turbine Capacity: 3
Height of Turbines: Calculated capacity: 15
Site Address: Black Law, Climpy
 
County: Strathclyde Region: Scotland
OS Coordinates: 289500 / 289500
Development Status: Operational
Application Submitted: 5/10/2011 Planning Permission Granted
Application Determined: Permission refused:
Construction Date: 8/18/2015    
Generator Live 2/18/2016 This Record Last Updated: 5/16/2016
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date: 6/17/2020    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

Site Name: Black Law Extension - 1a     48.4 MW
Energy Type: Wind Onshore
County: Strathclyde     Country: Scotland     LPA: Scottish Government (S36)
Site ID and Reference: 4253 / EN00535     District:
Applicant: Scottish Power Renewables     Application : (Go to search to find Application)
For Wind Farms  
Number of Turbines: 29 Turbine Capacity: 1.6699999999999999
Height of Turbines: Calculated capacity: 48.43
Site Address: Black Law, Climpy
 
County: Strathclyde Region: Scotland
OS Coordinates: 289500 / 289500
Development Status: Operational
Application Submitted: 1/25/2008 Planning Permission Granted
Application Determined: Permission refused:
Construction Date: 9/30/2014    
Generator Live 2/18/2016 This Record Last Updated: 4/22/2016
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

Site Name: Black Law     124 MW
Energy Type: Wind Onshore
County: Strathclyde     Country: Scotland     LPA: Scottish Government (S36)
Site ID and Reference: 3116 / N00056W     District:
Applicant: Scottish Power Renewables     Application : (Go to search to find Application)
For Wind Farms  
Number of Turbines: 54 Turbine Capacity: 2.2999999999999998
Height of Turbines: Calculated capacity: 124.2
Site Address: Black Law, Climpy
 
County: Strathclyde Region: Scotland
OS Coordinates: 289500 / 289500
Development Status: Operational
Application Submitted: 5/22/2002 Planning Permission Granted
Application Determined: Permission refused:
Construction Date:    
Generator Live 5/31/2004 This Record Last Updated: 12/14/2011
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Black Law: Wind :

 Calculations


Capacity: 248.4
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 25 m/s (55.925 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 4/20/2024
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 248.4 start: 5 Optimum: 15/ Stop: 25 / wind: / ratio 352200

Project Info
BLACK LAW EXTENSION

Scottish Government

Scottish Power BLACK LAW

BLACK LAW from the air

BLACK LAW Windfarm Extension Grid Connection
This Non-Technical Summary has been prepared in support of the BLACK LAW Windfarm Extension Grid Connection Environmental Statement

©2018 Simon Mallett
Latest News Added
Carn Nicholas
Drone footage
Date and Time of entry: Tuesday, March 19, 2024 00:00

Carn Nicholas Solar Park
The site, developed and constructed by Innova Renewables, was energised earlier this year following the beginning of its construction in May 2022.
Date and Time of entry: Tuesday, March 19, 2024 00:00

Dorset Green
Dorset Green H2 – South West’s first solar to green hydrogen production plant ready to produce clean, zero emission, green renewable energy
Date and Time of entry: Tuesday, March 19, 2024 00:00

Dragon LNG Meadow

Date and Time of entry: Tuesday, March 19, 2024 00:00

Pretoria rd looking towards Ellistown.Solar farm.

Date and Time of entry: Tuesday, March 19, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School