Sorry I found no matches, Please try again. 176
vid = 4624pws_id = 352266pws_id = 352266
--------------------------------------------------------
(825) Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 3.144.212.145 {832) YESU WSHW: 1/10
Loading
Page views this IP this session = 1 of 10 unsubscribed pages

Marshill Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Subscribers see an interactive map with Marshill Wind Farm and local projects displayed.

( Subscribe for £100 )to have full access to all Wind projects and details.


Subscribe to Wind for exact generator location including nearby generators
For an example of a wind project see: Little Cheyne Court Wind Farm


Subscribe for £500 to include full csv and KML downloads of all Wind project data.

To create a login account see: User Registration. This will allow 30 page views each session rather than 5

One subscription covers your organisation / school / university / company . NOT per user

Marshill Wind Farm (Wind , Active)

 General Information.

Location in the UK : Scotland, ML11 9PW    
Type of installation: Wind    on/offshore: on
Turbines :1  Capacity : 1.5 MW
Approx Date of 1st power generation: August 2015

Subscribe to Renewables Map to see: Wind Turbines make / model / hub height / elevation / latitude and longitude. Accurate data available for 99% of all Active wind farms listed, also cross reference to DECC and OFGEM datasets

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

Green Cat Renewables Operational

The project consists of a single Enercon E-82 (2.3MW, running at 1.5MW) and two Enercon E48 (800kw) turbines, with a total capacity of 3.9MW, at a cost of £7.6 million.

 Turbine Make and Specs

For Wind projects, Subscribed version includes Turbine data, average hub height, average elevation
Subscriber Register

 Address

Farmland to the West of, Draffan Road, Draffanmarshill Farm, Lanark, Strathclyde

 Associated Companies.

Relationship Company (For: Marshill )
DeveloperGreenCat Renewables

 DECC Data on this Project: Marshill :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Marshill Farm     1.5 MW
Energy Type: Wind Onshore
County: South Lanarkshire     Country: Scotland     LPA: South Lanarkshire Council
Site ID and Reference: 6106 /     District:
Applicant: Green Cat Renewables     Application : CL/12/0300 (Go to search to find Application)
For Wind Farms  
Number of Turbines: 1 Turbine Capacity: 1.5
Height of Turbines: 119 Calculated capacity: 1.5
Site Address: Farmland to the West of, Draffan Road, Draffanmarshill Farm, Lanark, Strathclyde
  ML11 9PW
County: South Lanarkshire Region: Scotland
OS Coordinates: 278551 / 278551
Development Status: Operational
Application Submitted: 7/9/2012 Planning Permission Granted
Application Determined: Permission refused:
Construction Date: 12/1/2014    
Generator Live 8/1/2015 This Record Last Updated: 8/18/2016
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date: 6/17/2019    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Marshill: Wind :

Site Name: Marshill Turbine
Generator Type: Wind
Scheme : REGO Generator ID: G02313NWSC
Capacity: 1500 Status: Live
Accreditation Date: 7/9/2012    
Commission Date: 9/8/2015    
Applicant: Stewart Energy limited
Applicant Address: Marshill Farm Blackwood lesmahagow Lanark ML11 9PW Scotland
Address: Marshill Farm Blackwood Lesmahagow ML11 9PW Scotland
 
Assumptions: Capacity: 1500kW 1.5 MW,
Thus over the month Capacity * 720 hours per month = 1080 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status
992 66.13% Issued
1489 99.27% Issued
01/09/2016 - 31/12/2016 00 1545 103.00% Issued
01/08/2016 - 31/08/2016 00 374 24.93% Issued
Jul-16 00 350 23.33% Issued
Jul-16 00 350 23.33% Issued
Jun-16 00 178 11.87% Issued
May-16 00 344 22.93% Issued
Apr-16 00 297 19.80% Issued
Mar-16 00 343 22.87% Redeemed
Feb-16 00 278 18.53% Redeemed
Jan-16 00 514 34.27% Redeemed
Dec-15 00 605 40.33% Redeemed
Nov-15 00 606 40.40% Redeemed
Oct-15 00 178 11.87% Redeemed
Sep-15 00 104 6.93% Redeemed
485 32.33% Issued
411 27.40% Issued
508 33.87% Issued
378 25.20% Issued
501 33.40% Issued
477 31.80% Issued
468 31.20% Issued
329 21.93% Issued
502 33.47% Issued
409 27.27% Issued

 Calculations


Capacity: 6.2
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 27 m/s (60.399 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 4/20/2024
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 6.2 start: 5 Optimum: 15/ Stop: 27 / wind: / ratio 352266

Project Info
Lanarkshire Wind Project Gets Second Visit
The project, being established by Andrew Stewart at MARSHILL near Lesmahagow consists of a single Enercon E-82 (2.3MW) turbine and two Enercon E48 (800kw) turbines with a total generating capacity of 3.9MW.

NFU: MARSHILL Farm Wind Turbines
The project consists of a single Enercon E-82 (2.3MW) and two Enercon E48 (800kw) with a total capacity of 3.9MW at a cost of £6.2 million.

MARSHILL Farm Wind Turbines

©2018 Simon Mallett
Latest News Added
Carn Nicholas
Drone footage
Date and Time of entry: Tuesday, March 19, 2024 00:00

Carn Nicholas Solar Park
The site, developed and constructed by Innova Renewables, was energised earlier this year following the beginning of its construction in May 2022.
Date and Time of entry: Tuesday, March 19, 2024 00:00

Dorset Green
Dorset Green H2 – South West’s first solar to green hydrogen production plant ready to produce clean, zero emission, green renewable energy
Date and Time of entry: Tuesday, March 19, 2024 00:00

Dragon LNG Meadow

Date and Time of entry: Tuesday, March 19, 2024 00:00

Pretoria rd looking towards Ellistown.Solar farm.

Date and Time of entry: Tuesday, March 19, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School