Loading
Page views this IP this session = 1 of 10 unsubscribed pagesDocking Shoal Wind Farm
Click here for Generation Forecast for wind farms based on Met office data
Subscribers see an interactive map with Docking Shoal Wind Farm and local projects displayed.
( Subscribe for £100 )to have full access to all Wind projects and details.
Subscribe to Wind for exact generator location including nearby generators
For an example of a wind project see: Little Cheyne Court Wind Farm
Subscribe for £500 to include full csv and KML downloads of all Wind project data.
To create a login account see: User Registration. This will allow 30 page views each session rather than 5
One subscription covers your organisation / school / university / company . NOT per user
|
Docking Shoal Wind Farm (Wind , Refused) Location in the UK : England, Greater Wash Type of installation: Wind on/offshore: off Turbines :83 Capacity : 500 MW Approx Date of 1st power generation:
Subscribe to Renewables Map to see: Wind Turbines make / model / hub height / elevation / latitude and longitude. Accurate data available for 99% of all Active wind farms listed, also cross reference to DECC and OFGEM datasets
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
Doking Shoal and Race bank are often quoted in the context of a single project.
Centrica was awarded an Agreement for Lease from the Crown Estate in 2004 for the development of a wind farm at Docking Shoal. Subject to consent, the project (estimated at around 500MW) would be one of three Round 2 wind farms to be built by Centrica. The others are the Lincs and Race Bank offshore wind farms. For Wind projects, Subscribed version includes Turbine data, average hub height, average elevation Subscriber Register
Relationship |
Company (For:
Docking Shoal
) |
Developer | Centrica |
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Docking Shoal A 540 MW
|
Energy Type: |
Wind Offshore |
County: |
Offshore Country: England LPA: DECC (S36)
|
Site ID and Reference: |
2516 / N00559W
District:
|
Applicant: |
Centrica
Application :
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
108 |
Turbine Capacity: |
5 |
Height of Turbines: |
|
Calculated capacity: |
540 |
Site Address: |
17km off the North Norfolk Coast
|
|
|
County: |
Offshore Region: Offshore
|
OS Coordinates: |
588560 / 588560
|
Development Status: |
Planning Permission Refused
|
Application Submitted: |
12/9/2008
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
7/6/2012
|
Construction Date: |
|
|
|
Generator Live |
|
This Record Last Updated: |
7/6/2012
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
7/6/2012 |
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Carn Nicholas Drone footage Date and Time of entry: Tuesday, March 19, 2024 00:00
Carn Nicholas Solar Park The site, developed and constructed by Innova Renewables, was energised earlier this year following the beginning of its construction in May 2022. Date and Time of entry: Tuesday, March 19, 2024 00:00
Dorset Green Dorset Green H2 – South West’s first solar to green hydrogen production plant ready to produce clean, zero emission, green renewable energy Date and Time of entry: Tuesday, March 19, 2024 00:00
Dragon LNG Meadow
Date and Time of entry: Tuesday, March 19, 2024 00:00
Pretoria rd looking towards Ellistown.Solar farm.
Date and Time of entry: Tuesday, March 19, 2024 00:00
|
|
©2017
Simon Mallett |
|