Sorry I found no matches, Please try again. 176
vid = 407pws_id = 354700pws_id = 354700
--------------------------------------------------------
(825) Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 44.211.91.23 {832) YESU WSHW: 1/10
Loading
Page views this IP this session = 1 of 10 unsubscribed pages

Thanet Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Subscribers see an interactive map with Thanet Wind Farm and local projects displayed.

( Subscribe for £100 )to have full access to all Wind projects and details.


Subscribe to Wind for exact generator location including nearby generators
For an example of a wind project see: Little Cheyne Court Wind Farm


Subscribe for £500 to include full csv and KML downloads of all Wind project data.

To create a login account see: User Registration. This will allow 30 page views each session rather than 5

One subscription covers your organisation / school / university / company . NOT per user

Thanet Wind Farm (Wind , Active)

 General Information.

Location in the UK : England, Kent, Foreness    
Type of installation: Wind    on/offshore: off
Turbines :100  Capacity : 300 MW
Approx Date of 1st power generation: 2010 September

Subscribe to Renewables Map to see: Wind Turbines make / model / hub height / elevation / latitude and longitude. Accurate data available for 99% of all Active wind farms listed, also cross reference to DECC and OFGEM datasets

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

proposed 147MW extension

Thanet array was officially opened on 23 September 2010 as the largest offshore wind farm in the world. It is visible from most of the coast of Thanet.
London Array and Thanet Array are the first projects to be granted consent under round two of UK offshore wind development, expected to produce 5-7GW worth of wind power in total, enough to power 240,000 homes when running to peak effectiveness. Thanet is one of 15 Round 2 wind projects announced by the Crown Estate in January 2004.

The wind farm will be approx 12km off Foreness Point, completion is expected in 2010. Construction is based from Port Ramsgate.

Power will be brought ashore from this wind farm to an existing sub-station at Richborough.

It is currently (Sept 2010) the largest operational offshore wind farm anywhere in the World. It will make a significant contribution to the Government’s national and regional renewable energy targets.
Turbine layout shows 40 proposed additional turbines, final layout will be 34 turbines

 Turbine Make and Specs

For Wind projects, Subscribed version includes Turbine data, average hub height, average elevation
Subscriber Register

 Address

Thanet Offshore Wind Farm Military Road Ramsgate CT11 9LG England

 Associated Companies.

Relationship Company (For: Thanet )
DeveloperVattenfall
OperatorVattenfall
OwnerVattenfall

 DECC Data on this Project: Thanet :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Thanet (extension)     340 MW
Energy Type: Wind Offshore
County: Offshore     Country: England     LPA: DECC (S36)
Site ID and Reference: 6299 /     District:
Applicant: Vattenfall     Application : (Go to search to find Application)
For Wind Farms  
Number of Turbines: 34 Turbine Capacity: 10
Height of Turbines: 210 Calculated capacity: 340
Site Address: Thanet offshore windfarm, Dover,
  CT15
County: Offshore Region: Offshore
OS Coordinates: 649878 / 649878
Development Status: Planning Permission Refused
Application Submitted: 6/27/2018 Planning Permission Granted
Application Determined: Permission refused: 6/1/2020
Construction Date:    
Generator Live This Record Last Updated: 6/29/2020
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted: 6/1/2020

Site Name: Thanet      300 MW
Energy Type: Wind Offshore
County: Offshore     Country: England     LPA: DECC (S36)
Site ID and Reference: 2499 / N00452W     District:
Applicant: Vattenfall     Application : (Go to search to find Application)
For Wind Farms  
Number of Turbines: 100 Turbine Capacity: 3
Height of Turbines: Calculated capacity: 300
Site Address: 11km off North Foreland Kent
 
County: Offshore Region: Offshore
OS Coordinates: 652658 / 652658
Development Status: Operational
Application Submitted: 11/8/2005 Planning Permission Granted
Application Determined: Permission refused:
Construction Date: 11/1/2009    
Generator Live 9/16/2010 This Record Last Updated: 5/1/2018
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Thanet: Wind :

Site Name: Thanet Offshore Wind Farm
Generator Type: Off-shore wind (RO code = RP)
Scheme : RO Generator ID: R00015RPEN
Capacity: 298000 Status: Live
Accreditation Date: 11/8/2005    
Commission Date: 7/2/2010    
Applicant: Vattenfall Wind Power Ltd
Applicant Address: 1st Floor 1 Tudor Street London EC4Y 0AH England
Address: Thanet Offshore Wind Farm Military Road Ramsgate CT11 9LG England

Site Name: Thanet Offshore Wind Farm
Generator Type: Off-shore wind (REGO code = FW)
Scheme : REGO Generator ID: G01159FWEN
Capacity: 298000 Status: Live
Accreditation Date: 11/8/2005    
Commission Date: 7/2/2010    
Applicant: Vattenfall Wind Power Ltd
Applicant Address: 1st Floor 1 Tudor Street London EC4Y 0AH England
Address: Thanet Offshore Wind Farm Military Road Ramsgate CT11 9LG England
 
Assumptions: Capacity: 298000kW 298 MW,
Thus over the month Capacity * 720 hours per month = 214560 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status
01/03/2018 90721 30.44% Issued
01/02/2018 103430 34.71% Issued
01/01/2018 107489 36.07% Issued
01/12/2017 112740 37.83% Issued
01/11/2017 87500 29.36% Issued
01/10/2017 27264 9.15% Issued
01/09/2017 56842 19.07% Issued
01/08/2017 40702 13.66% Issued
01/07/2017 51303 17.22% Issued
01/06/2017 40355 13.54% Issued
01/06/2017 7675 2.58% Issued
01/05/2017 5509 1.85% Issued
01/05/2017 50219 16.85% Issued
01/04/2017 41363 13.88% Issued
01/03/2017 88840 29.81% Issued
01/02/2017 1130 0.38% Redeemed
01/02/2017 76263 25.59% Redeemed
01/02/2017 10000 3.36% Redeemed
01/01/2017 10000 3.36% Redeemed
01/01/2017 59573 19.99% Redeemed
01/01/2017 1337 0.45% Redeemed
Dec-16 013004 64466 21.63% Issued
Nov-16 018339 87036 29.21% Issued
Oct-16 012133 59875 20.09% Issued
Sep-16 093756 42772 14.35% Issued
Aug-16 010461 5712 1.92% Retired
Jul-16 088364 38024 12.76% Issued
Jun-16 099050 40425 13.57% Issued
Jun-16 099050 49525 16.62% Issued
May-16 013144 65722 22.05% Issued
Apr-16 010764 53823 18.06% Issued
Mar-16 013633 68167 22.87% Issued
Feb-16 021029 10514 3.53% Issued
Jan-16 025348 12674 4.25% Issued
Dec-15 029394 14697 4.93% Redeemed
Nov-15 025387 12693 4.26% Redeemed
Oct-15 011868 59344 19.91% Redeemed
Sep-15 012798 63994 21.47% Redeemed
Aug-15 011161 55809 18.73% Redeemed
Jul-15 13827 69139 23.20% Redeemed
Jun-15 10223 51115 17.15% Redeemed
May-15 12041 60209 20.20% Redeemed
Apr-15 92524 46262 15.52% Redeemed
Mar-15 13388 66940 22.46% Redeemed
Feb-15 15026 75133 25.21% Redeemed
Jan-15 22780 11390 3.82% Redeemed
Dec-14 20769 10384 3.48% Redeemed
Nov-14 15168 75843 25.45% Redeemed
Oct-14 17513 87566 29.38% Redeemed
Sep-14 2895457118 28954 9.72% Redeemed
Aug-14 13192 65962 22.13% Redeemed
Jul-14 98802 49401 16.58% Redeemed
Jun-14 65310 33067 11.10% Redeemed
May-14 10339 52029 17.46% Redeemed
Apr-14 99457 49728 16.69% Redeemed
Mar-14 6665513331 66655 22.37% Redeemed
Feb-14 1193623873 11936 4.01% Redeemed
Jan-14 1302426049 13024 4.37% Redeemed
Dec-13 9953719907 99536 33.40% Redeemed
Nov-13 9656719313 96568 32.41% Redeemed
Oct-13 9706219412 97061 32.57% Redeemed
Sep-13 5547311094 55472 18.61% Redeemed
Aug-13 3997979475 39980 13.42% Redeemed
Jul-13 4398787224 43986 14.76% Redeemed
Jun-13 5738411476 57384 19.26% Redeemed
May-13 5277910555 52779 17.71% Redeemed
Apr-13 6689713379 66897 22.45% Redeemed
Mar-13 8459116918 84591 28.39% Redeemed
Feb-13 9078718157 90788 30.47% Redeemed
Jan-13 8051316102 80512 27.02% Redeemed
Dec-12 1241024821 12410 4.16% Redeemed
Nov-12 8682617365 86825 29.14% Redeemed
Oct-12 7922815845 79228 26.59% Redeemed
Sep-12 6629813259 66298 22.25% Redeemed
Aug-12 5563411126 55634 18.67% Redeemed
Jul-12 4768694865 47686 16.00% Redeemed
Jun-12 7592815185 75928 25.48% Redeemed
May-12 6424412848 64244 21.56% Redeemed
Apr-12 7084414168 70844 23.77% Redeemed
Mar-12 3035360133 30352 10.19% Expired
Feb-12 5426510853 54265 18.21% Redeemed
Jan-12 6680713361 66807 22.42% Redeemed
Dec-11 9370418740 93704 31.44% Redeemed
Nov-11 5530111060 55301 18.56% Redeemed
Oct-11 7537015073 75369 25.29% Redeemed
Sep-11 7436314872 12583 4.22% Redeemed
Aug-11 5463010926 54630 18.33% Redeemed
Jul-11 5680511284 56805 19.06% Redeemed
Jun-11 7010914021 46784 15.70% Redeemed
May-11 7003814007 70037 23.50% Redeemed
Apr-11 6045712091 60458 20.29% Redeemed
Mar-11 5820611641 58071 19.49% Expired
Feb-11 6124412248 61000 20.47% Expired
Jan-11 9404018808 2317 0.78% Expired
Dec-10 7776615553 37000 12.42% Retired
Nov-10 8625117250 343 0.12% Expired
Oct-10 9371118742 395 0.13% Expired

 Calculations


Capacity: 600
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 25 m/s (55.925 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 3/29/2024
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 600 start: 5 Optimum: 15/ Stop: 25 / wind: / ratio 354700

Project Info
Vattenfall says public support plans to extend THANET Offshore Wind Farm project
Swedish energy firm Vattenfall wants to add a further 34 giant turbines to the THANET Offshore Wind Farm, off the coast of THANET and Sandwich.

Environmental Impact Assessment Report to Inform Scoping

Vattenfall revives plan to extend UK offshore wind farm
Swedish energy company Vattenfall plans to extend its 300-megawatt THANET offshore wind farm off the coast of Kent in southern England, it said, after scrapping the idea in 2010 due to grid constraints.

Vattenfall unveils 340MW THANET 2
Vattenfall has taken the wraps off plans for 34 turbines at an up to 340MW THANET 2 wind farm off the UK east coast.

THANET Extension

©2018 Simon Mallett
Latest News Added
Carn Nicholas
Drone footage
Date and Time of entry: Tuesday, March 19, 2024 00:00

Carn Nicholas Solar Park
The site, developed and constructed by Innova Renewables, was energised earlier this year following the beginning of its construction in May 2022.
Date and Time of entry: Tuesday, March 19, 2024 00:00

Dorset Green
Dorset Green H2 – South West’s first solar to green hydrogen production plant ready to produce clean, zero emission, green renewable energy
Date and Time of entry: Tuesday, March 19, 2024 00:00

Dragon LNG Meadow

Date and Time of entry: Tuesday, March 19, 2024 00:00

Pretoria rd looking towards Ellistown.Solar farm.

Date and Time of entry: Tuesday, March 19, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School