vid = 4023pws_id = pws_id = Sorry I found no matches, Please try again.

--------------------------------------------------------
(825) Not Logged on, Max pages: 5( 1 Seen ) ID:657 Ind:1 IP: 54.226.94.217 {832) YESU WSHW: 1/5
Loading
Page views this IP this session = 1 of 5 unsubscribed pages

Greengairs Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Subscribers see an interactive map with Greengairs Wind Farm and local projects displayed.

( Subscribe for £100 )to have full access to all Wind projects and details.


Subscribe to Wind for exact generator location including nearby generators
For an example of a wind project see: Little Cheyne Court Wind Farm


Subscribe for £500 to include full csv and KML downloads of all Wind project data.

To create a login account see: User Registration. This will allow 30 page views each session rather than 5

One subscription covers your organisation / school / university / company . NOT per user

Greengairs Wind Farm (Wind , Agreed/Planning)

 General Information.

Location in the UK : Scotland, ML6 7TY    
Type of installation: Wind    on/offshore: on
Turbines :9  Capacity : 17.5 MW
Approx Date of 1st power generation:

Subscribe to Renewables Map to see: Wind Turbines make / model / hub height / elevation / latitude and longitude. Accurate data available for 99% of all Active wind farms listed, also cross reference to DECC and OFGEM datasets

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

Infinis Planning Permission Granted The Greengairs wind farm proposal comprises nine turbines with a ground to blade tip height of 125m. The maximum generating capacity of the proposal is 27MW.

 Turbine Make and Specs

For Wind projects, Subscribed version includes Turbine data, average hub height, average elevation
Subscriber Register

 Address

Drumgray Road Greengairs ML6 7TY Scotland

 Associated Companies.

Relationship Company (For: Greengairs )
Developerinfinis

 DECC Data on this Project: Greengairs :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Greengairs Wind Farm     17.5 MW
Energy Type: Wind Onshore
County: Strathclyde     Country: Scotland     LPA: North Lanarkshire Council
Site ID and Reference: 4106 / EN00162     District:
Applicant: Muirhall Energy (formerly Infinis)     Application : 07/00172/FUL (Go to search to find Application)
For Wind Farms  
Number of Turbines: 9 Turbine Capacity: 2
Height of Turbines: Calculated capacity: 18
Site Address: Greengairs Landfill Site Meikle Drumgray Road Greengairs North Lanarkshire
 
County: Strathclyde Region: Scotland
OS Coordinates: 279673 / 279673
Development Status: Planning Permission Expired
Application Submitted: 2/7/2007 Planning Permission Granted
Application Determined: Permission refused:
Construction Date:    
Generator Live This Record Last Updated: 9/23/2020
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Greengairs: Wind :

Site Name: Greengairs Wind Farm
Generator Type: On-shore wind (ROS code = SQ)
Scheme : RO Generator ID: P00245SQSC
Capacity: 26730 Status: Preliminary
Accreditation Date: 2/7/2007    
Commission Date: 6/1/2016    
Applicant: Infinis Wind (Greengairs) Limited
Applicant Address: Infinis Ltd Unit 3 NORTHAMPTON NN4 7YJ England
Address: Drumgray Road Greengairs ML6 7TY Scotland

 Calculations



Alternative Wind Speed: in mph Capacity: start: Optimum: / Stop: / wind: / ratio

Project Info
GREENGAIRS Wind Farm Environmental Statement

Caldercruix windfarm plans are put on hold
Scottish Natural Heritage added that “the combination of Greendykeside, GREENGAIRS and Bracco wind farms would in [our] view create a scattering of moderate and small-scale developments with no cohesive pattern” leading to a “visually confusing scene

Caldercruix windfarm plans are put on hold
Scottish Natural Heritage added that “the combination of Greendykeside, GREENGAIRS and Bracco wind farms would in [our] view create a scattering of moderate and small-scale developments with no cohesive pattern” leading to a “visually confusing scene

©2018 Simon Mallett
Latest News Added
Carn Nicholas
Drone footage
Date and Time of entry: Tuesday, March 19, 2024 00:00

Carn Nicholas Solar Park
The site, developed and constructed by Innova Renewables, was energised earlier this year following the beginning of its construction in May 2022.
Date and Time of entry: Tuesday, March 19, 2024 00:00

Dorset Green
Dorset Green H2 – South West’s first solar to green hydrogen production plant ready to produce clean, zero emission, green renewable energy
Date and Time of entry: Tuesday, March 19, 2024 00:00

Dragon LNG Meadow

Date and Time of entry: Tuesday, March 19, 2024 00:00

Pretoria rd looking towards Ellistown.Solar farm.

Date and Time of entry: Tuesday, March 19, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School