vid = 395pws_id = 352531pws_id = 352531
--------------------------------------------------------
(825) Not Logged on, Max pages: 5( 1 Seen ) ID:3293 Ind:1 IP: 54.162.124.193 {832) YESU WSHW: 1/5
Loading
Page views this IP this session = 1 of 5 unsubscribed pages

Withernwick Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Subscribers see an interactive map with Withernwick Wind Farm and local projects displayed.

( Subscribe for £100 )to have full access to all Wind projects and details.


Subscribe to Wind for exact generator location including nearby generators
For an example of a wind project see: Little Cheyne Court Wind Farm


Subscribe for £500 to include full csv and KML downloads of all Wind project data.

To create a login account see: User Registration. This will allow 30 page views each session rather than 5

One subscription covers your organisation / school / university / company . NOT per user

Withernwick Wind Farm (Wind , Active)

 General Information.

Location in the UK : England, Humberside, North of Aldbrough    
Type of installation: Wind    on/offshore: on
Turbines :9  Capacity : 18 MW
Approx Date of 1st power generation: March 2013

Subscribe to Renewables Map to see: Wind Turbines make / model / hub height / elevation / latitude and longitude. Accurate data available for 99% of all Active wind farms listed, also cross reference to DECC and OFGEM datasets

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

This proposal is for nine 2.0/2.5 MW turbines near the village of Withernwick near Aldbrough, south of Hornsea near the East Yorkshire coast. This proposal would save over 1 million tonnes of carbon dioxide emissions over the 25 year life of the wind farm.

 Turbine Make and Specs

For Wind projects, Subscribed version includes Turbine data, average hub height, average elevation
Subscriber Register

 Address

Withernwick Wind Farm Cowden Lane Withernwick HU11 4UH

 Associated Companies.

Relationship Company (For: Withernwick )
InstallerBlackwell Group
DeveloperEnergiekontor
OperatorEnergiekontor

 DECC Data on this Project: Withernwick :-na-

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Withernwick extension     8.2 MW
Energy Type: Wind Onshore
County: Humberside     Country: England     LPA: East Riding of Yorkshire Council
Site ID and Reference: 4432 / C2584     District:
Applicant: Energiekontor UK     Application : 14/01919/STPLFE (Go to search to find Application)
For Wind Farms  
Number of Turbines: 4 Turbine Capacity: 2.0499999999999998
Height of Turbines: Calculated capacity: 8.2
Site Address: Land North And North East Homer House Aldbrough Road Withernwick East Riding Of Yorkshire
 
County: Humberside Region: Yorkshire and Humber
OS Coordinates: 520743 / 520743
Development Status: Operational
Application Submitted: 6/24/2014 Planning Permission Granted
Application Determined: Permission refused: 6/10/2015
Construction Date: 9/15/2018    
Generator Live 8/1/2019 This Record Last Updated: 11/19/2019
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged: 10/15/2015
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted: 6/10/2015

Site Name: Withernwick     18 MW
Energy Type: Wind Onshore
County: Humberside     Country: England     LPA: East Riding of Yorkshire Council
Site ID and Reference: 3987 / EN00604     District:
Applicant: Energiekontor UK     Application : 08/01964/STPLFE (Go to search to find Application)
For Wind Farms  
Number of Turbines: 9 Turbine Capacity: 2
Height of Turbines: Calculated capacity: 18
Site Address: Land North And North East Homer House Aldbrough Road Withernwick East Riding Of Yorkshire
 
County: Humberside Region: Yorkshire and Humber
OS Coordinates: 520325 / 520325
Development Status: Operational
Application Submitted: 4/4/2008 Planning Permission Granted
Application Determined: Permission refused: 9/2/2008
Construction Date: 4/1/2012    
Generator Live 3/19/2013 This Record Last Updated: 6/3/2013
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted: 9/2/2008

Site Name: Withernwick (withdrawn)     25 MW
Energy Type: Wind Onshore
County: Humberside     Country: England     LPA: East Riding of Yorkshire Council
Site ID and Reference: 2998 / EN00349     District:
Applicant: Energiekontor UK     Application : 07/02271/STPLFE (Go to search to find Application)
For Wind Farms  
Number of Turbines: 11 Turbine Capacity: 1
Height of Turbines: Calculated capacity: 11
Site Address: Land South North And North East Homer House Aldbrough Road Withernwick East Riding Of Yorkshire
 
County: Humberside Region: Yorkshire and Humber
OS Coordinates: 520730 / 520730
Development Status: Planning Application Withdrawn
Application Submitted: 4/5/2007 Planning Permission Granted
Application Determined: Permission refused:
Construction Date:    
Generator Live This Record Last Updated: 6/9/2010
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn: 10/17/2007    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Withernwick: Wind : -na-

 Calculations


Capacity: 36
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 12 m/s (26.844 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 3/29/2024
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 36 start: 5 Optimum: 15/ Stop: 12 / wind: / ratio 352531

Project Info
WITHERNWICK wind farm proposal

Energiekontor: WITHERNWICK

Wind Farm - Too close to homes?

REpower supplies 43.05 MW of wind turbines to Energiekontor UK
The wind turbines will be installed at Energiekontor UK’s wind farms at WITHERNWICK, Yorkshire, and Hyndburn on Oswaldtwistle Moor, Lancashire.

©2018 Simon Mallett
Latest News Added
Carn Nicholas
Drone footage
Date and Time of entry: Tuesday, March 19, 2024 00:00

Carn Nicholas Solar Park
The site, developed and constructed by Innova Renewables, was energised earlier this year following the beginning of its construction in May 2022.
Date and Time of entry: Tuesday, March 19, 2024 00:00

Dorset Green
Dorset Green H2 – South West’s first solar to green hydrogen production plant ready to produce clean, zero emission, green renewable energy
Date and Time of entry: Tuesday, March 19, 2024 00:00

Dragon LNG Meadow

Date and Time of entry: Tuesday, March 19, 2024 00:00

Pretoria rd looking towards Ellistown.Solar farm.

Date and Time of entry: Tuesday, March 19, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School