Page views this IP this session = 1 of 5 unsubscribed pagesWindy Standard Wind Farm
Click here for Generation Forecast for wind farms based on Met office data
Subscribers see an interactive map with Windy Standard Wind Farm and local projects displayed.
( Subscribe for £100 )to have full access to all Wind projects and details.
Subscribe to Wind for exact generator location including nearby generators
For an example of a wind project see: Little Cheyne Court Wind Farm
Subscribe for £500 to include full csv and KML downloads of all Wind project data.
To create a login account see: User Registration. This will allow 30 page views each session rather than 5
One subscription covers your organisation / school / university / company . NOT per user
|
Windy Standard Wind Farm (Wind , Active) Location in the UK : Scotland, Dumfries & Galloway Type of installation: Wind on/offshore: on Turbines :36 Capacity : 21.6 MW Approx Date of 1st power generation: September 1996
Subscribe to Renewables Map to see: Wind Turbines make / model / hub height / elevation / latitude and longitude. Accurate data available for 99% of all Active wind farms listed, also cross reference to DECC and OFGEM datasets
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
Made up of Gallows Rig and Polwhat Rig
Windy Standard became fully operational in November 1996 and at the time was Scotlands second largest wind farm. It consists of 36 wind turbines each of 600 kilowatts (kW) maximum output, manufactured by Nordtank A/S of Denmark. The wind farm has a combined maximum power of 21.6 megawatts (MW).
Agreed: Phase II shown
Proposed Phase III shown
For Wind projects, Subscribed version includes Turbine data, average hub height, average elevation Subscriber Register Brockloch Rig (Windy Standard II) Wind FarmOff the A713 Ayr to Castle Douglas Trunk Road Carsphairn DG7 3TJ Scotland
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Windy Standard III Wind Farm (Brockloch Rig Phase 2) 80.8 MW
|
Energy Type: |
Wind Onshore |
County: |
Dumfries and Galloway Country: Scotland LPA: Scottish Government (S36)
|
Site ID and Reference: |
4615 / B1290
District:
|
Applicant: |
Fred Olsen Renewables
Application :
ECU00000335
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
20 |
Turbine Capacity: |
4 |
Height of Turbines: |
177.5 |
Calculated capacity: |
80 |
Site Address: |
Near New Cummock
|
|
|
County: |
Dumfries and Galloway Region: Scotland
|
OS Coordinates: |
257695 / 257695
|
Development Status: |
Appeal Granted
|
Application Submitted: |
12/9/2016
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
|
|
|
Generator Live |
|
This Record Last Updated: |
9/12/2023
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
3/23/2027 |
|
|
Secretary of State - |
Appeal Lodged: |
5/2/2018 |
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Brochloch Rig (formerly Windy Standard II) 90 MW
|
Energy Type: |
Wind Onshore |
County: |
Dumfries and Galloway Country: Scotland LPA: Scottish Government (S36)
|
Site ID and Reference: |
4431 / N00068W
District:
|
Applicant: |
Fred Olsen Renewables
Application :
02/n/20002
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
30 |
Turbine Capacity: |
3 |
Height of Turbines: |
120 |
Calculated capacity: |
90 |
Site Address: |
Near New Cummock
|
|
|
County: |
Dumfries and Galloway Region: Scotland
|
OS Coordinates: |
260200 / 260200
|
Development Status: |
Operational
|
Application Submitted: |
12/14/2001
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
8/7/2014
|
|
|
Generator Live |
6/15/2017
|
This Record Last Updated: |
2/27/2018
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Brochloch Rig 1 (formerly Windy Standard) 21.6 MW
|
Energy Type: |
Wind Onshore |
County: |
Dumfries and Galloway Country: Scotland LPA: Dumfries and Galloway Council
|
Site ID and Reference: |
4527 / S0001W1
District:
|
Applicant: |
Fred Olsen Renewables
Application :
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
36 |
Turbine Capacity: |
0.59999999999999998 |
Height of Turbines: |
|
Calculated capacity: |
21.6 |
Site Address: |
Windy Standard
|
|
|
County: |
Dumfries and Galloway Region: Scotland
|
OS Coordinates: |
261500 / 261500
|
Development Status: |
Operational
|
Application Submitted: |
7/24/1995
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
|
|
|
Generator Live |
10/1/1996
|
This Record Last Updated: |
9/4/2018
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
MW
|
Energy Type: |
|
County: |
Country: LPA:
|
Site ID and Reference: |
/
District:
|
Applicant: |
Application :
|
(Go to search to find Application) |
Site Address: |
|
|
|
County: |
Region:
|
OS Coordinates: |
/
|
Development Status: |
|
Application Submitted: |
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
|
|
|
Generator Live |
|
This Record Last Updated: |
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Windy Standard II (Brockloch Rig)
|
Generator Type: |
On-shore wind (ROS code = SQ)
|
Scheme : |
RO
|
Generator ID: |
R00299SQSC
|
Capacity: |
61000
|
Status: |
Live
|
Accreditation Date: |
|
|
|
Commission Date: |
7/3/2017
|
|
|
Applicant: |
Fred Olsen Renewables Ltd
|
Applicant Address: |
2nd Floor
64-65 Vincent Square
London
SW1P 2NU
England
|
Address: |
Brockloch Rig (Windy Standard II) Wind Farm
Off the A713 Ayr to Castle Douglas Trunk Road
Carsphairn
DG7 3TJ
Scotland
|
Site Name: |
Windy Standard II (Brockloch Rig)
|
Generator Type: |
Wind
|
Scheme : |
REGO
|
Generator ID: |
G02580NWSC
|
Capacity: |
61000
|
Status: |
Live
|
Accreditation Date: |
|
|
|
Commission Date: |
7/3/2017
|
|
|
Applicant: |
Fred Olsen Renewables Ltd
|
Applicant Address: |
2nd Floor
64-65 Vincent Square
London
SW1P 2NU
England
|
Address: |
Brockloch Rig (Windy Standard II) Wind Farm
Off the A713 Ayr to Castle Douglas Trunk Road
Carsphairn
DG7 3TJ
Scotland
|
|
Assumptions: Capacity: 61000kW 61 MW, Thus over the month Capacity * 720 hours per month = 43920 MWh
|
Output Period |
LECs Issued |
ROCs Issued |
REGO Certs |
Capacity Factor |
Status |
01/03/2018 | | | 18236 | 29.90% | Issued | 01/02/2018 | | | 12533 | 20.55% | Issued | 01/01/2018 | | | 19148 | 31.39% | Issued | 01/12/2017 | | | 13918 | 22.82% | Issued | 01/11/2017 | | | 8780 | 14.39% | Issued | 01/10/2017 | | | 13437 | 22.03% | Issued | 01/09/2017 | | | 8919 | 14.62% | Retired |
|
Capacity: 163.2 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 19 m/s (42.503 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 3/29/2024 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Carn Nicholas Drone footage Date and Time of entry: Tuesday, March 19, 2024 00:00
Carn Nicholas Solar Park The site, developed and constructed by Innova Renewables, was energised earlier this year following the beginning of its construction in May 2022. Date and Time of entry: Tuesday, March 19, 2024 00:00
Dorset Green Dorset Green H2 – South West’s first solar to green hydrogen production plant ready to produce clean, zero emission, green renewable energy Date and Time of entry: Tuesday, March 19, 2024 00:00
Dragon LNG Meadow
Date and Time of entry: Tuesday, March 19, 2024 00:00
Pretoria rd looking towards Ellistown.Solar farm.
Date and Time of entry: Tuesday, March 19, 2024 00:00
|
|
©2017
Simon Mallett |
|