Sorry I found no matches, Please try again. 176
vid = 3792pws_id = 3220pws_id = 3220
--------------------------------------------------------
(825) Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 44.210.107.64 {832) YESU WSHW: 1/10
Loading
Page views this IP this session = 1 of 10 unsubscribed pages

Beckburn Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Subscribers see an interactive map with Beckburn Wind Farm and local projects displayed.

( Subscribe for £100 )to have full access to all Wind projects and details.


Subscribe to Wind for exact generator location including nearby generators
For an example of a wind project see: Little Cheyne Court Wind Farm


Subscribe for £500 to include full csv and KML downloads of all Wind project data.

To create a login account see: User Registration. This will allow 30 page views each session rather than 5

One subscription covers your organisation / school / university / company . NOT per user

Beckburn Wind Farm (Wind , Active)

 General Information.

Location in the UK : England, Cumbria CA6 5NH    
Type of installation: Wind    on/offshore: on
Turbines :9  Capacity : 31 MW
Approx Date of 1st power generation: October 2016

Subscribe to Renewables Map to see: Wind Turbines make / model / hub height / elevation / latitude and longitude. Accurate data available for 99% of all Active wind farms listed, also cross reference to DECC and OFGEM datasets

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

EDF Energy Renewables Planning Permission Grant

 Turbine Make and Specs

For Wind projects, Subscribed version includes Turbine data, average hub height, average elevation
Subscriber Register

 Address

Beck Burn Wind Farm Springfield Longtown CA6 5NH England

 Associated Companies.

Relationship Company (For: Beckburn )
DeveloperEDF Energy Renewables

 DECC Data on this Project: Beckburn :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Beck Burn     31 MW
Energy Type: Wind Onshore
County: Cumbria     Country: England     LPA: Carlisle City Council
Site ID and Reference: 4544 / C2345     District:
Applicant: EDF Energy Renewables     Application : 13/0866 (Go to search to find Application)
For Wind Farms  
Number of Turbines: 9 Turbine Capacity: 3.4500000000000002
Height of Turbines: Calculated capacity: 31.05
Site Address: Beck Burn Peat Works, Springfield, Longtown
  CA6 5NH
County: Cumbria Region: North West
OS Coordinates: 334466 / 334466
Development Status: Operational
Application Submitted: 11/8/2013 Planning Permission Granted
Application Determined: Permission refused:
Construction Date: 4/23/2016    
Generator Live 4/26/2017 This Record Last Updated: 5/2/2017
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date: 4/30/2018    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

Site Name: Beck Burn     18 MW
Energy Type: Wind Onshore
County: Cumbria     Country: England     LPA: Carlisle City Council
Site ID and Reference: 3777 / AA139     District:
Applicant: EDF Energy     Application : 10/1102 (Go to search to find Application)
For Wind Farms  
Number of Turbines: 9 Turbine Capacity: 2
Height of Turbines: Calculated capacity: 18
Site Address: between Gretna and west of Longtown.
 
County: Cumbria Region: North West
OS Coordinates: 334570 / 334570
Development Status: Revised
Application Submitted: 12/13/2010 Planning Permission Granted
Application Determined: Permission refused: 12/16/2011
Construction Date:    
Generator Live This Record Last Updated: 5/29/2014
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused: 5/22/2013
Granted: Appeal Granted: 12/16/2011

 OFGEM Data on this Project: Beckburn: Wind :

Site Name: Beckburn Wind Farm
Generator Type: On-shore wind (RO code = RQ)
Scheme : RO Generator ID: R00377RQEN
Capacity: 30960 Status: Live
Accreditation Date: 12/13/2010    
Commission Date: 3/29/2017    
Applicant: Beck Burn Windfarm Limited
Applicant Address: 40 Grosvenor Place LONDON SW1X 7EN England
Address: Beckburn Wind Farm Springfield Gretna CA6 5NH England

Site Name: Beckburn Wind Farm
Generator Type: Wind
Scheme : REGO Generator ID: G03017NWEN
Capacity: 30960 Status: Live
Accreditation Date: 12/13/2010    
Commission Date: 3/29/2017    
Applicant: Beck Burn Windfarm Limited
Applicant Address: 40 Grosvenor Place LONDON SW1X 7EN England
Address: Beckburn Wind Farm Springfield Gretna CA6 5NH England
 
Assumptions: Capacity: 30960kW 30.96 MW,
Thus over the month Capacity * 720 hours per month = 22291.2 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status
01/03/2018 6354 20.52% Issued
01/02/2018 3358 10.85% Issued
01/01/2018 6665 21.53% Issued
01/12/2017 3991 12.89% Issued
01/11/2017 3556 11.49% Issued
01/10/2017 2559 8.27% Issued
01/09/2017 2694 8.70% Issued
01/08/2017 3573 11.54% Issued
01/07/2017 4155 13.42% Issued
01/06/2017 5971 19.29% Issued
01/05/2017 4080 13.18% Issued
01/04/2017 3911 12.63% Issued
01/03/2017 446 1.44% Issued

 Calculations


Capacity: 62.1
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 25 m/s (55.925 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 3/28/2024
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 62.1 start: 5 Optimum: 15/ Stop: 25 / wind: / ratio 3220

Project Info
EDF: BECKBURN Site Plan

PROJECT OVERVIEW BECK BURN

EDF powers ahead with Vestas
Danish manufacturer Vestas is to supply nine of its V105-3.45MW turbines to EDF for the 31MW Beck Burn wind farm in the north of England. (BECKBURN)

UK: Vestas to supply 31MW BECKBURN
EDF Energies Nouvelles (EDF EN) has placed an order for nine Vestas V105-3.45 MW turbines. They are destined for the 31MW Beck Burn project in Cumbria, north-west England.

©2018 Simon Mallett
Latest News Added
Carn Nicholas
Drone footage
Date and Time of entry: Tuesday, March 19, 2024 00:00

Carn Nicholas Solar Park
The site, developed and constructed by Innova Renewables, was energised earlier this year following the beginning of its construction in May 2022.
Date and Time of entry: Tuesday, March 19, 2024 00:00

Dorset Green
Dorset Green H2 – South West’s first solar to green hydrogen production plant ready to produce clean, zero emission, green renewable energy
Date and Time of entry: Tuesday, March 19, 2024 00:00

Dragon LNG Meadow

Date and Time of entry: Tuesday, March 19, 2024 00:00

Pretoria rd looking towards Ellistown.Solar farm.

Date and Time of entry: Tuesday, March 19, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School