Trysglwyn Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Subscribers see an interactive map with Trysglwyn Wind Farm and local projects displayed.

( Subscribe for £100 )to have full access to all Wind projects and details.


Subscribe to Wind for exact generator location including nearby generators
For an example of a wind project see: Little Cheyne Court Wind Farm


Subscribe for £500 to include full csv and KML downloads of all Wind project data.

To create a login account see: User Registration. This will allow 30 page views each session rather than 5

One subscription covers your organisation / school / university / company . NOT per user

Trysglwyn Wind Farm (Wind , Active)

 General Information.

Location in the UK : Wales, Gwynedd    
Type of installation: Wind    on/offshore: on
Turbines :14  Capacity : 5.6 MW
Approx Date of 1st power generation: July 1996

Subscribe to Renewables Map to see: Wind Turbines make / model / hub height / elevation / latitude and longitude. Accurate data available for 99% of all Active wind farms listed, also cross reference to DECC and OFGEM datasets

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

The Trysglwyn Wind Farm cost approximately £6 million to build of which about a third was spent with regional companies for construction and electrical work

 Turbine Make and Specs

For Wind projects, Subscribed version includes Turbine data, average hub height, average elevation
Subscriber Register

 Address

 Associated Companies.

Relationship Company (For: Trysglwyn )
DeveloperRWE Innogy
OperatorRWE Innogy
OwnerRWE Innogy

 DECC Data on this Project: Trysglwyn :-na-

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Trysglwyn Wind Farm     5.6 MW
Energy Type: Wind Onshore
County: Gwynedd     Country: Wales     LPA: Isle of Anglesey County Council
Site ID and Reference: 2567 / 04054W3     District:
Applicant: RWE npower     Application : (Go to search to find Application)
For Wind Farms  
Number of Turbines: 14 Turbine Capacity: 0.40000000000000002
Height of Turbines: Calculated capacity: 5.6
Site Address: Trysglwyn Fawr Rhosybol Isle of Anglesey Gwynedd
 
County: Gwynedd Region: Wales
OS Coordinates: 244000 / 244000
Development Status: Operational
Application Submitted: 8/8/1992 Planning Permission Granted
Application Determined: Permission refused: 12/10/1993
Construction Date:    
Generator Live 5/1/1996 This Record Last Updated: 12/9/2003
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted: 12/10/1993

 OFGEM Data on this Project: Trysglwyn: Wind : -na-

 Calculations


Capacity: 12.6
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 23 m/s (51.451 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 3/28/2024
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 12.6 start: 5 Optimum: 15/ Stop: 23 / wind: / ratio 354797

Project Info
Turbine Image

National Wind Power

Site Location Map

The wind farms that generate enough power to make a few cups of tea
The Telegraph examined a snapshot of RWE’s own figures on Thursday afternoon last week. One wind farm TRYSGLWYN, which is in Anglesey in Wales, was producing a total of 6 kilowatts (KW) - just enough to boil two kettles each with 3KW of power.

©2018 Simon Mallett
Latest News Added
Carn Nicholas
Drone footage
Date and Time of entry: Tuesday, March 19, 2024 00:00

Carn Nicholas Solar Park
The site, developed and constructed by Innova Renewables, was energised earlier this year following the beginning of its construction in May 2022.
Date and Time of entry: Tuesday, March 19, 2024 00:00

Dorset Green
Dorset Green H2 – South West’s first solar to green hydrogen production plant ready to produce clean, zero emission, green renewable energy
Date and Time of entry: Tuesday, March 19, 2024 00:00

Dragon LNG Meadow

Date and Time of entry: Tuesday, March 19, 2024 00:00

Pretoria rd looking towards Ellistown.Solar farm.

Date and Time of entry: Tuesday, March 19, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School