Loading
Page views this IP this session = 1 of 10 unsubscribed pagesCour Wind Farm
Click here for Generation Forecast for wind farms based on Met office data
Subscribers see an interactive map with Cour Wind Farm and local projects displayed.
( Subscribe for £100 )to have full access to all Wind projects and details.
Subscribe to Wind for exact generator location including nearby generators
For an example of a wind project see: Little Cheyne Court Wind Farm
Subscribe for £500 to include full csv and KML downloads of all Wind project data.
To create a login account see: User Registration. This will allow 30 page views each session rather than 5
One subscription covers your organisation / school / university / company . NOT per user
|
Cour Wind Farm (Wind , Active) Location in the UK : Scotland, Clachan Type of installation: Wind on/offshore: on Turbines :10 Capacity : 23 MW Approx Date of 1st power generation: December 2016
Subscribe to Renewables Map to see: Wind Turbines make / model / hub height / elevation / latitude and longitude. Accurate data available for 99% of all Active wind farms listed, also cross reference to DECC and OFGEM datasets
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
The proposed wind farm comprises 23 turbines with a maximum tip height of 110metres and an installed capacity of around 3.0MW each giving an overall site capacity of 69MW. For Wind projects, Subscribed version includes Turbine data, average hub height, average elevation Subscriber Register Cour Wind Farm Cour Carradale Argyll And Bute PA29 6XS Scotland
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Cour Wind Farm 20.5 MW
|
Energy Type: |
Wind Onshore |
County: |
Strathclyde Country: Scotland LPA: Argyll & Bute Council
|
Site ID and Reference: |
3772 / AA121
District:
|
Applicant: |
Octopus Investments/Blue Energy
Application :
10/00909/PP
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
10 |
Turbine Capacity: |
2.1000000000000001 |
Height of Turbines: |
|
Calculated capacity: |
21 |
Site Address: |
Carradale
Argyll And Bute
|
|
|
County: |
Strathclyde Region: Scotland
|
OS Coordinates: |
181005 / 181005
|
Development Status: |
Operational
|
Application Submitted: |
5/21/2010
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
11/19/2015
|
|
|
Generator Live |
12/1/2016
|
This Record Last Updated: |
4/3/2018
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Cour WF - GP
|
Generator Type: |
Wind
|
Scheme : |
REGO
|
Generator ID: |
G02556NWSC
|
Capacity: |
20068
|
Status: |
Live
|
Accreditation Date: |
5/21/2010
|
|
|
Commission Date: |
10/25/2016
|
|
|
Applicant: |
Cour Wind Farm (Scotland) Limited
|
Applicant Address: |
13 Queens Road
Aberdeen
AB15 4YL
Scotland
|
Address: |
Cour Wind Farm
Cour
PA29 6XS
Scotland
|
|
Assumptions: Capacity: 20068kW 20.068 MW, Thus over the month Capacity * 720 hours per month = 14448.96 MWh
|
Output Period |
LECs Issued |
ROCs Issued |
REGO Certs |
Capacity Factor |
Status |
01/04/2018 | | | 7090 | 35.33% | Issued | 01/03/2018 | | | 8917 | 44.43% | Issued | 01/02/2018 | | | 6693 | 33.35% | Issued | 01/01/2018 | | | 8988 | 44.79% | Issued | 01/12/2017 | | | 6126 | 30.53% | Issued | 01/11/2017 | | | 6326 | 31.52% | Issued | 01/10/2017 | | | 8222 | 40.97% | Issued | 01/09/2017 | | | 5877 | 29.29% | Issued | 01/08/2017 | | | 4265 | 21.25% | Issued | 01/07/2017 | | | 4439 | 22.12% | Issued | 01/06/2017 | | | 5232 | 26.07% | Issued |
|
Capacity: 46 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 25 m/s (55.925 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 4/23/2024 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Carn Nicholas Drone footage Date and Time of entry: Tuesday, March 19, 2024 00:00
Carn Nicholas Solar Park The site, developed and constructed by Innova Renewables, was energised earlier this year following the beginning of its construction in May 2022. Date and Time of entry: Tuesday, March 19, 2024 00:00
Dorset Green Dorset Green H2 – South West’s first solar to green hydrogen production plant ready to produce clean, zero emission, green renewable energy Date and Time of entry: Tuesday, March 19, 2024 00:00
Dragon LNG Meadow
Date and Time of entry: Tuesday, March 19, 2024 00:00
Pretoria rd looking towards Ellistown.Solar farm.
Date and Time of entry: Tuesday, March 19, 2024 00:00
|
|
©2017
Simon Mallett |
|