Sorry I found no matches, Please try again. 176
vid = 35pws_id = 350805pws_id = 350805
--------------------------------------------------------
(825) Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 44.197.238.222 {832) YESU WSHW: 1/10
Loading
Page views this IP this session = 1 of 10 unsubscribed pages

Beinn An Tuirc Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Subscribers see an interactive map with Beinn An Tuirc Wind Farm and local projects displayed.

( Subscribe for £100 )to have full access to all Wind projects and details.


Subscribe to Wind for exact generator location including nearby generators
For an example of a wind project see: Little Cheyne Court Wind Farm


Subscribe for £500 to include full csv and KML downloads of all Wind project data.

To create a login account see: User Registration. This will allow 30 page views each session rather than 5

One subscription covers your organisation / school / university / company . NOT per user

Beinn An Tuirc Wind Farm (Wind , Active)

 General Information.

Location in the UK : Scotland, Argyll & Bute    
Type of installation: Wind    on/offshore: on
Turbines :46  Capacity : 30 MW
Approx Date of 1st power generation: September 2014

Subscribe to Renewables Map to see: Wind Turbines make / model / hub height / elevation / latitude and longitude. Accurate data available for 99% of all Active wind farms listed, also cross reference to DECC and OFGEM datasets

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

Also known as Cnoc Donn Arnicle
Extension : 19 turbines of 2 MW each total 38 MW, Live in 2013

The windfarm incorporates a £2 million habitat management scheme funded by ScottishPower, to enhance foraging habitat for a pair of golden eagles. This is the biggest land management scheme of its type in the UK.

One of the V47 turbines suffered a catastrophic failure in November 2007 when a brake problem led to the tower being bent in two. This was the first incident of an operational turbine tower collapsing in the UK.[4][5] The farm was closed as a precaution, but soon reopened.

 Turbine Make and Specs

For Wind projects, Subscribed version includes Turbine data, average hub height, average elevation
Subscriber Register

 Address

Beinn An Tuirc Windfarm Carradale Mull of Kintyre PA28 6QY Scotland

 Associated Companies.

Relationship Company (For: Beinn An Tuirc )
DeveloperScottish Power Renewables
OperatorScottish Power Renewables
OwnerScottish Power Renewables

 DECC Data on this Project: Beinn An Tuirc :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Beinn an Tuirc Windfarm Phase 3     49.9 MW
Energy Type: Wind Onshore
County: Strathclyde     Country: Scotland     LPA: Argyll & Bute Council
Site ID and Reference: 3387 / B0801     District:
Applicant: Scottish Power Renewables     Application : 15/03057/PP (Go to search to find Application)
For Wind Farms  
Number of Turbines: 19 Turbine Capacity: 2
Height of Turbines: Calculated capacity: 38
Site Address: Beinn An Tuirc Windfarm, Land At Meall Buidhe And South, A Chruach West Of Saddell Kin, Campbeltown, Strathclyde, Scotland
  PA28
County: Strathclyde Region: Scotland
OS Coordinates: 172270 / 172270
Development Status: Under Construction
Application Submitted: 11/3/2015 Planning Permission Granted
Application Determined: Permission refused:
Construction Date: 2/1/2020    
Generator Live This Record Last Updated: 5/28/2020
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date: 2/23/2020    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

Site Name: Beinn an Tuirc Phase 2     43.7 MW
Energy Type: Wind Onshore
County: Strathclyde     Country: Scotland     LPA: Argyll & Bute Council
Site ID and Reference: 4525 / N00312W     District:
Applicant: Scottish Power Renewables     Application : 05/01397/DET (Go to search to find Application)
For Wind Farms  
Number of Turbines: 19 Turbine Capacity: 2.2999999999999998
Height of Turbines: Calculated capacity: 43.7
Site Address: South of original Beinn and Tuirc Nr. Carradale
 
County: Strathclyde Region: Scotland
OS Coordinates: 173950 / 173950
Development Status: Operational
Application Submitted: 7/7/2005 Planning Permission Granted
Application Determined: Permission refused:
Construction Date: 4/1/2010    
Generator Live 9/1/2014 This Record Last Updated: 10/1/2014
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

Site Name: Cnoc Donn Arnicle     15 MW
Energy Type: Wind Onshore
County: Strathclyde     Country: Scotland     LPA: Argyll & Bute Council
Site ID and Reference: 3294 / S0002W2     District:
Applicant: CRE Energy/ Scottish Power     Application : (Go to search to find Application)
For Wind Farms  
Number of Turbines: 26 Turbine Capacity: 0.56999999999999995
Height of Turbines: Calculated capacity: 14.82
Site Address: Situated next to Beinn an Tuirc Kintyre
 
County: Strathclyde Region: Scotland
OS Coordinates: 175200 / 175200
Development Status: Operational
Application Submitted: 4/20/1998 Planning Permission Granted
Application Determined: Permission refused:
Construction Date:    
Generator Live 10/1/2001 This Record Last Updated: 2/3/2010
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

Site Name: Beinn an Tuirc     29.7 MW
Energy Type: Wind Onshore
County: Strathclyde     Country: Scotland     LPA: Argyll & Bute Council
Site ID and Reference: 3292 / S0001W2     District:
Applicant: CRE Energy/ Scottish Power     Application : (Go to search to find Application)
For Wind Farms  
Number of Turbines: 45 Turbine Capacity: 0.66000000000000003
Height of Turbines: Calculated capacity: 29.7
Site Address: Nr. Carradale
 
County: Strathclyde Region: Scotland
OS Coordinates: 173950 / 173950
Development Status: Operational
Application Submitted: 4/20/1998 Planning Permission Granted
Application Determined: Permission refused:
Construction Date:    
Generator Live 12/23/2001 This Record Last Updated: 7/30/2013
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Beinn An Tuirc: Wind :

 Calculations


Capacity: 143.52
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 25 m/s (55.925 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 3/29/2024
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 143.52 start: 5 Optimum: 15/ Stop: 25 / wind: / ratio 350805

Project Info
BEINN AN TUIRC Phase3 Turbine Layout

BEINN AN TUIRC Phase 3

Windfarm impact studies on golden eagles

BEINN AN TUIRC : Scottish Power

BEINN AN TUIRC 2
Windhoist are currently erecting 16 Siemens 2.3MW wind turbines to a hub height of 58.5m at BEINN AN TUIRC Wind Farm in Campbelltown. The picture below is of the first rotor going up. For more images click here

©2018 Simon Mallett
Latest News Added
Carn Nicholas
Drone footage
Date and Time of entry: Tuesday, March 19, 2024 00:00

Carn Nicholas Solar Park
The site, developed and constructed by Innova Renewables, was energised earlier this year following the beginning of its construction in May 2022.
Date and Time of entry: Tuesday, March 19, 2024 00:00

Dorset Green
Dorset Green H2 – South West’s first solar to green hydrogen production plant ready to produce clean, zero emission, green renewable energy
Date and Time of entry: Tuesday, March 19, 2024 00:00

Dragon LNG Meadow

Date and Time of entry: Tuesday, March 19, 2024 00:00

Pretoria rd looking towards Ellistown.Solar farm.

Date and Time of entry: Tuesday, March 19, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School