Loading
Page views this IP this session = 1 of 10 unsubscribed pagesHall Farm Solar Farm
Subscribers see an interactive map with Hall Farm Solar Farm and local projects displayed.
( Subscribe for £100 )to have full access to all Solar projects and details.
Subscribe to Solar for exact generator location including nearby generators
For an example of a solar project see: Lenham Solar Farm
Subscribe for £500 to include full csv and KML downloads of all Solar project data.
To create a login account see: User Registration. This will allow 30 page views each session rather than 5
One subscription covers your organisation / school / university / company . NOT per user
|
Hall Farm Solar Farm (Solar , Active) Location in the UK : England, NR11 8GA Type of installation: Solar on/offshore: on Solar Panels :0 Capacity : 10.5 MW Acreage:60 or approx Hectares : 24 Approx Date of 1st power generation: March 2014
/YES
Land at East Beckham Hall Otters Lane East Beckham Norwich NR11 8GA England
Relationship |
Company (For:
Hall Farm
) |
Sorry I found no matches, Please try again.
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Hall Farm, East Beckham 10.2 MW
|
Energy Type: |
Solar Photovoltaics |
County: |
Norfolk Country: England LPA: North Norfolk District Council
|
Site ID and Reference: |
1329 / C1523
District:
|
Applicant: |
TGC Renewables
Application :
PF/13/0772
|
(Go to search to find Application) |
|
--- For Solar Farms / Parks --- |
Mounting of panels: |
Ground |
|
|
|
--- ----- ---- --- |
Site Address: |
Hall Farm, Land At Hall Farm, East Beckham, Holt, Norfolk, BR11 8GA
|
|
|
County: |
Norfolk Region: Eastern
|
OS Coordinates: |
614370 / 614370
|
Development Status: |
Operational
|
Application Submitted: |
6/27/2013
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
|
|
|
Generator Live |
3/31/2014
|
This Record Last Updated: |
4/30/2014
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Hall Farm Solar Park
|
Generator Type: |
Photovoltaic (RO code = RU)
|
Scheme : |
RO
|
Generator ID: |
R00232RUEN
|
Capacity: |
9540
|
Status: |
Live
|
Accreditation Date: |
6/27/2013
|
|
|
Commission Date: |
3/29/2014
|
|
|
Applicant: |
Hall Solar Ltd
|
Applicant Address: |
2nd Floor
2 City Place
Beehive Ring Road
GATWICK
RH6 0PA
England
|
Address: |
Land at East Beckham Hall
Otters Lane
East Beckham
Norwich
NR11 8GA
England
|
Project Info |
Earls HALL FARM Wind Farm The wind park Earls HALL FARM was acquired by BayWa r.e. from RWE npower in 2010 as part of a longer-term UK pipeline investment.
Huge solar farm plan sparks residents’ fury The development would take place on WoodHALL FARM in Wichenford and include substations, a replacement tower, centre station, inverters, cameras and fencing.
No to solar panels at WoodHALL FARM The proposal is to build a very large solar farm on 75 hectares of productive farm land between Lower Broadheath and Martley.
This would be 180,378 solar panels and the same size as 105 football pitches.
Tasburgh 74-acre solar farm plan gets go-ahead A solar farm development on a 74-acre site in Tasburgh has been given the green light by South Norfolk Council.
The 15 mw development, set for land south of HALL FARM, will provide enough energy for more than 4,200 homes.
re:think energy: HALL FARM SOLAR PROJECT Solar panels will be mounted in wide-spaced south-facing rows and raised one metre above ground to allow sheep to graze freely across the open site.
|
|
©2018
Simon Mallett |
Latest News Added |
Carn Nicholas Drone footage Date and Time of entry: Tuesday, March 19, 2024 00:00
Carn Nicholas Solar Park The site, developed and constructed by Innova Renewables, was energised earlier this year following the beginning of its construction in May 2022. Date and Time of entry: Tuesday, March 19, 2024 00:00
Dorset Green Dorset Green H2 – South West’s first solar to green hydrogen production plant ready to produce clean, zero emission, green renewable energy Date and Time of entry: Tuesday, March 19, 2024 00:00
Dragon LNG Meadow
Date and Time of entry: Tuesday, March 19, 2024 00:00
Pretoria rd looking towards Ellistown.Solar farm.
Date and Time of entry: Tuesday, March 19, 2024 00:00
|
|
©2017
Simon Mallett |
|