Loading
Page views this IP this session = 1 of 10 unsubscribed pagesBenbrack Wind Farm
Click here for Generation Forecast for wind farms based on Met office data
Subscribers see an interactive map with Benbrack Wind Farm and local projects displayed.
( Subscribe for £100 )to have full access to all Wind projects and details.
Subscribe to Wind for exact generator location including nearby generators
For an example of a wind project see: Little Cheyne Court Wind Farm
Subscribe for £500 to include full csv and KML downloads of all Wind project data.
To create a login account see: User Registration. This will allow 30 page views each session rather than 5
One subscription covers your organisation / school / university / company . NOT per user
|
Benbrack Wind Farm (Wind , Proposed) Location in the UK : Scotland, Dalmellington Type of installation: Wind on/offshore: on Turbines :18 Capacity : 59.4 MW Approx Date of 1st power generation:
Subscribe to Renewables Map to see: Wind Turbines make / model / hub height / elevation / latitude and longitude. Accurate data available for 99% of all Active wind farms listed, also cross reference to DECC and OFGEM datasets
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
REQUEST FOR SCOPING OPINION (UNDER ENVIRONMENTAL IMPACT ASSESSMENT (SCOTLAND) REGULATIONS 2011) FOR PROPOSED SECTION 36 APPLICATION FOR PROPOSED WIND FARM DEVELOPMENT COMPRISING OF UP TO 27 NO. WIND TURBINES (EACH OF AN OVERALL MAXIMUM BLADE TIP HEIGHT OF 150M), AND ASSOCIATED WORKS COMPRISING ACCESS TRACKS, PERMANENT ANEMOMETER MAST, ELECTRICITY SUB STATION AND TEMPORARY CONSTRUCTION COMPOUND For Wind projects, Subscribed version includes Turbine data, average hub height, average elevation Subscriber Register
Relationship |
Company (For:
Benbrack
) |
Developer | E.on UK |
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Benbrack Wind Farm 67.1 MW
|
Energy Type: |
Wind Onshore |
County: |
East Ayrshire Country: Scotland LPA: Scottish Government (S36)
|
Site ID and Reference: |
3503 / AA996
District:
|
Applicant: |
E.ON Renewables / Red Rock Power Limited
Application :
EC00002082
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
15 |
Turbine Capacity: |
4.5 |
Height of Turbines: |
149.90000000000001 |
Calculated capacity: |
67.5 |
Site Address: |
Near Carsphairn and Dalmellington
|
|
|
County: |
East Ayrshire Region: Scotland
|
OS Coordinates: |
253199 / 253199
|
Development Status: |
Under Construction
|
Application Submitted: |
11/20/2014
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
8/1/2022
|
|
|
Generator Live |
|
This Record Last Updated: |
10/27/2022
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
11/5/2024 |
|
|
Secretary of State - |
Appeal Lodged: |
11/19/2015 |
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
|
Generator Type: |
|
Scheme : |
|
Generator ID: |
|
Capacity: |
|
Status: |
|
Accreditation Date: |
11/20/2014
|
|
|
Commission Date: |
|
|
|
Applicant: |
|
Applicant Address: |
|
Address: |
|
Project Info |
Loch Urr and BENBRACK wind farm bids submitted Energy firm E.On has submitted applications for two south of Scotland wind farms totalling 44 turbines.
Both are in Dumfries and Galloway - one at BENBRACK, north east of Carsphairn, and the other at Loch Urr, south west of Moniaive.
|
|
©2018
Simon Mallett |
Latest News Added |
Carn Nicholas Drone footage Date and Time of entry: Tuesday, March 19, 2024 00:00
Carn Nicholas Solar Park The site, developed and constructed by Innova Renewables, was energised earlier this year following the beginning of its construction in May 2022. Date and Time of entry: Tuesday, March 19, 2024 00:00
Dorset Green Dorset Green H2 – South West’s first solar to green hydrogen production plant ready to produce clean, zero emission, green renewable energy Date and Time of entry: Tuesday, March 19, 2024 00:00
Dragon LNG Meadow
Date and Time of entry: Tuesday, March 19, 2024 00:00
Pretoria rd looking towards Ellistown.Solar farm.
Date and Time of entry: Tuesday, March 19, 2024 00:00
|
|
©2017
Simon Mallett |
|