Loading
Page views this IP this session = 1 of 10 unsubscribed pagesInverclyde Wind Farm
Click here for Generation Forecast for wind farms based on Met office data
Subscribers see an interactive map with Inverclyde Wind Farm and local projects displayed.
( Subscribe for £100 )to have full access to all Wind projects and details.
Subscribe to Wind for exact generator location including nearby generators
For an example of a wind project see: Little Cheyne Court Wind Farm
Subscribe for £500 to include full csv and KML downloads of all Wind project data.
To create a login account see: User Registration. This will allow 30 page views each session rather than 5
One subscription covers your organisation / school / university / company . NOT per user
|
Inverclyde Wind Farm (Wind , Agreed/Planning) Location in the UK : Scotland, greenock Type of installation: Wind on/offshore: on Turbines :8 Capacity : 24 MW Approx Date of 1st power generation:
Subscribe to Renewables Map to see: Wind Turbines make / model / hub height / elevation / latitude and longitude. Accurate data available for 99% of all Active wind farms listed, also cross reference to DECC and OFGEM datasets
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
The proposal includes 10 wind turbines with associated infrastructure including:
• 10, three bladed, horizontal axis wind turbines, each up to a maximum blade tip height of 110 m (above ground level), rated at between 2 MW and 3 MW each, and with a maximum hub height of 65 m, all located to the west of the B788;
• external turbine transformers and turbine switchgear next to each turbine;
• a stone hardstanding area at each turbine location for use by the cranes erecting each turbine; Known as Corlic Hill For Wind projects, Subscribed version includes Turbine data, average hub height, average elevation Subscriber Register Corlic Hill, near Greenock & Port Glasgow
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Inverclyde Wind Farm (Corlic Hill) 24 MW
|
Energy Type: |
Wind Onshore |
County: |
Strathclyde Country: Scotland LPA: Inverclyde Council
|
Site ID and Reference: |
4200 / B0645
District:
|
Applicant: |
BayWa r.e. (formerly Forsa)
Application :
13/0199/IC
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
8 |
Turbine Capacity: |
3 |
Height of Turbines: |
|
Calculated capacity: |
24 |
Site Address: |
Corlic Hill, near Greenock & Port Glasgow
|
|
|
County: |
Strathclyde Region: Scotland
|
OS Coordinates: |
229563 / 229563
|
Development Status: |
Operational
|
Application Submitted: |
7/8/2013
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
12/4/2014
|
Construction Date: |
5/15/2019
|
|
|
Generator Live |
2/20/2021
|
This Record Last Updated: |
4/12/2021
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
3/3/2015 |
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
12/4/2014 |
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Carn Nicholas Drone footage Date and Time of entry: Tuesday, March 19, 2024 00:00
Carn Nicholas Solar Park The site, developed and constructed by Innova Renewables, was energised earlier this year following the beginning of its construction in May 2022. Date and Time of entry: Tuesday, March 19, 2024 00:00
Dorset Green Dorset Green H2 – South West’s first solar to green hydrogen production plant ready to produce clean, zero emission, green renewable energy Date and Time of entry: Tuesday, March 19, 2024 00:00
Dragon LNG Meadow
Date and Time of entry: Tuesday, March 19, 2024 00:00
Pretoria rd looking towards Ellistown.Solar farm.
Date and Time of entry: Tuesday, March 19, 2024 00:00
|
|
©2017
Simon Mallett |
|