Sorry I found no matches, Please try again. 176
vid = 3326pws_id = 353271pws_id = 353271 Sorry I found no matches, Please try again.

--------------------------------------------------------
(825) Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 18.226.251.68 {832) YESU WSHW: 1/10
Loading
Page views this IP this session = 1 of 10 unsubscribed pages

Vine Farm Solar Farm

Subscribers see an interactive map with Vine Farm Solar Farm and local projects displayed.

( Subscribe for £100 )to have full access to all Solar projects and details.


Subscribe to Solar for exact generator location including nearby generators
For an example of a solar project see: Lenham Solar Farm


Subscribe for £500 to include full csv and KML downloads of all Solar project data.

To create a login account see: User Registration. This will allow 30 page views each session rather than 5

One subscription covers your organisation / school / university / company . NOT per user

Vine Farm Solar Farm (Solar , Active)

 General Information.

Location in the UK : England, SG8 0HJ    
Type of installation: Solar    on/offshore: on
Solar Panels :0  Capacity : 46 MW
Approx Date of 1st power generation: March 2016

/YES

 Comment

installed DC capacity is actually 45.916MWp. Ofgem show it as 38MW

 Address

Vine Farm, High Street, Shingay Cum Wendy, Royston, Cambridgeshire

 Associated Companies.

Relationship Company (For: Vine Farm )
ConsultantBayWa r.e. UK Ltd
AgentLDA Design

 DECC Data on this Project: Vine Farm :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Vine Farm Solar Park     45 MW
Energy Type: Solar Photovoltaics
County: Cambridgeshire     Country: England     LPA: South Cambridgeshire District Council
Site ID and Reference: 2329 / B1293     District:
Applicant: Allianz     Application : S/1067/14/FL (Go to search to find Application)
--- For Solar Farms / Parks ---
Mounting of panels: Ground
--- ----- ---- ---
Site Address: Vine House, Vine Farm, High Street, Shingay Cum Wendy, Royston
  SG8 0HJ
County: Cambridgeshire Region: Eastern
OS Coordinates: 532326 / 532326
Development Status: Operational
Application Submitted: 5/9/2014 Planning Permission Granted
Application Determined: Permission refused:
Construction Date: 8/1/2015    
Generator Live 3/15/2016 This Record Last Updated: 2/2/2017
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date: 9/2/2017    
Secretary of State - Appeal Lodged:
Called In: 8/6/2014 Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: 9/2/2014 Appeal Granted:

 OFGEM Data on this Project: Vine Farm: Solar :

Site Name: Vine Farm Solar Park
Generator Type: Photovoltaic (RO code = RU)
Scheme : RO Generator ID: R00738RUEN
Capacity: 38181.6 Status: Live
Accreditation Date: 5/9/2014    
Commission Date: 3/15/2016    
Applicant: Vine Farm Solar Wendy Limited
Applicant Address: 22 Chancery Lane London WC2A 1LS England
Address: Vine Farm Shingay Cum Wendy Royston SG8 0HJ England

Site Name: Vine Farm Solar Park
Generator Type: Photovoltaic
Scheme : REGO Generator ID: G07336PVEN
Capacity: 38181.6 Status: Live
Accreditation Date: 5/9/2014    
Commission Date: 3/15/2016    
Applicant: Vine Farm Solar Wendy Limited
Applicant Address: 22 Chancery Lane London WC2A 1LS England
Address: Vine Farm Shingay Cum Wendy Royston SG8 0HJ England
 
Assumptions: Capacity: 38181.6kW 38.1816 MW,
Thus over the month Capacity * 720 hours per month = 27490.752 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status
01/04/2018 4012 10.51% Issued
01/03/2018 2910 7.62% Issued
01/02/2018 2427 6.36% Issued
01/01/2018 1186 3.11% Issued
01/12/2017 978 2.56% Issued
01/11/2017 1751 4.59% Issued
01/10/2017 2610 6.84% Issued
01/09/2017 3721 9.75% Issued
01/08/2017 5192 13.60% Issued
01/07/2017 5933 15.54% Issued
01/06/2017 6530 17.10% Issued
01/05/2017 5925 15.52% Issued
01/04/2017 5556 14.55% Issued
01/03/2017 3987 10.44% Redeemed
01/02/2017 1713 4.49% Redeemed
01/01/2017 1350 3.54% Redeemed
Dec-16 01468 1159 3.04% Issued
Nov-16 02187 1682 4.41% Issued
Oct-16 03981 3063 8.02% Issued
Sep-16 04980 3859 10.11% Issued
Aug-16 07242 5571 14.59% Issued
Jul-16 08406 6466 16.93% Issued
Jul-16 08406 6466 16.93% Issued
Jun-16 06996 0 0.00% Issued
May-16 08391 6454 16.90% Issued
Apr-16 07008 5423 14.20% Issued
Mar-16 01376 1129 2.96% Issued

Project Info
Eric Pickles to have final say on 88-hectare solar farm at Shingay-cum-Wendy
Developers UK Solar Provider are intending to build the extensive renewable energy project at VINE FARM, Shingay-cum-Wendy.

Huge solar farm spanning 250 acres planned for Crow country
Developers UK Solar Power are seeking permission to build the farm at VINE FARM, Shingay-cum-Wendy. The farm would stretch from Wendy to the edge of Bassingbourn Barracks.

©2018 Simon Mallett
Latest News Added
Carn Nicholas
Drone footage
Date and Time of entry: Tuesday, March 19, 2024 00:00

Carn Nicholas Solar Park
The site, developed and constructed by Innova Renewables, was energised earlier this year following the beginning of its construction in May 2022.
Date and Time of entry: Tuesday, March 19, 2024 00:00

Dorset Green
Dorset Green H2 – South West’s first solar to green hydrogen production plant ready to produce clean, zero emission, green renewable energy
Date and Time of entry: Tuesday, March 19, 2024 00:00

Dragon LNG Meadow

Date and Time of entry: Tuesday, March 19, 2024 00:00

Pretoria rd looking towards Ellistown.Solar farm.

Date and Time of entry: Tuesday, March 19, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School