Sorry I found no matches, Please try again. 176
vid = 321pws_id = 3503pws_id = 3503
--------------------------------------------------------
(825) Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 100.26.140.179 {832) YESU WSHW: 1/10
Loading
Page views this IP this session = 1 of 10 unsubscribed pages

Rheidol Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Subscribers see an interactive map with Rheidol Wind Farm and local projects displayed.

( Subscribe for £100 )to have full access to all Wind projects and details.


Subscribe to Wind for exact generator location including nearby generators
For an example of a wind project see: Little Cheyne Court Wind Farm


Subscribe for £500 to include full csv and KML downloads of all Wind project data.

To create a login account see: User Registration. This will allow 30 page views each session rather than 5

One subscription covers your organisation / school / university / company . NOT per user

Rheidol Wind Farm (Wind , Active)

 General Information.

Location in the UK : Wales, Ceredigion    
Type of installation: Wind    on/offshore: on
Turbines :8  Capacity : 2.4 MW
Approx Date of 1st power generation: 1997

Subscribe to Renewables Map to see: Wind Turbines make / model / hub height / elevation / latitude and longitude. Accurate data available for 99% of all Active wind farms listed, also cross reference to DECC and OFGEM datasets

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

Siemens ( Bonus B33/300 (power 300 kW, diameter 33 m)
It was constructed by Renewable Energy Systems Ltd. for PowerGen in 1997 and began generating in January 1997.

Rheidol wind farm is contracted to supply power to the National Grid under the 1994 Non Fossil Fuel Obligation (NFFO).

 Turbine Make and Specs

For Wind projects, Subscribed version includes Turbine data, average hub height, average elevation
Subscriber Register

 Address

Rheidol Wind Farm Banc Bwa-drainnr Lywernog Aberystwyth SY23 3AB Wales

 Associated Companies.

Relationship Company (For: Rheidol )
Operatorinfinis
Ownerinfinis
DeveloperRES Renewable Energy Systems Ltd

 DECC Data on this Project: Rheidol :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Rheidol Wind Farm     2.4 MW
Energy Type: Wind Onshore
County: Dyfed     Country: Wales     LPA: Ceredigion County Council
Site ID and Reference: 3552 / 04037W3     District:
Applicant: Powergen     Application : (Go to search to find Application)
For Wind Farms  
Number of Turbines: 8 Turbine Capacity: 0.29999999999999999
Height of Turbines: Calculated capacity: 2.4
Site Address: Rheidol Wind Farm , Banc Bwa Drain , Goginan , Aberystwyth
  SW23 3PQ
County: Dyfed Region: Wales
OS Coordinates: 272400 / 272400
Development Status: Operational
Application Submitted: 8/1/1991 Planning Permission Granted
Application Determined: Permission refused:
Construction Date:    
Generator Live 2/6/1997 This Record Last Updated: 12/8/2003
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Rheidol: Wind :

Site Name: RHEIDOL WINDFARM
Generator Type: On-shore wind (RO code = RQ)
Scheme : RO Generator ID: R00011RQWA
Capacity: 2385 Status: Live
Accreditation Date: 8/1/1991    
Commission Date: 2/1/1997    
Applicant: Rheidol Wind Farm Limited
Applicant Address: Infinis Wind Services Ltd. 50 Fredrick Street Edinburgh EH2 1EX Scotland
Address: Rheidol Wind Farm Banc Bwa-drainnr Lywernog Aberystwyth SY23 3AB Wales

Site Name: RHEIDOL WINDFARM
Generator Type: Wind
Scheme : REGO Generator ID: G00218NWWA
Capacity: 2385 Status: Live
Accreditation Date: 8/1/1991    
Commission Date: 2/1/1997    
Applicant: Rheidol Wind Farm Limited
Applicant Address: Infinis Wind Services Ltd. 50 Fredrick Street Edinburgh EH2 1EX Scotland
Address: Rheidol Wind Farm Banc Bwa-drainnr Lywernog Aberystwyth SY23 3AB Wales
 
Assumptions: Capacity: 2385kW 2.385 MW,
Thus over the month Capacity * 720 hours per month = 1717.2 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status
01/04/2018 484 20.29% Issued
01/02/2018 570 23.90% Issued
01/01/2018 863 36.18% Issued
01/12/2017 597 25.03% Issued
01/11/2017 430 18.03% Issued
01/10/2017 650 27.25% Issued
01/09/2017 260 10.90% Issued
01/08/2017 297 12.45% Issued
01/07/2017 291 12.20% Issued
01/06/2017 434 18.20% Issued
01/05/2017 404 16.94% Issued
01/04/2017 229 9.60% Issued
01/03/2017 698 29.27% Redeemed
01/02/2017 690 28.93% Redeemed
01/01/2017 444 18.62% Redeemed
Dec-16 0448 451 18.91% Issued
Nov-16 0475 475 19.92% Issued
Oct-16 0436 439 18.41% Issued
Sep-16 0392 395 16.56% Issued
Aug-16 0409 412 17.27% Issued
Jul-16 0325 328 13.75% Issued
Jul-16 0325 328 13.75% Issued
Jun-16 0157 162 6.79% Issued
Jun-16 0157 162 6.79% Issued
May-16 0317 320 13.42% Issued
Apr-16 0392 395 16.56% Issued
Mar-16 0440 443 18.57% Redeemed
Feb-16 0622 622 26.08% Redeemed
Jan-16 0696 696 29.18% Redeemed
Dec-15 0977 977 40.96% Redeemed
Nov-15 0741 741 31.07% Redeemed
Oct-15 0289 293 12.29% Redeemed
Sep-15 0242 245 10.27% Redeemed
Aug-15 0291 295 12.37% Redeemed
Jul-15 375372 375 15.72% Redeemed
Jun-15 337334 337 14.13% Redeemed
May-15 594593 593 24.86% Redeemed
Apr-15 409406 409 17.15% Redeemed
Mar-15 661662 662 27.76% Redeemed
Feb-15 458455 458 19.20% Redeemed
Jan-15 801801 801 33.58% Redeemed
Dec-14 797797 797 33.42% Redeemed
Nov-14 503499 502 21.05% Redeemed
Oct-14 723723 723 30.31% Redeemed
Sep-14 187183 187 7.84% Redeemed
Aug-14 484481 484 20.29% Redeemed
Jul-14 192187 193 8.09% Redeemed
Jun-14 136130 136 5.70% Redeemed
May-14 398394 398 16.69% Redeemed
Apr-14 359355 359 15.05% Redeemed
Mar-14 500500 500 20.96% Redeemed
Feb-14 780780 780 32.70% Redeemed
Jan-14 657657 656 27.51% Redeemed
Dec-13 825825 825 34.59% Redeemed
Nov-13 359355 359 15.05% Redeemed
Oct-13 676675 675 28.30% Redeemed
Sep-13 356352 356 14.93% Redeemed
Aug-13 273270 274 11.49% Redeemed
Jul-13 202197 202 8.47% Redeemed
Jun-13 451448 451 18.91% Redeemed
May-13 503499 503 21.09% Redeemed
Apr-13 641641 641 26.88% Redeemed
Mar-13 651651 651 27.30% Redeemed
Feb-13 486486 486 20.38% Redeemed
Jan-13 622622 622 26.08% Redeemed
Dec-12 698698 698 29.27% Redeemed
Nov-12 432429 432 18.11% Redeemed
Oct-12 541539 541 22.68% Redeemed
Sep-12 456453 455 19.08% Redeemed
Aug-12 399396 399 16.73% Redeemed
Jul-12 276271 276 11.57% Redeemed
Jun-12 925925 925 38.78% Redeemed
May-12 810810 810 33.96% Redeemed
Apr-12 759759 759 31.82% Redeemed
Mar-12 314312 314 13.17% Expired
Feb-12 6362 63 2.64% Redeemed
Jan-12 796796 796 33.38% Redeemed
Dec-11 10281029 1029 43.14% Redeemed
Nov-11 664664 664 27.84% Redeemed
Oct-11 703702 702 29.43% Redeemed
Sep-11 658658 658 27.59% Redeemed
Aug-11 267262 267 11.19% Redeemed
Jul-11 229225 229 9.60% Redeemed
Jun-11 320318 320 13.42% Redeemed
May-11 810810 810 33.96% Redeemed
Apr-11 379377 379 15.89% Redeemed
Mar-11 339335 339 14.21% Redeemed
Feb-11 480477 480 20.13% Redeemed
Jan-11 476473 476 19.96% Redeemed
Dec-10 322318 321 13.46% Redeemed
Nov-10 544542 545 22.85% Redeemed
Oct-10 577576 576 24.15% Redeemed

 Calculations


Capacity: 4.8
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 25 m/s (55.925 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 3/28/2024
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 4.8 start: 5 Optimum: 15/ Stop: 25 / wind: / ratio 3503

Project Info
©2018 Simon Mallett
Latest News Added
Carn Nicholas
Drone footage
Date and Time of entry: Tuesday, March 19, 2024 00:00

Carn Nicholas Solar Park
The site, developed and constructed by Innova Renewables, was energised earlier this year following the beginning of its construction in May 2022.
Date and Time of entry: Tuesday, March 19, 2024 00:00

Dorset Green
Dorset Green H2 – South West’s first solar to green hydrogen production plant ready to produce clean, zero emission, green renewable energy
Date and Time of entry: Tuesday, March 19, 2024 00:00

Dragon LNG Meadow

Date and Time of entry: Tuesday, March 19, 2024 00:00

Pretoria rd looking towards Ellistown.Solar farm.

Date and Time of entry: Tuesday, March 19, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School