Galawhistle Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Subscribers see an interactive map with Galawhistle Wind Farm and local projects displayed.

( Subscribe for £100 )to have full access to all Wind projects and details.


Subscribe to Wind for exact generator location including nearby generators
For an example of a wind project see: Little Cheyne Court Wind Farm


Subscribe for £500 to include full csv and KML downloads of all Wind project data.

To create a login account see: User Registration. This will allow 30 page views each session rather than 5

One subscription covers your organisation / school / university / company . NOT per user

Galawhistle Wind Farm (Wind , Active)

 General Information.

Location in the UK : Scotland, Muirkirk    
Type of installation: Wind    on/offshore: on
Turbines :22  Capacity : 55 MW
Approx Date of 1st power generation: February 2017

Subscribe to Renewables Map to see: Wind Turbines make / model / hub height / elevation / latitude and longitude. Accurate data available for 99% of all Active wind farms listed, also cross reference to DECC and OFGEM datasets

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

The consent for Galawhistle wind farm allows for construction and operation of twenty two turbines, with maximum ground to blade tip heights of 121.2m (four turbines) and 110.2m (eighteen turbines). The maximum consented generating capacity of the wind farm will be 55MW. Other items that will form part of the wind farm will be a meteorological mast, a crane hardstanding beside each wind turbine, electrical substations and control buildings, and access tracks.

 Turbine Make and Specs

For Wind projects, Subscribed version includes Turbine data, average hub height, average elevation
Subscriber Register

 Address

Galawhistle Wind Farm Glenbuck Nr DouglasSouth Lanarkshire KA18 3SB

 Associated Companies.

Relationship Company (For: Galawhistle )
Developerinfinis
Ownerinfinis
Operatorinfinis

 DECC Data on this Project: Galawhistle :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Galawhistle     66 MW
Energy Type: Wind Onshore
County: Strathclyde     Country: Scotland     LPA: Scottish Government (S36)
Site ID and Reference: 4368 / A0348     District:
Applicant: Ventient (formerly Infinis)     Application : (Go to search to find Application)
For Wind Farms  
Number of Turbines: 22 Turbine Capacity: 3
Height of Turbines: Calculated capacity: 66
Site Address: 7km east of Muirkirk in East Ayrshire and 4km west of Douglas in South Lanarkshire
 
County: Strathclyde Region: Scotland
OS Coordinates: 275440 / 275440
Development Status: Operational
Application Submitted: 3/12/2010 Planning Permission Granted
Application Determined: Permission refused:
Construction Date: 6/18/2015    
Generator Live 2/15/2017 This Record Last Updated: 11/7/2022
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date: 8/8/2017    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Galawhistle: Wind :

Site Name: Galawhistle Windfarm Limited
Generator Type: On-shore wind (ROS code = SQ)
Scheme : RO Generator ID: R00240SQSC
Capacity: 55200 Status: Live
Accreditation Date: 3/12/2010    
Commission Date: 12/20/2016    
Applicant: Galawhistle Wind Farm Limited
Applicant Address: Infinis Wind Services Ltd 50 Fredrick Street Edinburgh EH2 1EX Scotland
Address: Galawhistle Wind Farm Glenbuck Nr Douglas South Lanarkshire KA18 3SB Scotland

Site Name: Galawhistle Windfarm Limited
Generator Type: Wind
Scheme : REGO Generator ID: G02546NWSC
Capacity: 55200 Status: Live
Accreditation Date: 3/12/2010    
Commission Date: 12/20/2016    
Applicant: Galawhistle Wind Farm Limited
Applicant Address: Infinis Wind Services Ltd 50 Fredrick Street Edinburgh EH2 1EX Scotland
Address: Galawhistle Wind Farm Glenbuck Nr Douglas South Lanarkshire KA18 3SB Scotland
 
Assumptions: Capacity: 55200kW 55.2 MW,
Thus over the month Capacity * 720 hours per month = 39744 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status
01/04/2018 13805 25.01% Issued
01/03/2018 15278 27.68% Issued
01/02/2018 13045 23.63% Issued
01/01/2018 20706 37.51% Issued
01/12/2017 15630 28.32% Issued
01/11/2017 13140 23.80% Issued
01/10/2017 19271 34.91% Issued
01/09/2017 10823 19.61% Issued
01/08/2017 10214 18.50% Issued
01/07/2017 9718 17.61% Issued
01/06/2017 4 0.01% Issued
01/04/2017 14390 26.07% Issued
01/01/2017 7270 13.17% Redeemed
Dec-16 0397 472 0.86% Pending Tr

 Calculations


Capacity: 110
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 25 m/s (55.925 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 4/25/2024
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 110 start: 5 Optimum: 15/ Stop: 25 / wind: / ratio 352266

Project Info
Infinis: GALAWHISTLE Wind Farm

Clean bill of health for GALAWHISTLE
Infinis has been given the all clear to build the 55MW GALAWHISTLE wind farm in Central Scotland.

GALAWHISTLE wind farm approved in UK
Infinis Plc., a UK-based energy production company, has secured an approval from the Scottish government for the construction and operation of GALAWHISTLE wind farm in Scotland.

©2018 Simon Mallett
Latest News Added
Carn Nicholas
Drone footage
Date and Time of entry: Tuesday, March 19, 2024 00:00

Carn Nicholas Solar Park
The site, developed and constructed by Innova Renewables, was energised earlier this year following the beginning of its construction in May 2022.
Date and Time of entry: Tuesday, March 19, 2024 00:00

Dorset Green
Dorset Green H2 – South West’s first solar to green hydrogen production plant ready to produce clean, zero emission, green renewable energy
Date and Time of entry: Tuesday, March 19, 2024 00:00

Dragon LNG Meadow

Date and Time of entry: Tuesday, March 19, 2024 00:00

Pretoria rd looking towards Ellistown.Solar farm.

Date and Time of entry: Tuesday, March 19, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School