Loading
Page views this IP this session = 1 of 10 unsubscribed pagesAuchleand Wind Farm
Click here for Generation Forecast for wind farms based on Met office data
Subscribers see an interactive map with Auchleand Wind Farm and local projects displayed.
( Subscribe for £100 )to have full access to all Wind projects and details.
Subscribe to Wind for exact generator location including nearby generators
For an example of a wind project see: Little Cheyne Court Wind Farm
Subscribe for £500 to include full csv and KML downloads of all Wind project data.
To create a login account see: User Registration. This will allow 30 page views each session rather than 5
One subscription covers your organisation / school / university / company . NOT per user
|
Auchleand Wind Farm (Wind , Proposed) Location in the UK : Scotland, newton stewart Type of installation: Wind on/offshore: on Turbines :7 Capacity : 23.8 MW Approx Date of 1st power generation:
Subscribe to Renewables Map to see: Wind Turbines make / model / hub height / elevation / latitude and longitude. Accurate data available for 99% of all Active wind farms listed, also cross reference to DECC and OFGEM datasets
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
Auchleand Community Wind Farm would consist of up to 14 wind turbines, each with a typical blade tip height of 130 metres (m). In addition there will be associated infrastructure, including a substation and control room building and compound, onsite access tracks, an anemometer mast, a temporary construction and storage compound, and borrow pits.
Reduced from 14 to 7 turbines For Wind projects, Subscribed version includes Turbine data, average hub height, average elevation Subscriber Register
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
AUCHLEAND FARM Wind Farm 23.8 MW
|
Energy Type: |
Wind Onshore |
County: |
Dumfries and Galloway Country: Scotland LPA: Dumfries and Galloway Council
|
Site ID and Reference: |
4461 / B0325
District:
|
Applicant: |
Community Windpower
Application :
13/P/1/0366
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
7 |
Turbine Capacity: |
3.3999999999999999 |
Height of Turbines: |
|
Calculated capacity: |
23.8 |
Site Address: |
Auchleand Farm, Wigtown
|
|
|
County: |
Dumfries and Galloway Region: Scotland
|
OS Coordinates: |
240184 / 240184
|
Development Status: |
Planning Application Withdrawn
|
Application Submitted: |
12/9/2013
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
|
|
|
Generator Live |
|
This Record Last Updated: |
8/3/2016
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
7/5/2016 |
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Carn Nicholas Drone footage Date and Time of entry: Tuesday, March 19, 2024 00:00
Carn Nicholas Solar Park The site, developed and constructed by Innova Renewables, was energised earlier this year following the beginning of its construction in May 2022. Date and Time of entry: Tuesday, March 19, 2024 00:00
Dorset Green Dorset Green H2 – South West’s first solar to green hydrogen production plant ready to produce clean, zero emission, green renewable energy Date and Time of entry: Tuesday, March 19, 2024 00:00
Dragon LNG Meadow
Date and Time of entry: Tuesday, March 19, 2024 00:00
Pretoria rd looking towards Ellistown.Solar farm.
Date and Time of entry: Tuesday, March 19, 2024 00:00
|
|
©2017
Simon Mallett |
|