Hoback Solar Farm

Subscribers see an interactive map with Hoback Solar Farm and local projects displayed.

( Subscribe for £100 )to have full access to all Solar projects and details.


Subscribe to Solar for exact generator location including nearby generators
For an example of a solar project see: Lenham Solar Farm


Subscribe for £500 to include full csv and KML downloads of all Solar project data.

To create a login account see: User Registration. This will allow 30 page views each session rather than 5

One subscription covers your organisation / school / university / company . NOT per user

Hoback Solar Farm (Solar , Active)

 General Information.

Location in the UK : England, Meldreth    
Type of installation: Solar    on/offshore: on
Solar Panels :0  Capacity : 17.5 MW
Acreage:82   or approx Hectares : 32.8
Approx Date of 1st power generation: April 2013

/YES

 Comment

Up and running, comment from solar farmers / user capacity = 17.524MW
Potential: Equates to consumption of 3,356 houses per annum.
Hoback Farm, 81 Cambridge Road, Wimpole, Royston, Cambridgeshire, SG8 5QB Full Description: Construction of Solar PV Development to include installation of ground based racking systems, mounted solar panels, power inverter stations, transformer stations, substation, fencing and associated access gates, and CCTV cameras mounted on free standing support poles. Status: Registered Comment:

 Address

81 Cambridge Road, Wimpole, Royston, Cambridgeshire, SG8 5QB

 Associated Companies.

Relationship Company (For: Hoback )
DeveloperTGC Renewables Ltd

 DECC Data on this Project: Hoback :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Hoback Farm     13.1 MW
Energy Type: Solar Photovoltaics
County: Cambridgeshire     Country: England     LPA: South Cambridgeshire District Council
Site ID and Reference: 1875 / IF1323     District:
Applicant: TGC Renewables     Application : S/0155/13/FL (Go to search to find Application)
--- For Solar Farms / Parks ---
Mounting of panels: Ground
--- ----- ---- ---
Site Address: 81 Cambridge Road, Wimpole, Royston, Cambridgeshire
  SG8 5QB
County: Cambridgeshire Region: Eastern
OS Coordinates: 535036 / 535036
Development Status: Operational
Application Submitted: 2/14/2013 Planning Permission Granted
Application Determined: Permission refused:
Construction Date: 8/1/2014    
Generator Live 11/1/2014 This Record Last Updated: 11/26/2014
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Hoback: Solar :

Site Name: Hoback Solar Farm
Generator Type: Photovoltaic (RO code = RU)
Scheme : RO Generator ID: R00378RUEN
Capacity: 12950 Status: Live
Accreditation Date: 2/14/2013    
Commission Date: 11/3/2014    
Applicant: Hoback Solar Ltd
Applicant Address: 2nd floor 2 City Place Beehive Ring Road GATWICK RH6 0PA England
Address: Hoback Solar Farm Hoback Farm Cambridge Road Wimpole SG8 5QB England

Site Name: Hoback Solar Farm
Generator Type: Photovoltaic
Scheme : REGO Generator ID: G05780PVEN
Capacity: 12950 Status: Live
Accreditation Date: 2/14/2013    
Commission Date: 11/3/2014    
Applicant: Hoback Solar Ltd
Applicant Address: 2nd floor 2 City Place Beehive Ring Road GATWICK RH6 0PA England
Address: Hoback Solar Farm Hoback Farm Cambridge Road Wimpole SG8 5QB England
 
Assumptions: Capacity: 12950kW 12.95 MW,
Thus over the month Capacity * 720 hours per month = 9324 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status
01/04/2018 1418 10.95% Issued
01/03/2018 1124 8.68% Issued
01/02/2018 928 7.17% Issued
01/01/2018 442 3.41% Issued
01/12/2017 389 3.00% Issued
01/11/2017 682 5.27% Issued
01/10/2017 1024 7.91% Retired
01/09/2017 1393 10.76% Retired
01/08/2017 1909 14.74% Retired
01/07/2017 2112 16.31% Retired
01/06/2017 2302 17.78% Issued
01/05/2017 2110 16.29% Issued
01/04/2017 2043 15.78% Issued
01/03/2017 1482 11.44% Redeemed
01/02/2017 108 0.83% Redeemed
01/02/2017 550 4.25% Redeemed
01/01/2017 502 3.88% Redeemed
Dec-16 0540 405 3.13% Issued
Nov-16 0906 665 5.14% Issued
Oct-16 01559 1130 8.73% Issued
Sep-16 01960 1413 10.91% Issued
Aug-16 03084 2215 17.10% Issued
Jul-16 03201 2286 17.65% Issued
Jul-16 03201 2286 17.65% Issued
Jun-16 02746 1961 15.14% Issued
May-16 03119 2228 17.20% Issued
Apr-16 02704 1943 15.00% Issued
Feb-16 01399 1015 7.84% Redeemed
Nov-15 0590 438 3.38% Redeemed
Oct-15 01401 913 7.05% Redeemed
Sep-15 02101 147 1.14% Redeemed
Aug-15 02383 170 1.31% Redeemed
Jul-15 19282698 1736 13.41% Redeemed
Jun-15 22613166 225 1.74% Redeemed
May-15 22823195 2056 15.88% Redeemed
Apr-15 21132958 209 1.61% Redeemed
Mar-15 13431865 1210 9.34% Redeemed
Feb-15 7281004 656 5.07% Redeemed
Jan-15 385522 347 2.68% Redeemed
Dec-14 411556 370 2.86% Redeemed
Nov-14 240318 217 1.68% Redeemed

Project Info
HOBACK Farm Planning Application

tgc renewables case study HOBACK farms

Solarcentury to build 17.5MWp site in Hertfordshire
HOBACK Solar Farm will be the largest project built by Solarcentury to date and is the fifth time the company has attracted investment from BSIF.

Planning submitted for Cambridgeshire solar farm
In order to provide solar power to some 3,300 homes in the local area, TGC Renewables has submitted a planning application for an 82 acre site on HOBACK Farm, Wimpole.

©2018 Simon Mallett
Latest News Added
Carn Nicholas
Drone footage
Date and Time of entry: Tuesday, March 19, 2024 00:00

Carn Nicholas Solar Park
The site, developed and constructed by Innova Renewables, was energised earlier this year following the beginning of its construction in May 2022.
Date and Time of entry: Tuesday, March 19, 2024 00:00

Dorset Green
Dorset Green H2 – South West’s first solar to green hydrogen production plant ready to produce clean, zero emission, green renewable energy
Date and Time of entry: Tuesday, March 19, 2024 00:00

Dragon LNG Meadow

Date and Time of entry: Tuesday, March 19, 2024 00:00

Pretoria rd looking towards Ellistown.Solar farm.

Date and Time of entry: Tuesday, March 19, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School