Ardoch and Over Enoch Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Subscribers see an interactive map with Ardoch and Over Enoch Wind Farm and local projects displayed.

( Subscribe for £100 )to have full access to all Wind projects and details.


Subscribe to Wind for exact generator location including nearby generators
For an example of a wind project see: Little Cheyne Court Wind Farm


Subscribe for £500 to include full csv and KML downloads of all Wind project data.

To create a login account see: User Registration. This will allow 30 page views each session rather than 5

One subscription covers your organisation / school / university / company . NOT per user

Ardoch and Over Enoch Wind Farm (Wind , Active)

 General Information.

Location in the UK : Scotland, eaglesham    
Type of installation: Wind    on/offshore: on
Turbines :5  Capacity : 11.5 MW
Approx Date of 1st power generation: November 2014

Subscribe to Renewables Map to see: Wind Turbines make / model / hub height / elevation / latitude and longitude. Accurate data available for 99% of all Active wind farms listed, also cross reference to DECC and OFGEM datasets

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

Planning permission was granted, in 2012 and has since entered into the construction phase. The construction period is due to be completed in Q4 2014.

Turbine deliveries will kick off in mid-2014 via the port of King George V in Glasgow. Completion is planned for autumn 2014.
The manufacturer will also provide long-term service and maintenance services to help ensure productivity, reliability and availability of the 110-metre tall turbines, it said.

 Turbine Make and Specs

For Wind projects, Subscribed version includes Turbine data, average hub height, average elevation
Subscriber Register

 Address

Ardoch Farm, Over Enoch Road, Eaglesham, East Renfrewshire G76 0PL

 Associated Companies.

Relationship Company (For: Ardoch and Over Enoch )
Developer2020 Renewables
Owner2020 Renewables

 DECC Data on this Project: Ardoch and Over Enoch :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Ardoch and Over Enoch Wind Farm (Ardoch)     7.2 MW
Energy Type: Wind Onshore
County: Strathclyde     Country: Scotland     LPA: East Renfrewshire Council
Site ID and Reference: 3925 / C1585     District:
Applicant: 2020 Renewables/ NTR     Application : 2012/0331/TP (Go to search to find Application)
For Wind Farms  
Number of Turbines: 3 Turbine Capacity: 2.5
Height of Turbines: 110 Calculated capacity: 7.5
Site Address: Ardoch Farm, Over Enoch Road, Eaglesham, East Renfrewshire
  G76 0PL
County: Strathclyde Region: Scotland
OS Coordinates: 258534 / 258534
Development Status: Operational
Application Submitted: 5/24/2012 Planning Permission Granted
Application Determined: Permission refused:
Construction Date: 11/5/2013    
Generator Live 11/12/2014 This Record Last Updated: 10/25/2016
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

Site Name: Ardoch and Over Enoch Wind Farm (Over Enoch)     4.3 MW
Energy Type: Wind Onshore
County: Strathclyde     Country: Scotland     LPA: East Renfrewshire Council
Site ID and Reference: 3855 / AA999     District:
Applicant: 2020 Renewables/ NTR     Application : 2011/0630/TP (Go to search to find Application)
For Wind Farms  
Number of Turbines: 2 Turbine Capacity: 2.2999999999999998
Height of Turbines: 110 Calculated capacity: 4.6
Site Address: Over Enoch Road, Eaglesham, East Renfrewshire
  G76 0PN
County: Strathclyde Region: Scotland
OS Coordinates: 258600 / 258600
Development Status: Operational
Application Submitted: 9/27/2011 Planning Permission Granted
Application Determined: Permission refused:
Construction Date: 11/5/2013    
Generator Live 11/12/2014 This Record Last Updated: 10/25/2016
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Ardoch and Over Enoch: Wind :

Site Name: AOE Windfarm
Generator Type: Wind
Scheme : REGO Generator ID: G02097NWSC
Capacity: 11433 Status: Live
Accreditation Date: 9/27/2011    
Commission Date: 10/12/2014    
Applicant: AOE Windfarm Limited
Applicant Address: c/o 2020 Renewables Ltd Suite F3 22 Pottery Street GREENOCK PA15 2UZ Scotland
Address: Ardoch & over Enoch Wind Farm Arnoch Farm Eaglesham G76 0PN Scotland
 
Assumptions: Capacity: 11433kW 11.433 MW,
Thus over the month Capacity * 720 hours per month = 8231.76 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status
01/04/2018 2723 23.82% Issued
01/03/2018 3077 26.91% Issued
01/02/2018 2596 22.71% Issued
01/01/2018 3725 32.58% Issued
01/12/2017 3207 28.05% Retired
01/11/2017 2762 24.16% Retired
01/10/2017 4153 36.32% Retired
01/09/2017 1973 17.26% Retired
01/08/2017 2192 19.17% Issued
01/07/2017 2154 18.84% Issued
01/06/2017 2746 24.02% Retired
01/05/2017 1863 16.29% Issued
01/04/2017 2820 24.67% Issued
01/03/2017 3083 26.97% Issued
01/02/2017 3298 28.85% Issued
01/01/2017 2633 23.03% Issued
Dec-16 03724 4138 36.19% Pending Tr
Nov-16 01923 2137 18.69% Pending Tr
Oct-16 01247 1395 12.20% Pending Tr
Sep-16 02506 2784 24.35% Pending Tr
Aug-16 01978 2198 19.23% Pending Tr
Jul-16 01832 2036 17.81% Pending Tr
Jul-16 01832 2036 17.81% Pending Tr
Jun-16 0993 1113 9.73% Pending Tr
May-16 01926 2140 18.72% Pending Tr
Apr-16 01773 1970 17.23% Pending Tr
Mar-16 01864 2071 18.11% Redeemed
Feb-16 02794 3104 27.15% Redeemed
Jan-16 02934 3260 28.51% Redeemed
Dec-15 04144 4605 40.28% Redeemed
Nov-15 03437 3819 33.40% Redeemed
Oct-15 01514 1691 14.79% Redeemed
Sep-15 0931 1043 9.12% Redeemed
Aug-15 01703 513 4.49% Redeemed
Jul-15 17641588 1764 15.43% Redeemed
Jun-15 22161994 2216 19.38% Redeemed
May-15 34903141 3490 30.53% Redeemed
Apr-15 22131982 2214 19.36% Redeemed
Mar-15 38343450 3834 33.53% Redeemed
Feb-15 29292636 2928 25.61% Redeemed
Jan-15 46944225 4694 41.06% Redeemed
Dec-14 41953776 4195 36.69% Redeemed
Nov-14 16921523 1692 14.80% Redeemed
Oct-14 16221446 1623 14.20% Redeemed

 Calculations


Capacity: 23
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 25 m/s (55.925 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 3/29/2024
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 23 start: 5 Optimum: 15/ Stop: 25 / wind: / ratio 350691

Project Info
2020 Renewables: ARDOCH AND OVER ENOCH Wind Farm

Velocita ties down 11.5MW project finance
Velocita Energy has secured non-recourse construction financing from ING for the 11.5MW ARDOCH AND OVER ENOCH (AOE) wind complex in East Renfrewshire, Scotland.

First turbine base constructed on ARDOCH AND OVER ENOCH Wind Farm
The construction of the first of five turbine bases commenced last week on our ARDOCH AND OVER ENOCH wind farm site, with all five bases on track to be completed prior to Christmas.

Siemens wins new order with Velocita in Scotland
Siemens has announced the signing of a new order with AOE Windfarm Limited (a subsidiary of Velocita Energy Developments) at ARDOCH AND OVER ENOCH in Scotland for 5 x 2.3-93 WTGs with 63.3m hub height

©2018 Simon Mallett
Latest News Added
Carn Nicholas
Drone footage
Date and Time of entry: Tuesday, March 19, 2024 00:00

Carn Nicholas Solar Park
The site, developed and constructed by Innova Renewables, was energised earlier this year following the beginning of its construction in May 2022.
Date and Time of entry: Tuesday, March 19, 2024 00:00

Dorset Green
Dorset Green H2 – South West’s first solar to green hydrogen production plant ready to produce clean, zero emission, green renewable energy
Date and Time of entry: Tuesday, March 19, 2024 00:00

Dragon LNG Meadow

Date and Time of entry: Tuesday, March 19, 2024 00:00

Pretoria rd looking towards Ellistown.Solar farm.

Date and Time of entry: Tuesday, March 19, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School